Missouri to Oregon: journeyman electrician license reciprocity
Missouri does not issue a statewide journeyman electrician license, so there is nothing to transfer. Here is Oregon's standard path for out-of-state applicants.
Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.
Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.
Examination with credit for out-of-state experience (all non-reciprocal states)
Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.
An electrician licensed in a state without an Oregon reciprocity agreement applies for the General Journeyman license on the standard Electrical License Application and must pass the Oregon journeyman exam (52 questions, three hours, open book; 75 percent to pass). Out-of-state experience counts toward eligibility: either official transcripts showing 576 classroom hours plus verified 8,000 hours of on-the-job experience with at least 1,000 hours each in residential, commercial and industrial work, or 16,000 verified on-the-job hours with at least 2,000 hours in each category. Experience is documented with one Electrical Experience Verification Form per employer. Under ORS 479.632 the board may decline to examine an applicant whose out-of-state training or experience it finds not equivalent to Oregon's.
The Oregon journeyman exam is a single open-book exam; no separate law or rules exam is published. The $100 fee paid with the Electrical License Application (form 440-2570) is the only fee: under ORS 479.840 it is both the application fee and the fee for the three-year license, and no separate exam fee is charged.
At a glance
- Trade exam
- Required
- Law / code exam
- Not required
- Out-of-state hours
- Count toward eligibility
- Typical processing
- About 21 days
What you must already have
- 576 classroom hours of electrical training plus 8,000 verified on-the-job hours obtained outside Oregon (minimum 1,000 hours each in residential, commercial and industrial), OR 16,000 verified on-the-job hours obtained outside Oregon (minimum 2,000 hours in each category).OAR 918-282-0170 also sets minimum hours in the other work categories: stock room and material handling 100; intercommunication, signal and control systems 500; underground construction 100; troubleshooting and maintenance 250; finishing and fixture hanging 50. Together with the 1,000 hours each of residential, commercial and industrial work, that is 4,000 minimum subject hours, and no category may be credited at more than three times its minimum.
What you'll do to get licensed in Oregon
- 1License fee. Pay the license or certificate fee ($100). Application and three-year General Journeyman license fee, paid with the Electrical License Application (form 440-2570); nonrefundable. No separate exam fee..
- 2Trade exam. Pass the destination's trade exam. Oregon General Journeyman Electrician exam: 52 questions, 3 hours, open book; minimum score 75 percent.
Published fees on this path total $100, excluding exam-vendor fees, bonds, and insurance.
What you'll need to buy or arrange
Exam preparation
Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.
- Trade exam
How Oregon licenses journeyman electricians
Oregon journeyman electrician · “General Journeyman Electrician (J)”
Statewide license
Issued by Oregon Building Codes Division (Department of Consumer and Business Services)
Oregon issues a statewide General Journeyman Electrician (J) license through the Building Codes Division. An applicant without a reciprocal license must document either an approved apprenticeship, or 576 classroom hours plus 8,000 hours of on-the-job experience earned outside Oregon, or 16,000 out-of-state on-the-job hours, and then pass the Oregon journeyman exam. Under ORS 479.630 an Oregon Limited Residential Electrician may also qualify after two years under that license plus two more years of apprenticeship-level commercial and industrial work. Oregon has signed journeyman reciprocity agreements with Arkansas, Idaho, Maine, Montana, Utah, Washington and Wyoming; qualifying holders of those licenses are licensed without taking the Oregon exam. Licenses renew every three years on October 1 and require 24 hours of continuing education.
Why Missouri has nothing to transfer
Missouri journeyman electrician
Licensed by cities and counties
Missouri does not issue a journeyman electrician license. The only state-level electrical credential is the voluntary statewide electrical contractor license created by RSMo 324.900-324.945 (S.B. 240, 2017), and the Office of Statewide Electrical Contractors (OSEC) states that it covers only the electrical contractor, not the electricians the contractor employs. RSMo 324.925.3(8) expressly leaves cities and counties free to license electricians, provided the local license is based on professional experience and passage of a nationally accredited electrical assessment examination given on a routine schedule, and jurisdictions that did not license electricians before August 28, 2017 may not start. Journeyman licensing therefore happens city by city and county by county (Springfield, the City of St. Louis, St. Louis County, Kansas City and others), each with its own experience rules, exam and fees; there is no statewide reciprocity for journeymen. A journeyman arriving from another state must apply in each jurisdiction where they will work, though the widespread use of ICC, Prometric and other national exams means a previously passed exam is often accepted in place of retesting.
