LicensebyState

Mississippi to Montana: master electrician license reciprocity

No credit· Start overVerified September 15, 2026· 8 sources

Mississippi does not issue a statewide master electrician license, so there is nothing to transfer. Here is Montana's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Licensure by examination for states not determined substantially equivalent

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

A master electrician from any state other than the five marked 'Yes' in the board's Substantial Equivalency Determinations must take the Montana master exam. Out-of-state journeyman-level experience counts: the applicant submits third-party experience verification of 8,000 hours of journeyman-level work in planning, laying out or supervising installations (or EE transcripts sent directly by the school plus 2,000 hours), together with verifications for every license ever held and any discipline records. MCA 37-1-304 requires the board to weigh actual qualifications and work experience against any deficiency in the origin state's standards. After approval the applicant pays PSI $85 for the open-book 2020 NEC master exam (75% to pass); a $50 journeyman-level temporary practice permit is available while waiting to test.

Applicants who fail the master exam with 69% or less are not eligible for a temporary practice permit. No processing timeline is published.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Count toward eligibility

What you must already have

  • You must document at least 8,000 hours of qualifying work experience.Legally obtained journeyman-level experience in planning, laying out or supervising installation and repair of wiring, apparatus or equipment; no more than 50% residential (ARM 24.141.515(2)). Alternative: electrical engineering degree plus 2,000 hours of practical experience
  • Official license verification from every state or jurisdiction in which the applicant holds or has ever held a professional license of any type

What you'll do to get licensed in Montana

  1. 1Application fee. Pay the application fee ($190). Application for license by examination, includes the original license fee (ARM 24.141.405); nonrefundable.
  2. 2Trade exam. Pass the destination's trade exam. Montana Master Electrician examination administered by PSI, open book on the 2020 NEC, at least 80 questions, 75% to pass.
  3. 3Exam fee. Pay the exam fee ($85). PSI examination fee, paid to PSI after board approval; nonrefundable, valid one year.
  4. 4Other. Optional journeyman temporary practice permit for master exam candidates (90 days or until exam results) ($50) (if applicable).

Published fees on this path total $275, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee · $85

How Montana licenses master electricians

Montana master electrician · “Master Electrician”

Statewide license

Verified September 15, 2026· 5 sources

Issued by Montana State Electrical Board (Department of Labor & Industry, Business Standards Division)

Montana issues a statewide Master Electrician license through the State Electrical Board. Under MCA 37-68-304 an applicant needs either an electrical engineering degree from an accredited college plus 2,000 hours of practical experience, or at least 8,000 hours of legally obtained journeyman-level experience in planning, laying out or supervising electrical installations (no more than 50% residential), and must pass the PSI open-book exam on the 2020 NEC (at least 80 questions) with 75%. The $190 application fee includes the original license; renewal is $140 every two years with 16 CE hours. Out-of-state masters are reviewed for substantial equivalency: the board's published determinations mark only Alabama, Idaho, Nebraska, Utah and Wyoming as 'Yes', and their licensees are licensed by endorsement without the exam; masters from all other states must take the Montana exam. The board does not sign formal master-level reciprocity agreements (ARM 24.141.504(1) limits those to residential and journeyman licenses).

Moving to MontanaLeaving Montana

Compare: getting a Montana license from scratch

Why Mississippi has nothing to transfer

Mississippi master electrician

Licensed by cities and counties

Verified September 15, 2026· 10 sources

Mississippi does not issue a personal master electrician license. The state-level electrical credential is the Mississippi State Board of Contractors (MSBOC) contractor license in the Electrical classification (commercial, required on projects over $50,000; application $400, renewal $400) or the Residential Electrical classification (application $50), issued to the business through a Certificate of Responsibility with a named qualifying party who passes the open-book PSI electrical trade exam (or the NASCLA Master Electrical exam) and the mandatory Mississippi Law and Business Management exam. Because it is a business license, a master electrician who only wants to work for an employer has nothing to transfer to at the state level; the master-level personal credential exists only in cities such as Southaven (Master Electrician, $100, which itself requires an active MSBOC license, $10,000 bond and liability insurance) and Hattiesburg (Master Electrical Contractor License, five years of experience and the SBCCI exam). MSBOC does waive its electrical trade exam, for $50 per exam, for qualifying parties licensed at least one year by the Alabama Electrical Board, the North Carolina Board of Examiners of Electrical Contractors, the Ohio Construction Industry Licensing Board, the South Carolina Contractors Licensing Board or Residential Builders Commission, and the Tennessee Board for Licensing Contractors, and its Universal Recognition form (Miss. Code 73-50-2) waives the trade exam for new Mississippi residents licensed elsewhere for a year; the Law and Business exam is never waived.

