Missouri to Utah: residential contractor license reciprocity
Missouri does not issue a statewide residential contractor license, so there is nothing to transfer. Here is Utah's standard path for out-of-state applicants.
Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.
Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.
Applicants from jurisdictions DOPL has not determined equivalent, including the NASCLA examination route (all other states)
Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.
An applicant whose home jurisdiction is not shown in green on DOPL’s Endorsement to Utah: Contractor map takes the ordinary route, which for R100 involves no trade examination at all. The qualifier completes an approved 25-hour pre-licensure course plus the five-hour Business and Law course, passes the Utah Contractor Business and Law examination through Prov, and shows two years, meaning 4,000 hours, of paid work experience in the construction industry. That experience travels freely: it counts wherever it was earned, whether the qualifier was paid as a W-2 employee or as an owner and whether the work was licensed or exempt, and it is self-certified on the application rather than verified by an employer, so out-of-state years are not lost. A qualifier who has passed the NASCLA Accredited Examination for Commercial General Building Contractors does not have to document the two years at all: Utah Admin. Code R156-55a-302b(2)(b)(i) accepts a passing NASCLA score in place of the experience requirement for every general classification, R100 included, and the application has a box for it. A Construction Management degree or an active Utah professional engineer license does the same. NASCLA does not remove the Business and Law examination or the pre-licensure courses. Where the origin jurisdiction issues no equivalent state-wide license, DOPL will still look at a city or county license, or a non-equivalent state license, as evidence towards Utah’s qualifications if the applicant files a verification showing the hours, examinations and other qualifications behind it.
Two things on DOPL’s published materials do not line up, and both are worth a phone call to the Division on (801) 530-6628 before paying any fee. First, the Apply for a General Contractor License page lists, as an alternative to the Business and Law examination, "One (1) year of licensed experience working in another State, District or Territory of the U.S. in the similar scope of practice sought in Utah if the license is currently active and in good standing", with no mention of an equivalency list, while Utah Admin. Code R156-55a-302a(3) waives that examination only "for an applicant for licensure by endorsement under Section 58-1-302" and the application checklist limits endorsement to "a jurisdiction determined equivalent to Utah" on a map last updated 21 September 2020. Second, the current rule and both apply pages set general liability cover at $1,000,000 each incident and $2,000,000 in total, while the March 2026 application form prints a $3,000,000 aggregate. On the map itself, the jurisdictions shaded yellow as "Limited to Specific Classifications" (Colorado, Connecticut, Delaware, Idaho, Illinois, Indiana, Iowa, Kentucky, Maine, Missouri, Montana, Nebraska, New Hampshire, New Jersey, Ohio, Oklahoma, Texas, Vermont, Washington, Wisconsin, Wyoming and the District of Columbia) are ones DOPL says do not license contractors generally but may license a specific specialty such as electrical, plumbing, HVAC or elevator work, which is not an equivalent to a R100 license; the jurisdictions shaded grey as having no equivalent license are Kansas, New York, North Dakota, Pennsylvania, South Dakota, Puerto Rico and the Northern Mariana Islands. Utah Code 58-1-302(2) is written state-neutrally and turns on scope of practice rather than on any named partner, and the map ends by inviting applicants to contact the Division if licensure laws have changed, so an applicant from a yellow or grey jurisdiction holding a license of genuinely similar scope can ask DOPL to look again.
At a glance
- Trade exam
- Waived
- Law / code exam
- Required
- Out-of-state hours
- Count toward eligibility
What you must already have
- You must document at least 4,000 hours of qualifying work experience.Utah Admin. Code R156-55a-302b(1) reads the requirement broadly: experience counts whether the qualifier was paid as a W-2 employee or as an owner and whether the work was licensed or exempt, and it includes construction work done in the military or for a railroad corporation and work done under a construction trades instructor as part of an educational program. It need not be supervisory and need not match the classification sought. An applicant who is a building inspector may substitute two years as a building inspector including one year as a licensed combination inspector, and an E100 applicant needs four years instead.
- You must have passed a licensing exam in Missouri that the destination considers comparable.Utah Admin. Code R156-55a-302b(2)(b)(i) states that a passing NASCLA score satisfies the experience requirement in Utah Code 58-55-302(1)(e)(ii)(A), and DOPL’s contracting FAQ repeats it in the same words. The rule is written for the general classifications as a group rather than for B100 alone, and both the apply page and the qualifier affidavit offer the NASCLA box to every general classification applicant, so it is available at this residential level too. NASCLA is an examination credential, not a license and not an interstate agreement, so any applicant may use it whatever state they come from. It waives nothing else: the pre-licensure courses, the Utah Contractor Business and Law examination, insurance, financial responsibility, registration, background checks and fees all still apply.
- The qualifier must be either an owner of at least 20 per cent of the licensee or a W-2 employee in a management position, and must be paid for at least 12 hours of work a week for the licensee. A qualifier may not qualify more than three licensees at one time without the written approval of the Commission and the Division.
What you'll do to get licensed in Utah
- 1Other. Approved pre-licensure education completed by the qualifier before applying: a 25-hour pre-licensure course plus the five-hour Business and Law course, 30 hours in total for a general classification. DOPL accepts the course only from Associated Builders and Contractors (ABC), the Utah Home Builders Association (UHBA) or the Associated General Contractors of Utah (AGC); a qualifier who completed the 25-hour course before 1 October 2019 does not need the extra five hours. The Division does not publish the providers’ course prices, so ask the provider..
- 2Law / code exam. Pass a law, rules, or code exam. Utah Contractor Business and Law examination, taken by the qualifier through Prov either at one of 21 Utah test centers or remotely through Prov’s Examroom service. It is 60 questions in two hours, open reference, and the cut score is 70 per cent; the subject areas are business organization, licensing, estimating and bidding, contract management, project management, labor laws, lien laws, financial management, risk management, tax laws and safety. No DOPL pre-approval is needed to sit it, and a failed attempt may be retaken after 30 days for each of the first three failures and after six months for any failure after that. Pass before submitting the application..
- 3Exam fee. Pay the exam fee ($85). Prov examination fee for the Utah Contractor Business and Law exam, paid to Prov and charged again for each retake..
- 4Application fee. Pay the application fee ($175). Non-refundable DOPL application processing fee of $175 for each classification requested (application version v20260327). A contractor asking for more than one classification pays it more than once..
- 5Application fee. Pay the application fee ($50). Non-refundable DOPL application processing fee of $50 for each qualifier named on the application..
- 6Application fee. Pay the application fee ($1). Electronic Reference Library surcharge of $1, collected on every application to fund licensee access to national, state and local building codes and standards. An unincorporated applicant also pays $20 for each owner holding less than 8 per cent, filed with the Appendix F Owner-Worker Status Report..
- 7Insurance. Carry the required insurance ($1,000,000). General liability insurance certificate naming DOPL as certificate holder, covering the whole scope of work on the license and in force for the entire duration of active licensure. Utah Admin. Code R156-55a-302d and both DOPL apply pages set the minimum at $1,000,000 for each incident and $2,000,000 in total; the March 2026 application form prints $3,000,000 as the aggregate, so confirm the figure with the Division on (801) 530-6628 before binding cover. The cover must be kept up even while the contractor is not working, unless the license is placed on inactive status..
- 8Insurance. Carry the required insurance. Workers’ compensation insurance naming DOPL as certificate holder if the applicant has employees or owner-workers holding less than 8 per cent, together with a Utah State Tax Commission withholding account number and a Department of Workforce Services unemployment registration number, or a signed contract with an approved Professional Employer Organization. An applicant with no employees files a Workers’ Compensation Coverage Waiver from the Utah Labor Commission instead and must tell DOPL in writing before any employee starts work..
- 9Financial responsibility. Show financial responsibility. Satisfactory evidence of financial responsibility. Utah Code 58-55-306 lets this be shown by completing and signing the Division’s financial responsibility questionnaire, which asks about judgments, liens, tax liens and child support delinquencies in the past eight years and bankruptcy in the past seven, or by posting a bond. DOPL publishes no minimum net worth, working capital or credit score, and it may audit at random or on reasonable need, weighing judgments, restitution orders, collection actions, bankruptcy schedules, late payment history, financial statements, tax returns and a current credit report. For an unincorporated applicant the Division considers each owner’s personal finances..
