LicensebyState

Mississippi to Texas: master electrician license reciprocity

No credit· Start overVerified September 14, 2026· 8 sources

Mississippi does not issue a statewide master electrician license, so there is nothing to transfer. Here is Texas's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Out-of-state master without a reciprocity agreement

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

TDLR publishes no electrician-specific endorsement process for master electricians from states outside its reciprocity agreements. Occupations Code §51.4041 lets TDLR waive prerequisites case by case for an applicant holding a similar license from a state with substantially equivalent requirements, and TDLR calls that review its primary method for out-of-state licensees, but the electrician program pages do not describe how it is applied to masters. Otherwise the applicant files the standard Master Electrician application, must have held a journeyman license for at least two years, documents 12,000 hours of on-the-job training, and must pass the Texas master exam. