LicensebyState

Kansas to Washington: master electrician license reciprocity

No credit· Start overVerified September 14, 2026· 6 sources

Kansas does not issue a statewide master electrician license, so there is nothing to transfer. Here is Washington's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

No out-of-state credit toward the master certificate

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

An out-of-state master or journeyman license gives no advantage toward the Washington Master Electrician (01) certificate. RCW 19.28.191(1)(a) requires four years holding a valid journey level certificate, L&I's master electrician page requires four years certified as a general journey level electrician with L&I, and WAC 296-46B-945 states that no credit may be applied from out-of-state toward qualifying for the master examination. The applicant must first obtain the Washington journey level (01) certificate (by exam, or by reciprocity from Oregon), hold it for four years, and then apply for and pass the master exam, which is scheduled with PSI after L&I approval.

Fees listed are what the applicant pays once eligible after four years as a Washington journey level electrician. The $106.70 first-time master exam fee applies when the department administers the exam; PSI-administered exams are paid to PSI at PSI's rate.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Do not count

What you must already have

  • You must have held your Kansas license for at least 4 years.

What you'll do to get licensed in Washington

  1. 1Application fee. Pay the application fee ($204.60). Master electrician exam application fee (includes original certificate and application processing).
  2. 2Trade exam. Pass the destination's trade exam. Washington Master Electrician (01) exam, open book, minimum score 70 percent; scheduled with PSI after L&I approval.
  3. 3Exam fee. Pay the exam fee ($106.70). Master electrician first-time examination fee when administered by the department (retest $125.00); PSI-administered exams are paid to PSI.

Published fees on this path total $311.30, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee · $106.70

How Washington licenses master electricians

Washington master electrician · “Master Electrician (01)

Statewide license

Verified September 14, 2026· 4 sources

Issued by Washington State Department of Labor & Industries, Electrical Program

Washington issues a statewide Master Electrician (01) certificate through the Department of Labor & Industries. To sit the master exam an applicant must have held a valid journey level electrician certificate for four years, and L&I applies this as four years certified as a general journey level electrician with L&I; WAC 296-46B-945 states that no out-of-state credit may be applied toward qualifying for the master exam. Master certificates cannot be obtained through reciprocity, and Washington has no master-level agreement with any state. An out-of-state master electrician therefore first obtains the Washington journey level (01) certificate, holds it for four years, and then takes the master exam. Certificates renew every three years with 24 hours of continuing education.

Moving to WashingtonLeaving Washington

Why Kansas has nothing to transfer

Kansas master electrician

Licensed by cities and counties

Verified September 15, 2026· 10 sources

Kansas does not issue a master electrician license; the master credential exists only at the county and city level under the framework in K.S.A. 12-1525 to 12-1527. State law requires a master certificate of competency to rest on a valid journeyman certificate held for at least two years plus a passing score of 75% on an ICC, IAPMO or Prometric standard master exam, and makes that certificate valid proof of competency in every Kansas jurisdiction that licenses electricians. Sedgwick County/Wichita (MABCD) issues master electrician certificates ($35) to certified journeymen with two more years of field experience who pass ICC 554/KGD/F16/G16/T16; Kansas City, Kansas licenses master electricians after four years of experience including two years of commercial or industrial work; Lawrence certifies masters with four years of field experience or two years as a journeyman ($20); and Johnson County uses the ICC Standard Master Electrician exam (554/KGD) to qualify the individual behind a Class DE electrical contractor license ($325 for a new license). None of these jurisdictions has a reciprocity agreement with another state - MABCD states it does not reciprocate with other jurisdictions - so an out-of-state master's advantage is limited to submitting an already-passed ICC master exam score (Johnson County and MABCD accept the ICC national master exams) and documented experience in place of retesting.

How local licensing works in Kansas

How local licensing works. Kansas has no state master electrician license. K.S.A. 12-1526(f) requires applicants for a master certificate to have held a valid journeyman certificate for at least two years, and 12-1525 designates the ICC, IAPMO and Prometric master exams (75% minimum). A master certificate of competency earned on a standard exam is accepted for licensure in any other Kansas county or city without re-examination; a license based on a local alternative exam is valid only in that jurisdiction unless a reciprocal agreement exists (12-1527).

Sedgwick County and Wichita (MABCD). Master electrician certificate: current electrical journeyman certificate plus two years of field experience as a certified journeyman, and a 75% score on ICC 554, KGD, F16, G16 or T16 Master Electrician. New certificate $35, two-year term, renewal $35 with six trade and six general CEUs. An electrical contractor license additionally needs a qualified person holding the master certificate, $300,000 general liability insurance naming MABCD, and 12 hours of CE per renewal; trade contractor licenses expire December 31 of odd years. MABCD states it does not reciprocate with other jurisdictions or with state testing.

Johnson County. The county licenses electrical contractors (Class DE, electrical services only) rather than individual masters. The company's Qualifying Individual must show a passing score on the ICC Standard Master Electrician exam (554 or KGD, Pearson VUE); the county accepts equivalent ICC, Prometric, ETS-subsidiary and IAPMO exams and may recognize ICC National exams with a verified score of 75% or higher. Fees: $100 application plus $225 per license type ($325 for one new license), $225 renewal, $75 late fee; eight hours of CE per classification per year for the Qualifying Individual.

Kansas City, Kansas (Unified Government). Code sec. 8-158: no one may work as a master electrician without a Unified Government master electrician's license. Applicants must be 21 and document one year of experience planning, laying out and supervising electrical installations plus three additional years under a licensed electrical contractor or master electrician, at least two of them in commercial or industrial work; an approved post-high-school electrical course earns up to two years' credit. Testing is through Prometric via the Building Inspection division; fees and reciprocity are not published.

Lawrence. Master electrician certification requires four years of practical field experience or two years as a journeyman, verified by notarized employer statements, and a 75% score on the K.S.A. standard exam ($50 exam application); license $20, renewal $10, six hours of CE per year. Certificates of competency from other Kansas jurisdictions are accepted.

Out-of-state masters. No interstate reciprocity is published anywhere in Kansas. A master who already passed an ICC master exam elsewhere should present the score (Sedgwick County lists the national ICC 554/F16/G16/T16 exams; Johnson County will consider ICC National scores of 75%+) with experience documentation; otherwise the ICC or Prometric master exam must be taken through a sponsoring Kansas jurisdiction, after which the certificate is portable statewide.

Moving to KansasLeaving Kansas

Common questions

Do I have to take the Washington master electrician exam if I'm licensed in Kansas?
Yes. Washington requires the trade exam on this path.
How long do I need to have held my Kansas license?
At least 4 years before applying.
What does it cost to get a Washington master electrician license from Kansas?
Published fees on this path total $311.30, not counting exam vendor fees or bonds.
Do my Kansas work hours count in Washington?
No. Washington does not credit out-of-state hours on this path.
Does it work the other way, from Washington to Kansas?
Not necessarily. Reciprocity is directed. Going from Washington to Kansas, the mechanism is not applicable.

Sources

  1. L&I - Master Electrician Certificate · Washington State Department of Labor & Industries · Agency Page · verified September 14, 2026Requires at least 4 years certified as a general journey level electrician with L&I (2 years for specialties); master exam taken through PSI; renewal every three years with 24 CE hours.
  2. Application for a Reciprocal (01) General Journey Level Electrician Certificate (F500-148-000) · Washington State Department of Labor & Industries · Form · verified September 14, 2026States that Washington is party to a reciprocal agreement with Oregon and no other states, that a license not obtained through Oregon examination cannot be reciprocated, and that Washington master certificates cannot be obtained through reciprocity. PDF text was read through the search index; the file itself did not extract in this session.
  3. RCW 19.28.191 - Application for certificate of competency - Qualifications - Examination · RCW 19.28.191 · Washington State Legislature · Statute · verified September 14, 2026(1)(a): to take the master journey level exam the applicant must have possessed a valid journey level electrician certificate of competency for four years. (1)(c): journey level exam eligibility via 8,000-hour apprenticeship, an out-of-state journey level certificate obtained through examination in a jurisdiction requiring at least 8,000 supervised hours, 16,000 hours of out-of-state experience, or 8,000 hours in armed forces construction battalions.
  4. WAC 296-46B-909 - Electrical/telecommunications fees · WAC 296-46B-909 · Washington State Legislature · Admin Rule · verified September 14, 2026Fee table filed 5/5/26, effective 7/1/26. Journey level, specialty, or reciprocal electrician application (includes original certificate and processing) $114.60; journey level exam fee when administered by the department $80.30; master electrician exam application $204.60; master first-time exam fee $106.70, retest $125.00.
  5. WAC 296-46B-945 - Qualifying for master, journey level, specialty electrician examinations · WAC 296-46B-945 · Washington State Legislature · Admin Rule · verified September 14, 2026Journey level exam pathways include an out-of-state journey level certificate obtained by examination in a jurisdiction requiring 8,000 supervised hours (4,000 in new commercial/industrial), or 16,000 hours of out-of-state experience; documentation by notarized letters from licensed contractors, apprenticeship directors or employers. States: 'No credit may be applied from out-of-state toward qualifying for a master electrician certificate of competency examination.'
  6. WAC 296-46B-960 - Administrator and electrician certificate of competency examinations · WAC 296-46B-960 · Washington State Legislature · Admin Rule · verified September 14, 2026Open-book exam; minimum passing score 70 percent on any exam or section; two-week wait after a failure, three-month wait after three failures in a year; exam must be completed within one year of approval.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related