LicensebyState

Illinois to District of Columbia: master electrician license reciprocity

No credit· Start overVerified September 15, 2026· 6 sources

Illinois does not issue a statewide master electrician license, so there is nothing to transfer. Here is District of Columbia's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Out-of-state master from a state other than Maryland or Virginia

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

The Board of Industrial Trades publishes reciprocity only for Maryland and Virginia. A master electrician from any other state applies through the DLCP online portal as a new applicant with employment verification letters, a letter of good standing and a copy of the state-issued license, pays the $65 application fee, must document the journeyman-level prerequisites plus at least 4 years of work as a journeyman electrician, and schedules the master exam with PSI. D.C. Code § 47-2853.12(b) directs boards to waive the exam for anyone licensed in good standing in a state with equivalent standards that reciprocates with the District, and § 47-2853.08 lets the Board find another state's standards substantially equivalent and license by reciprocity or endorsement, so an applicant may ask the Board to apply those provisions case by case; the Board's pages describe no such process beyond Maryland and Virginia. The national-certification substitute in § 47-2853.92(b-1) is written for the journeyman license only. No District-law exam is published for master electricians.

The Board's fee page refers exam fees to '§ 3500.3' without stating an amount; the PSI exam fee for the DC master exam could not be confirmed from an official page. Whether journeyman years worked under an out-of-state license count toward the 4-year journeyman requirement was not confirmed from an official page.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Count toward eligibility

What you must already have

  • You must document at least 8,000 hours of qualifying work experience.Journeyman-level prerequisite: at least 8,000 apprentice hours over at least 4 years, or an electrical engineering degree plus 2 certified years, or equivalent (D.C. Code § 47-2853.92(b)).
  • Worked as a journeyman electrician for at least 4 years (D.C. Code § 47-2853.92(c))
  • Completed a class on Title 12C DCMR (DC Electrical Code) or an equivalent code within the 2 years before applying

What you'll do to get licensed in District of Columbia

  1. 1Application fee. Pay the application fee ($65). Application fee (non-refundable).
  2. 2Trade exam. Pass the destination's trade exam. DC Master Electrician examination administered by PSI (schedule at psiexams.com after Board pre-approval).
  3. 3Exam fee. Pay the exam fee. PSI examination fee, amount set by 17 DCMR § 3500.3 (not stated on the Board page).
  4. 4License fee. Pay the license or certificate fee ($120). Master electrician license fee, 2-year term (renewal $155).

Published fees on this path total $185, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee

How District of Columbia licenses master electricians

District of Columbia master electrician · “Master Electrician

Statewide license

Verified September 15, 2026· 4 sources

Issued by DC Board of Industrial Trades (Department of Licensing and Consumer Protection)

The District of Columbia issues a person-held Master Electrician license through the Board of Industrial Trades in the Department of Licensing and Consumer Protection (DLCP). It is the District's highest individual electrician credential; the Board also issues a Master Electrician Limited (low voltage) specialty license with journeyman-level qualifications, and a separate Electrical Contractor business license that requires an electrical bond. Under D.C. Code § 47-2853.92(c) a master applicant must meet the journeyman requirements (a DC Electrical Code class within 2 years and 8,000 apprentice hours over 4 years or equivalent) and in addition have worked as a journeyman electrician for at least 4 years, then pass the PSI-administered master exam. Fees are a $65 application fee and a $120 license fee for a 2-year term ($155 on renewal). Maryland and Virginia master electricians licensed by examination are licensed by reciprocity without the DC exam under a program the Board opened on February 8, 2021.

Moving to District of ColumbiaLeaving District of Columbia

Why Illinois has nothing to transfer

Illinois master electrician

Licensed by cities and counties

Verified September 14, 2026· 12 sources

Illinois does not issue a statewide master electrician license and has no state electrical board; the Illinois Department of Financial and Professional Regulation does not license electricians. The master-level credential exists only at the municipal level, under names that vary by city: Chicago issues a Supervising Electrician license (2 years of experience plus a written exam) and separately licenses Electrical Contractors, Springfield issues an Electrical License based on 5 years of experience and the ICC Master Electrician exam, and Peoria, Aurora, Naperville and Elgin accept ICC Master/Residential Electrician certificates or licenses from Illinois testing municipalities. An out-of-state master electrician license carries no state-level recognition in Illinois and none of the major jurisdictions publish a reciprocity or endorsement path for it. A master electrician from another state must apply with each municipality where they will work, which typically means passing the ICC or local exam once and then registering as an electrical contractor in each additional city.

