LicensebyState

Indiana to Montana: master electrician license reciprocity

No credit· Start overVerified September 15, 2026· 8 sources

Indiana does not issue a statewide master electrician license, so there is nothing to transfer. Here is Montana's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Licensure by examination for states not determined substantially equivalent

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

A master electrician from any state other than the five marked 'Yes' in the board's Substantial Equivalency Determinations must take the Montana master exam. Out-of-state journeyman-level experience counts: the applicant submits third-party experience verification of 8,000 hours of journeyman-level work in planning, laying out or supervising installations (or EE transcripts sent directly by the school plus 2,000 hours), together with verifications for every license ever held and any discipline records. MCA 37-1-304 lets the board weigh actual experience and credentials against any deficiency in the origin state's standards. After approval the applicant pays PSI $85 for the open-book 2020 NEC master exam (75% to pass); a $50 journeyman-level temporary practice permit is available while waiting to test.

Applicants who fail the master exam with 69% or less are not eligible for a temporary practice permit. No processing timeline is published.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Count toward eligibility

What you must already have

  • You must document at least 8,000 hours of qualifying work experience.Legally obtained journeyman-level experience in planning, laying out or supervising installation and repair of wiring, apparatus or equipment; no more than 50% residential (ARM 24.141.515(2)). Alternative: electrical engineering degree plus 2,000 hours of practical experience
  • Official license verification from every state or jurisdiction in which the applicant holds or has ever held a professional license of any type

What you'll do to get licensed in Montana

  1. 1Application fee. Pay the application fee ($190). Application for license by examination, includes the original license fee (ARM 24.141.405); nonrefundable.
  2. 2Trade exam. Pass the destination's trade exam. Montana Master Electrician examination administered by PSI, open book on the 2020 NEC, at least 80 questions, 75% to pass.
  3. 3Exam fee. Pay the exam fee ($85). PSI examination fee, paid to PSI after board approval; nonrefundable, valid one year.
  4. 4Other. Optional journeyman temporary practice permit for master exam candidates (90 days or until exam results) ($50) (if applicable).

Published fees on this path total $275, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee · $85

How Montana licenses master electricians

Montana master electrician · “Master Electrician

Statewide license

Verified September 15, 2026· 5 sources

Issued by Montana State Electrical Board (Department of Labor & Industry, Business Standards Division)

Montana issues a statewide Master Electrician license through the State Electrical Board. Under MCA 37-68-304 an applicant needs either an electrical engineering degree from an accredited college plus 2,000 hours of practical experience, or at least 8,000 hours of legally obtained journeyman-level experience in planning, laying out or supervising electrical installations (no more than 50% residential), and must pass the PSI open-book exam on the 2020 NEC (at least 80 questions) with 75%. The $190 application fee includes the original license; renewal is $140 every two years with 16 CE hours. Out-of-state masters are reviewed for substantial equivalency: the board's published determinations mark only Alabama, Idaho, Nebraska, Utah and Wyoming as 'Yes', and their licensees are licensed by endorsement without the exam; masters from all other states must take the Montana exam. The board does not sign formal master-level reciprocity agreements (ARM 24.141.504(1) limits those to residential and journeyman licenses).

Moving to MontanaLeaving Montana

Why Indiana has nothing to transfer

Indiana master electrician

Licensed by cities and counties

Verified September 15, 2026· 12 sources

Indiana has no statewide master electrician or electrical contractor license and no state electrical board; the Indiana Professional Licensing Agency's list of regulated professions contains no electrical trade. The master-level credential exists only at the local level and under varying names: Indianapolis/Marion County licenses Electrical Contractors whose craft license holder has passed the city's exam, Allen County (Fort Wayne) issues an Electrical Supervisors License that it expressly treats as a master electrician license, Evansville and Bloomington license Master Electricians by local examination, and South Bend and Terre Haute license electrical contractors on proof of a passing ICC National Master Electrician (or Experior/master) exam score. An out-of-state master electrician license carries no state-level recognition in Indiana and none of the major jurisdictions publish a formal reciprocity path for other states' licenses; a master must apply in each city or county where they will pull permits, which in practice means holding an ICC national master exam score or passing the local exam, then meeting that jurisdiction's bond and insurance requirements.