- 10Surety bond. Post a surety bond ($25,000) (if applicable). License bond, required only where the Division is not satisfied that financial responsibility has been demonstrated. Under Utah Admin. Code R156-55a-602 the minimum is then the greater of 30 per cent of the cumulative outstanding debts, judgments, liens and obligations of the entity, its owners and qualifiers, or $25,000 for the R100 classification. A bankruptcy filed, pending or discharged within three years instead sets it at 30 per cent of the total liabilities scheduled with the bankruptcy court. The surety must appear in Treasury Circular 570, the bond runs until DOPL gives written permission to drop it, and the Commission may set a higher or, on clear and convincing evidence, a lower amount..
- 11Business license. Obtain a business license. Registration with the Utah Division of Corporations and Commercial Code for any corporation, LLC, LLP or partnership, including an out-of-state entity, plus a federal Employer Identification Number; a sole proprietor may use a Social Security number and is licensed in their own given name. The license is issued in the registered legal name, business must be done in that name unless a DBA owned by the licensee is separately filed with DOPL, and if the corporate registration lapses the contractor license expires with it by statute..
- 12Background check. Complete a background check. Criminal background check under Utah Code 58-1-301.5 consented to and completed by the qualifier and by every individual holding at least a 10 per cent voting interest in the applicant, with disclosure of any criminal history the Division asks for. A yes answer on the qualifying questionnaire about discipline, pending criminal action, a misdemeanour in the past ten years or a felony at any time brings a requirement to file a personal account, police reports, court records and probation or parole reports for each incident..
- 13Continuing education. Complete continuing education. Six hours of approved continuing education in each two-year license term, of which at least three must be core education and at least three must be live in-class attendance, with no more than three hours online, and at least one hour in energy conservation. It is a condition of renewal rather than of getting the license. Licenses expire on 30 November of each odd-numbered year..
Published fees on this path total $311, excluding exam-vendor fees, bonds, and insurance.
What you'll need to buy or arrange
Exam preparation
Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.
- Other
- Law / code exam
- Exam fee · $85
Liability insurance
Some states require proof of general liability or workers' compensation coverage at licensing time.
- Insurance · $1,000,000
- Insurance
Surety bond
A license or contractor bond is bought from a surety, not the state. Price is a small percentage of the bond amount and depends on your credit.
- Surety bond · $25,000 · if applicable
Business registration
If you plan to contract in your own name, budget for a business license or entity registration on top of the trade license.
- Business license
Continuing education
Renewals usually need approved CE hours, often on the latest NEC. Reciprocal licensees are rarely exempt.
- Continuing education
How Utah licenses residential contractors
Utah residential contractor · “R100 Residential and Small Commercial Contractor”
Statewide license
Issued by Utah Division of Professional Licensing (DOPL)
Utah licenses contractors statewide through the Division of Professional Licensing (DOPL) under the Utah Construction Trades Licensing Act, Utah Code 58-55, and Rule R156-55a, and the homes tier is the R100 Residential and Small Commercial Contractor classification. Utah Code 58-55-102(42) defines it as the construction of single-family residences, multifamily residences up to four units, and commercial construction of not more than three stories above ground and not more than 20,000 square feet, together with any component of that construction except plumbing, electrical, mechanical and manufactured housing work, for which an R100 must employ a contractor licensed in the specialty; on single-family and multifamily residences up to four units the R100 may perform the mechanical work and employ a licensed plumber or electrician. Anything larger needs B100 General Building Contractor, and fixed works needing specialized engineering knowledge need E100 General Engineering Contractor. Smaller jobs can instead be taken under the specialty classifications, which need no experience and no examination: R101 Residential and Small Commercial Non-Structural Remodel and Repair (which may not be combined with any other specialty), R200 Factory Built Housing, B200 Modular Unit Installation and the S-series such as S220 Carpentry and Flooring, S270 Drywall, Paint and Plastering and S280 Roofing. The license belongs to the business, not the person: the entity applies and names a qualifier, an owner of at least 20 per cent or a W-2 employee in a management position paid for at least 12 hours a week, and that qualifier is the one who satisfies the course, experience and examination requirements. There is no Utah trade examination for R100; the only DOPL examination is the Utah Contractor Business and Law exam. Licenses expire on 30 November of each odd-numbered year and renewal takes six hours of continuing education.