How local licensing works in Illinois

How local licensing works. Illinois has no state electrician license and no state electrical board. The Illinois Municipal Code (65 ILCS 5/11-33-1) allows each municipality to require registration of electrical contractors, with an annual fee of $25, and provides that a contractor registered in one municipality cannot be required to register or pay a fee in another. Anything beyond registration (examinations, experience requirements, supervising or master licenses) comes from each city's or county's own ordinance.

Chicago. The Department of Buildings licenses Supervising Electricians (individuals) and Electrical Contractors (businesses); the supervising electrician is Chicago's equivalent of a master electrician. Eligibility for the supervising electrician exam is age 21 and at least 2 years of experience installing, altering, repairing and maintaining electrical wiring under a supervising electrician or equivalent, verified by supervisor letters. General and low-voltage exams are administered by Continental Testing Services (2026 fees: $150 per exam, $150 initial license, $150 annual renewal). An electrical contractor license ($150 initial, $150 renewal) is issued to a business, including a sole proprietorship, that is owned by or employs at least one licensed supervising electrician, who must perform or supervise all of the contractor's electrical work and may be the primary supervising electrician for only one contractor. Chicago's pages do not describe any reciprocity or endorsement for out-of-state licenses.

Springfield. The Building and Zoning Department issues an Electrical License to individuals who document 5 years of practical electrical experience with at least 2 years overseeing and directing electrical work and pass the ICC National Standard Master Electrician exam (W16). Applications go before the Springfield Electrical Commission; the fee is $25 and licenses expire December 31. A grandfather clause allows applicants licensed in another Illinois or out-of-state municipality with reciprocal testing to substitute proof of that exam only if the license was originally issued before 10/10/2007 and has not lapsed more than two years; otherwise the ICC exam is required.

Peoria. Electrical licenses are issued to individuals ($150 annual). Holders of Normal or Pekin licenses may register without testing; all others submit an ICC contractor exam certificate from the 2017 code cycle or newer.

Rockford. Registration only ($25 per calendar year, or free with proof of registration or license in another Illinois municipality); no exam.

Naperville and Aurora. Both accept current ICC certifications (Standard Master Electrician for commercial, Standard Residential Electrician for residential) or a license from a listed testing municipality (Naperville lists Chicago, Elgin, Libertyville, Orland Park, Ottawa, Peoria and Woodstock) in lieu of local testing. Naperville no longer renews or issues its own electrical licenses as of December 31, 2022 and registers electrical contractors through its Civic Access portal; Aurora requires a certificate of insurance naming the city.

Elgin. Requires a contractor's license from any Illinois city that gives a written NEC-based examination, or Elgin's own exam administered monthly through CLEC Enterprises.

Unincorporated Cook County. Electrical contractors must register with the Department of Building and Zoning ($150 initial, $75 annual renewal per trade), provide $1,000,000 general liability insurance naming the department, and submit a current supervising electrician's license from an Illinois city, town or village that has an electrical commission administering an examination.

Out-of-state holders. No reciprocity or endorsement path for other states' master licenses was found in any of these jurisdictions. The practical route is to pass the ICC National Standard Master Electrician exam (accepted by Springfield, Peoria, Aurora and Naperville) or a testing city's exam such as Chicago's, then register as an electrical contractor in each municipality where work will be performed.

Moving to IllinoisLeaving Illinois

Common questions

Do I have to take the District of Columbia master electrician exam if I'm licensed in Illinois?
Yes. District of Columbia requires the trade exam on this path.
What does it cost to get a District of Columbia master electrician license from Illinois?
Published fees on this path total $185, not counting exam vendor fees or bonds.
Do my Illinois work hours count in District of Columbia?
Yes. Documented out-of-state experience counts toward District of Columbia's eligibility requirements.
Does it work the other way, from District of Columbia to Illinois?
Not necessarily. Reciprocity is directed. Going from District of Columbia to Illinois, the mechanism is not applicable.