How local licensing works in Missouri
How local licensing works. Missouri has no state electrician license and no state electrical board for individuals. RSMo 324.925.3(8) permits any political subdivision that licensed electricians before August 28, 2017 to keep doing so, as long as the license rests on professional experience plus a nationally accredited Electrical Assessment Examination administered on a routine and accessible schedule. The OSEC FAQ for political subdivisions confirms the statewide contractor license does not extend to a contractor's employees. Requirements below are those verified on the jurisdictions' own pages.
Springfield. Building Development Services certifies Journeyman and Master craftsmen through the Building and Trades Board, which meets the first Thursday of each month. Journeyman Electrical requires 4 years under the supervision of a master in the trade or 6 years of experience in the trade, documented on notarized Applicant Experience forms (one per employer; 1099s for the self-employed). Approved applicants test through ICC (Pearson VUE, roughly $125) and need 75%. Reciprocity from another jurisdiction: submit the same experience forms plus a copy of an exam score notification of at least 75% from Prometric, Experior, Block or ICC on the identical exam Springfield requires, and the board can approve without further testing; the application also asks for any other states where the applicant is licensed and requires copies of those licenses. Fees: $25 initial journeyman certificate (covers the rest of the calendar year) and $25 annual renewal.
City of St. Louis. The Building Division's Committee of Electrical Examiners decides, through written and oral examination, whether applicants have the knowledge and experience for electrical certificates and licenses, testing practical installation competency, electrical theory and the St. Louis Electrical Code. Its page does not publish license classes, experience thresholds, fees or any reciprocity terms.
Other cities and counties. The practical path is to present a passing score on a nationally accredited journeyman exam (ICC, Prometric, Prov, PSI or NASCLA) together with documented experience to each city or county; Springfield explicitly accepts identical exams from Prometric, Experior, Block and ICC in lieu of retesting.
- Springfield (Building Development Services)
- City of St. Louis (Building Division, Committee of Electrical Examiners)
- St. Louis County (Transportation and Public Works, Electrical Licensing)
- Kansas City (City Planning and Development, Contractor Licensing)
Common questions
- Do I have to take the Oregon journeyman electrician exam if I'm licensed in Missouri?
- Yes. Oregon requires the trade exam on this path.
- What does it cost to get a Oregon journeyman electrician license from Missouri?
- Published fees on this path total $100, not counting exam vendor fees or bonds.
- Do my Missouri work hours count in Oregon?
- Yes. Documented out-of-state experience counts toward Oregon's eligibility requirements.
- How long does the application take?
- The board's published or typical processing time is about 21 days.
- Does it work the other way, from Oregon to Missouri?
- Not necessarily. Reciprocity is directed. Going from Oregon to Missouri, the mechanism is not applicable.
Sources
- Electrical License Application (form 440-2570), with Experience Verification (440-2570A) · Oregon Building Codes Division (DCBS) · Form · verified September 23, 2026
- Oregon Building Codes Division - Apply for an electrical license · Oregon Department of Consumer and Business Services, Building Codes Division · Agency Page · verified September 15, 2026
- Building Codes Division - Reciprocal licenses · Oregon Building Codes Division (DCBS) · Agency Page · verified September 16, 2026
- OAR chapter 918, division 30 - General Licensing Requirements · OAR 918-030-0010, 918-030-0015, 918-030-0020, 918-030-0030, 918-030-0060, 918-030-0120, 918-030-0150, 918-030-0210, 918-030-0230 · Oregon Secretary of State · Admin Rule · verified September 23, 2026
- OAR chapter 918, division 282 - Electrical licensing · OAR 918-282-0140, 918-282-0170 · Oregon Secretary of State · Admin Rule · verified September 23, 2026
- ORS chapter 479 - Protection of Buildings from Fire and Electrical Hazards · ORS 479.630, 479.632, 479.840 · Oregon Legislature · Statute · verified September 23, 2026
- Oregon License Directory - General Journeyman Electrician (J) · Oregon Secretary of State / Building Codes Division · Agency Page · verified September 23, 2026
Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.