How local licensing works in Indiana

How local licensing works. Indiana regulates plumbers at the state level but has never created a state electrician or electrical contractor license. Each city or county building department decides whether and how to license electrical contractors and master-level electricians, and there is no statewide portability rule. Several jurisdictions accept the ICC National Standard Master Electrician exam as the qualifying test, which makes an ICC score the most portable credential inside the state.

Indianapolis / Marion County. The Department of Business and Neighborhood Services issues an Electrical Contractor license to a business that has at least one electrical craft license holder who has passed the required examination (contact the Trade Board & Licensing Coordinator for the exam); a license holder may be connected to only one partnership, LLC or corporation. The packet requires proof of business registration, a certificate of insurance ($500,000 per occurrence bodily injury and $100,000 property damage, or $500,000 combined) naming the Consolidated City of Indianapolis and Marion County as additional insured, workers' compensation coverage or an Indiana exemption certificate (Ohio-based companies need an Indiana Certificate of Compliance), and a $10,000 license or permit surety bond expiring 12/31/2027. 2026 fees: new license holder $377 (applied for January-June 2026), $283 (July-December 2026) or $189 (2027); new business license $247, $185 or $124; business and license-holder renewals $247 each; more than five authorized agents $63 each. Licenses expire December 31 of odd-numbered years.

Fort Wayne / Allen County. The Building Department's Electrical Supervisors License requires four years and 7,000 hours as a journeyman (or eight years and 14,000 hours of documented OJT plus 30 days as a licensed journeyman) and a passing examination; the holder 'shall be considered a master electrician' and may qualify a business for the Electrical Contractors Business Registration ($90; supervisor license $25). Section H of the rules grants licensing reciprocity subject to the trade's reciprocity guidelines and the minimum qualifications, and allows the Building Commissioner to grant reciprocity at his discretion to applicants who present the necessary credentials.

Evansville. The Building Commission licenses Master Electricians (persons, firms or corporations installing or contracting to install electrical wiring and equipment). Applicants submit three notarized letters on letterhead proving at least four years of experience, are approved by the trade board to test, sit the exam through Ivy Tech and must score 75% or higher on each part, then receive a provisional license on paying the $300 fee and providing insurance and a surety bond; the Licensing and Disciplinary Board gives final approval. Renewal is $225 with a $25 late fee after January 31.

South Bend. The Building Department licenses electrical contractors after review of an application showing at least 21 years of age, four years of experience verified by employer letters (or business tax records), and a passing score of at least 70% on the ICC National Master Electrician exam (F16-N) via Pearson Vue or Prometric or a comparable nationally recognized exam approved by the Board of Examiners; a $5,000 surety bond naming the City of South Bend/St. Joseph County, workers' compensation proof, a $50 application review fee and $125 annual registration are required. South Bend issues reciprocal letters ($70) only to municipalities that accept the ICC master exams and cannot guarantee acceptance elsewhere.

Terre Haute. Commercial and residential electrical contractor licenses are issued to businesses; a full-time employee must have passed the Experior Assessment master electrician exam or equivalent for the commercial license (master, journeyman or residential exam for the residential license), proven by a letter from the testing agency. General contractor registration requirements also apply: a $10,000 bond on the city's form and $500,000/$100,000 insurance naming the city; a non-owner master signs a letter accepting responsibility as designated supervisor.

Bloomington. A city ordinance makes it unlawful to engage in electrical contracting without a city license and creates a Board for the Examination and Registration of Electricians that examines and licenses master electricians; current fees were not confirmed from the archived ordinance.

Out-of-state holders. No jurisdiction reviewed publishes reciprocity for another state's master or contractor license. Allen County has a discretionary reciprocity clause; South Bend and Terre Haute accept ICC/Experior national exam scores regardless of where they were earned; Indianapolis and Evansville require their own examinations. Expect to license separately in each jurisdiction and to meet each one's bond and insurance rules.

Moving to IndianaLeaving Indiana

Common questions

Do I have to take the Montana master electrician exam if I'm licensed in Indiana?
Yes. Montana requires the trade exam on this path.
What does it cost to get a Montana master electrician license from Indiana?
Published fees on this path total $275, not counting exam vendor fees or bonds.
Do my Indiana work hours count in Montana?
Yes. Documented out-of-state experience counts toward Montana's eligibility requirements.
Does it work the other way, from Montana to Indiana?
Not necessarily. Reciprocity is directed. Going from Montana to Indiana, the mechanism is not applicable.