Why Missouri has nothing to transfer
Missouri residential contractor · “Residential Building Contractor / Class C general contractor / construction business license (city-issued)”
Licensed by cities and counties
Issued by No state authority; cities and counties license, register or exempt residential contractors
Missouri issues no statewide residential contractor, home builder or remodeler license. The Division of Professional Registration's own list of regulated professions contains exactly one construction trade - Electrical Contractors - and Title XXII of the Revised Statutes, which holds every occupational licensing chapter from 324 to 346, has no chapter for contractors or builders at all. The one statewide construction credential Missouri does offer is the voluntary electrical contractor license under RSMo 324.900 to 324.945, and its own definitions confine it to electrical contracting; there is no building-contractor equivalent, so a residential builder has nothing at state level to apply for or transfer. Plumbers are examined by cities over 15,000 people and by first-classification counties under RSMo chapter 341, again locally rather than by a state board. Housebuilding is therefore regulated jurisdiction by jurisdiction, and Missouri splits sharply in two: Kansas City and Independence run genuine competency programs built on ICC or Prometric examinations, while St. Louis City, St. Louis County, Springfield, Columbia and Jefferson City ask a residential builder for nothing more than a business license and proof of workers' compensation. A contractor moving to Missouri qualifies separately in each place where permits will be pulled, and in the two testing cities the credential that actually travels is a passing score on a recognized national residential-builder examination rather than another state's license.
How local licensing works in Missouri
How it works in Missouri. There is no state contractor board, no state application and no state exam. Each city or county writes its own ordinance, so a builder holds whatever the local jurisdiction requires everywhere it works, and a credential from one Missouri city does not carry into the next of its own force. The single statewide preemption in Missouri construction law is the electrical one: RSMo 324.925 forces every political subdivision to recognize a statewide electrical contractor license and bars it from testing that holder's electrical proficiency. Nothing equivalent exists for builders, and the statute expressly leaves cities free to license and examine in other trades. What that produces is two very different kinds of place. In Kansas City and Independence a residential builder is examined and personally qualified. In St. Louis City, St. Louis County, Springfield, Columbia and Jefferson City the trades are examined and the builder is not - the builder simply buys a business license.
Kansas City. City Planning & Development runs a two-part system under Article XII of the Kansas City Building and Rehabilitation Code, and it is the only place in Missouri with a purpose-built residential builder credential. An individual first earns the Residential Building Supervisor certificate of qualification, which covers "constructing, structurally altering or enlarging any one- or two-family detached dwelling or townhouse including detached accessory buildings in excess of 400 square feet." The applicant files an application with a $60.00 nonrefundable fee and "shall earn a passing score on one of the two recognized exams administered for Kansas City, Missouri: the residential construction (10344) examination administered by Prometric or the standard residential building contractor (W13) examination administered by ICC." The exam is waived where the applicant holds "a passing score on a standard Prometric or ICC examination or other department-approved national testing agency examination comparable in content," documented to the Building Official's satisfaction - and the city states outright that it built the program to match Independence and Johnson County, so "if you have passed a residential builder exam in either of these jurisdictions, you will not be required to retest," and continuing education hours earned there count toward renewal. Being a Missouri-registered engineer or architect does not substitute for the exam. The company then applies for the Residential Building Contractor license, which needs a full-time managerial employee holding the supervisor certificate (the owner may be that person), a business license from the Finance Department, a current Missouri Secretary of State registration and a certificate of insurance carrying at least a $1,000,000 aggregate limit per occurrence and naming the City of Kansas City as additional insured. Fees are $60.00 to apply and $181.00 to issue, with $181.00 quadrennial renewals on both the license and the certificate; the certificate itself is free for its first four years. Applications go through CompassKC; [email protected], (816) 513-1500.