Sources

  1. D.C. Code § 47-2853.08 - Powers of the boards (reciprocity and endorsement) · D.C. Code § 47-2853.08(2) · Council of the District of Columbia · Statute · verified September 15, 2026Each board may determine whether another jurisdiction's licensure standards, or a national certifying organization's certification, are substantially equivalent and authorize licensure by reciprocity or endorsement for an applicant licensed and in good standing in a state whose requirements were substantially equivalent at the time of licensure and which admits District licensees in a like manner.
  2. D.C. Code § 47-2853.12 - License, certification, and registration criteria; waiver · D.C. Code § 47-2853.12(b)-(d) · Council of the District of Columbia · Statute · verified September 15, 2026(b) a board 'shall waive the requirements for passage of an examination or other proof of fitness' for a person licensed in good standing in a state whose standards were at least as high as the District's and which admits District licensees in a like manner, or who holds an acceptable national certification. (c)(4) an applicant for licensure as a journeyman refrigeration and air conditioning mechanic under § 47-2853.202 is exempt from any District-law examination. (d)-(d-1) each board must keep a list of states and national certifying organizations whose standards qualify, and the Board of Industrial Trades must update its list of national certifying organizations annually.
  3. D.C. Code § 47-2853.91 - Scope of practice for electricians · D.C. Code § 47-2853.91 · Council of the District of Columbia · Statute · verified September 15, 2026Defines an electrician as any person who designs, installs, maintains, alters, repairs, removes or inspects electrical wiring, equipment, conductors or systems; excludes elevator and conveyance work covered by the elevator licensing part.
  4. D.C. Code § 47-2853.92 - Electricians: eligibility requirements · D.C. Code § 47-2853.92 · Council of the District of Columbia · Statute · verified September 15, 2026(a) apprentices are registered without examination and work under a licensed master. (b) journeyman electrician and master electrician limited (low voltage) applicants must have completed a class on Title 12C DCMR (the DC Electrical Code) or equivalent within 2 years and have worked as an apprentice at least 8,000 hours over at least 4 years, or hold an electrical engineering degree plus 2 years certified practical experience, or comparable experience/education the Board deems equivalent. (b-1) the Board shall accept, in lieu of examination and the (b) requirements, a certificate from a national certifying organization (including a nationally recognized trade organization or labor union) that the applicant passed its exam, is designated a journeyman electrician, and has not been disciplined. (c) master electrician applicants must meet (b) and have worked as a journeyman electrician for at least 4 years.
  5. DC DLCP - Board of Industrial Trades (fees, renewal dates, board members) · District of Columbia Department of Licensing and Consumer Protection (DLCP) · Agency Page · verified September 15, 2026Fetched through the r.jina.ai text proxy. Fee table for Refrigeration and Air Conditioning Mechanics: application $65; license Mechanic $110 (up to 2 years), Contractor $120; renewal Mechanic $155, Contractor $180; late renewal $50; examination/re-examination 'See §3500.3'; reinstated or inactive Mechanic $155, Contractor $180; duplicate license $30; verification of records $30. Refrigeration and Air Conditioning licenses expire September 30 in even-numbered years. Board members include two Master Refrigeration and Air Conditioning Mechanics.
  6. DC DLCP - Board of Industrial Trades landing page (apply, items needed, examination, reciprocity) · District of Columbia Department of Licensing and Consumer Protection (DLCP) · Agency Page · verified September 15, 2026Fetched through the r.jina.ai text proxy because dlcp.dc.gov returns 403 to direct fetches. Lists the items needed for a Refrigeration/Air-Conditioning application (certificate of completion, 'CFC Certification (Master ONLY)', employment verification letter, passport photo, government ID, card for fees), the online application portal (govservices.dcra.dc.gov/oplanewlicense), PSI exam scheduling (psiexams.com, 855-557-0616), the Refrigeration and Air Conditioning bond form for trade contractors, and a Reciprocity section that names only Maryland and Virginia electricians (and, via a linked bulletin, Maryland plumbers); no refrigeration or air conditioning reciprocity is published.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related