Sources

  1. Montana State Electrical Board - Exam Information · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 15, 2026PSI is the exam vendor; exams are based on the 2020 NEC as of June 10, 2022; only board-approved applicants may register and may sit within about a week of the admission letter; PSI test centers nationwide.
  2. Montana State Electrical Board / PSI Examination Information Sheet (3/27/2025) · Montana Department of Labor & Industry / PSI Services · Other · verified September 15, 2026PSI examination fees: Master Electrician $85, Journeyman Electrician $75, Residential Electrician $75; fees nonrefundable and valid one year; Montana test sites in Billings, Helena, Missoula, Great Falls and other locations.
  3. Montana State Electrical Board Laws and Rules Booklet (MCA Title 37 Chapter 68 and ARM Title 24 Chapter 141) · ARM 24.141.405, 24.141.502, 24.141.503, 24.141.504, 24.141.515 · Montana Department of Labor & Industry, Business Standards Division · Admin Rule · verified September 15, 202624.141.405 fee schedule: application for license by examination $190 (includes original license), application by endorsement or reciprocity $190 (includes original license), temporary permit $50, renewal (two years) master $140 / journeyman $140, exam fees set by the testing agency; fees nonrefundable. 24.141.503: passing grade 70% for residential and journeyman exams, 75% for master; exams open book. 24.141.504: the board may enter reciprocity agreements case by case for residential or journeyman licenses with states whose requirements are substantially equivalent or greater; may issue a license by endorsement to an applicant who files a completed application with fees and holds a current, valid license in good standing in the category applied for; licenses issued by a city, county or municipality are not considered. 24.141.502: temporary practice permit valid 90 days or until exam results. 24.141.515: no more than 50% of experience may be residential.
  4. Montana State Electrical Board - Master Electrician Licensing Requirements, Application Checklist and Application (Rev. 07/22/2024) · MCA 37-68-304; ARM 24.141.502, 24.141.515(2) · Montana Department of Labor & Industry, Business Standards Division · Form · verified September 15, 2026Same SE structure as the journeyman checklist: an active, unrestricted, good-standing master license from a state that requires an electrical exam and either an EE degree plus 2,000 hours or 8,000 hours of journeyman-level experience is licensed without the Montana exam; otherwise the exam is required. By examination: EE degree plus 2,000 hours, or 8,000 hours of journeyman-level experience with not more than 50% residential. Fees $190 application (includes license) and optional $50 journeyman temporary practice permit; applicants failing the master exam with 69% or less are ineligible for a permit.
  5. Montana State Electrical Board - Master Electrician license information · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 15, 2026Links the Master Electrician application, checklist, online application and the Montana Substantial Equivalency Determinations document; exams on the 2020 NEC; 16 CE hours per renewal cycle; fees nonrefundable.
  6. MCA 37-1-304 - Licensure by endorsement -- reciprocity · MCA 37-1-304 · Montana Legislature · Statute · verified September 15, 2026An applicant for licensure by endorsement must have an active license in good standing from a jurisdiction whose qualifications, measured at the time of application, are substantially equivalent to Montana's; where they are not, the board may evaluate whether the applicant's actual work experience and credentials cure the deficiency; reciprocity agreements may not license applicants who have not met substantially equivalent standards.
  7. MCA 37-68-304 - Master electricians -- application -- qualifications -- contents of examination -- fees · MCA 37-68-304 · Montana Legislature · Statute · verified September 15, 2026Master applicants furnish written evidence of an electrical engineering degree plus 2,000 hours of practical experience, or at least 8,000 hours of legally obtained journeyman-level experience in planning, laying out or supervising installation and repair of wiring; must pass a board-prescribed exam of at least 80 questions on the NEC and Montana rules.
  8. Montana Substantial Equivalency Determinations - State Electrical Board tables (Residential, Journeyman and Master Electrician) · MCA 37-1-304 · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 15, 2026State-by-state Yes/No tables linked from the board's license pages. Journeyman Electrician 'Yes': Alabama, Alaska, Arkansas, Colorado, Connecticut, Hawaii, Idaho, Iowa, New Hampshire, North Dakota, Oklahoma, Oregon, Rhode Island, South Dakota, Utah, Vermont, Virginia, Washington, Wisconsin, Wyoming (all other states No, including Texas, Minnesota, Nebraska, New Mexico and Maine). Master Electrician 'Yes': Alabama, Idaho, Nebraska, Utah, Wyoming. The document carries no publication date.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related