Independence. The city licenses the individual, not the company: "contractor licenses belong to the licensed individual, NOT a company," and "anyone hired to complete permittable work within the City of Independence" needs one. The residential tier is the Class C general contractor license, described as residential only, and the license "covers framing, footings, and general construction." Qualification is one of three things: ICC or Prometric test scores from within the last five years at 75 percent or better; "a current, active license with a jurisdiction that we reciprocate with," which the city defines broadly as "any jurisdiction that issues licenses in a similar fashion"; or, for a general contractor license, a bachelor's degree in engineering, architecture or construction science from an accredited college or university. Licenses expire on December 31 every year with no proration. A business license shows you may trade in the city; the contractor license shows you are qualified to do the work, and you need both. Authorized users may be added to a license, but the holder answers for their work. [email protected], (816) 325-7401.
St. Louis City. The Building Division operates four boards of examiners - electrical, mechanical contractors and pipefitters, plumbers and drainlayers, and sprinkler system contractors - and none of them touches building contractors. A residential builder needs a construction or contracting business license from the License Collector: a state tax number, the application form, clearance from the Collector of Revenue, an occupancy permit from the Building Division, and proof of workers' compensation coverage or a signed statement that the law does not require it. The city also requires that "all general contractors ... furnish a list of the sub-contractors on any job to the License Collector." No exam, experience or bond applies. Building Division, City Hall Room 425, 1200 Market St., (314) 622-3313.
St. Louis County. The county is explicit: "the County does not license general contractors," though it "does verify that out-of-state contractors are registered with the state," and it "does register all repair contractors that obtain permits for repairs from a natural disaster such as a flood or severe storm." What it does license is the trades, through Transportation and Public Works: electrical licensing, mechanical licensing (four contractor categories under the county Mechanical Code) and plumbing licensing, each with its own board, and "the County only issues trade permits to licensed contractors." A homebuilder in unincorporated St. Louis County therefore pulls permits without a county builder credential but must use licensed trade contractors. 41 South Central Ave., 6th Floor, Clayton, 314-615-5184. Note that most of the county's ninety-odd municipalities run their own building departments, so check the city as well.
Springfield. Building Development Services will not issue a permit until "a City-licensed General Contractor (GC) or Trade Master (TM) ... is listed on the permit," so the credential is mandatory - but it is a business license, obtained from the License Division, not a tested qualification. Springfield's testing program covers the crafts only: "electricians, plumbers, gas fitters, and mechanical craftsmen must be tested and certified to afford competence and knowledge of the codes," and those trades may substitute an out-of-jurisdiction exam score of 75 percent or better from Prometric, Experior, Block or ICC where the examination is identical to Springfield's. Contractors who carry workers' compensation file proof of it; those who are not required to carry it sign a notarized exemption statement. Permit desk 417-864-1585, License Division 417-864-1617.
Columbia. Community Development's Building and Site Development division licenses trades only - Trade Apprentice, Electrical Certification, Mechanical Certification and Plumbing Certification - because "electricians, plumbers, gas fitters and mechanical craftsman must be tested and certified," with the tests "administered by a private testing firm according to a regular schedule." There is no builder certification and no board of building examiners. A residential contractor takes out a city business license instead: $0.25 per $1,000 of gross receipts with a $75 annual minimum, a $10,000 annual maximum and a $45 application fee, plus a certificate of workers' compensation insurance for any construction business with one or more employees. Business License Division 573-874-7378.
Jefferson City. "All contractors performing work in Jefferson City must have a local license," but the split is the same as elsewhere: "electrical and plumbing contractors and their employees are required to obtain specific trade licenses directly from the Building Regulations Division," while "all other contractors are directed to the Business License Division to obtain their business license." A residential builder therefore files for the business license and takes no examination. Building Regulations (573) 634-6410, Business License Division (573) 634-6322.
Everywhere else. Missouri's other cities and counties set their own rules, and many require nothing but a permit and proof of insurance. Ask each building department what it licenses before you contract there. If you plan to sit an examination anywhere in Missouri, the practical move is the ICC standard residential building contractor (W13) or the Prometric residential construction (10344) paper, because those are the two Kansas City names outright and the same scores satisfy Independence, and a passing result documented from an approved agency is the nearest thing Missouri has to a transferable builder credential.