How local licensing works in Mississippi

State contractor license (business level). MSBOC's Electrical major classification covers installation, repair, alteration and design of electrical wiring, fixtures, raceways and conduit and includes nine specialties; the qualifying party passes the PSI electrical trade exam or the NASCLA-accredited Master Electrical exam, and every applicant passes the Mississippi Law and Business Management exam. Fees (schedule effective January 1, 2016): commercial application $400, renewal $400, additional classification $100, reciprocity/verification of license $25, request for waiver of exam $50; residential application $50, renewal $100. Reciprocity (revised 07/2025) waives the trade exam only, $50 per exam waived, for a qualifying party who has held the reciprocal license one year with no discipline in the agreement's look-back period: Alabama Electrical Board (Alabama exam taken), North Carolina Electrical Contractors Board (electrical and alarm systems; one year), Ohio CILB (electrical, HVAC, plumbing, refrigeration; no discipline in the last year), South Carolina Contractors Licensing Board (building and electrical; exam by PSI, Experior, Block or NAI), South Carolina Residential Builders Commission (residential electrical; no discipline in 3 years) and Tennessee (all exams; no discipline in the last year). Arkansas and Louisiana agreements exclude electrical work. Form UROL additionally waives the trade exam for an individual who has established Mississippi residency and held a similar license in any other state for at least one year (or worked three years in a state without construction licensing).

Southaven. Master Electrician license $100: application, photo ID of the license qualifier, certificate of liability insurance, a $10,000 general surety bond in favor of the city, an active MSBOC contractor's license certificate and the company EIN. An out-of-state applicant without an MSBOC license must provide a letter of good standing from a municipality where their license is active and may not take residential projects or commercial projects over $50,000; the city applies MSBOC's reciprocity standards.

Hattiesburg. The Electrical Examining Review Board issues the Master Electrical Contractor License: age 21, five years of proven experience attested by affidavits from licensed master electrical contractors (an electrical engineering degree substitutes for three years, a trade-school certificate for two), three character letters, and the SBCCI examination with a 70% minimum, given four times a year. Insurance and bond requirements of the city code and MSBOC regulations also apply. The ordinance allows a license for a person who holds a valid license from another city meeting the requirements of House Bill 359; no interstate reciprocity is described.

Jackson. Trade-license requirements are not published on the city's website.

Out-of-state masters. The realistic route is the MSBOC license: use the reciprocity verification form (AL, NC, OH, SC, TN electrical boards) or Form UROL to waive the trade exam, pass the Law and Business exam, then obtain any city master license that the local ordinance requires, which in Southaven is granted on the strength of the MSBOC license plus bond and insurance.

Moving to MississippiLeaving Mississippi

Common questions

Do I have to take the Montana master electrician exam if I'm licensed in Mississippi?
Yes. Montana requires the trade exam on this path.
What does it cost to get a Montana master electrician license from Mississippi?
Published fees on this path total $275, not counting exam vendor fees or bonds.
Do my Mississippi work hours count in Montana?
Yes. Documented out-of-state experience counts toward Montana's eligibility requirements.
Does it work the other way, from Montana to Mississippi?
Not necessarily. Reciprocity is directed. Going from Montana to Mississippi, the mechanism is not applicable.

Sources

  1. Montana State Electrical Board - Exam Information · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 23, 2026
  2. Montana State Electrical Board / PSI Examination Information Sheet (3/27/2025) · Montana Department of Labor & Industry / PSI Services · Other · verified September 23, 2026
  3. Montana State Electrical Board Laws and Rules Booklet (MCA Title 37 Chapter 68 and ARM Title 24 Chapter 141) · ARM 24.141.405, 24.141.502, 24.141.503, 24.141.504, 24.141.515 · Montana Department of Labor & Industry, Business Standards Division · Admin Rule · verified September 23, 2026
  4. Montana State Electrical Board - Master Electrician Licensing Requirements, Application Checklist and Application (Rev. 07/22/2024) · MCA 37-68-304; ARM 24.141.502, 24.141.515(2) · Montana Department of Labor & Industry, Business Standards Division · Form · verified September 23, 2026
  5. Montana State Electrical Board - Master Electrician license information · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 23, 2026
  6. Mont. Code Ann. sec. 37-1-304 - Licensure by endorsement; reciprocity · Mont. Code Ann. sec. 37-1-304 · Montana Legislative Services Division · Statute · verified September 17, 2026
  7. MCA 37-68-304 - Master electricians -- application -- qualifications -- contents of examination -- fees · MCA 37-68-304 · Montana Legislature · Statute · verified September 23, 2026
  8. Montana Substantial Equivalency Determinations (all boards and programs) · MCA 37-1-304 · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 17, 2026

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related