- Kansas City (City Planning & Development - Residential Building Contractor license and Supervisor certificate, exam required)
- Independence (Community Development - Class C general contractor license, exam or reciprocal license required)
- St. Louis City (License Collector - construction/contracting business license; Building Division examines trades only)
- St. Louis County (no general contractor license; electrical, mechanical and plumbing licensing only)
- Springfield (Building Development Services - City-licensed General Contractor must be named on the permit)
- Columbia (Building and Site Development - trade certifications only; contractors hold a city business license)
- Jefferson City (Building Regulations Division - electrical and plumbing licensed; all other contractors take a business license)
Common questions
- Do I have to take the Utah residential contractor exam if I'm licensed in Missouri?
- The trade exam is waived, but Utah requires a law or code exam.
- What does it cost to get a Utah residential contractor license from Missouri?
- Published fees on this path total $311, not counting exam vendor fees or bonds.
- Do my Missouri work hours count in Utah?
- Yes. Documented out-of-state experience counts toward Utah's eligibility requirements.
- Does it work the other way, from Utah to Missouri?
- Not necessarily. Reciprocity is directed. Going from Utah to Missouri, the mechanism is not applicable.
Sources
- NASCLA Accredited Examination for Commercial General Building Contractors · National Association of State Contractors Licensing Agencies · Other · verified September 17, 2026
- Utah Code 58-1-302 - License by endorsement · Utah Code 58-1-302(2) · Utah State Legislature · Statute · verified September 17, 2026
- Utah Code 58-55-102 - Definitions (Utah Construction Trades Licensing Act) · Utah Code 58-55-102(20), (26), (42) · Utah State Legislature · Statute · verified September 17, 2026
- Utah Code 58-55-302 - Qualifications for licensure · Utah Code 58-55-302(1)(c)(ii), (1)(e)(ii), (1)(e)(iii), (1)(e)(iv), (1)(e)(vii), (2)(b) · Utah State Legislature · Statute · verified September 17, 2026
- Utah Code 58-55-306 - Financial responsibility · Utah Code 58-55-306 · Utah State Legislature · Statute · verified September 17, 2026
- Utah Contractor Application - All Classifications (with qualifier affidavit, checklist and fee table) · Utah Code 58-55-306; Utah Admin. Code R156-1-301, R156-55a-602 · Utah Division of Professional Licensing (DOPL) · Form · verified September 17, 2026
- Endorsement to Utah: Contractor (state-by-state equivalency map) · Utah Code 58-55; 58-1-302 · Utah Division of Professional Licensing (DOPL) · Other · verified September 17, 2026
- Utah DOPL - Contracting licensing home page · Utah Division of Professional Licensing (DOPL) · Agency Page · verified September 17, 2026
- Utah DOPL - Contracting Continuing Education · Utah Division of Professional Licensing (DOPL) · Agency Page · verified September 17, 2026
- Utah DOPL - Contracting Exam Information · Utah Division of Professional Licensing (DOPL) · Agency Page · verified September 17, 2026
- Contracting Frequently Asked Questions (DOPL) · Utah Division of Professional Licensing (DOPL) · Faq · verified September 17, 2026
- Apply for a General Contractor License (DOPL) · Utah Division of Professional Licensing (DOPL) · Agency Page · verified September 17, 2026
- Apply for a Specialty Contractor License (DOPL) · Utah Division of Professional Licensing (DOPL) · Agency Page · verified September 17, 2026
- State of Utah Contracting Exam - Examination Handbook (Prov, for DOPL) · Prov, Inc., examination administrator for the Utah Division of Professional Licensing · Other · verified September 17, 2026
- Utah Admin. Code R156-55a - Utah Construction Trades Licensing Act Rule · Utah Admin. Code R156-55a-301c, -301h, -302a, -302b, -302d, -302f, -303a, -303b, -304, -306, -602 · Utah Office of Administrative Rules · Admin Rule · verified September 17, 2026
Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.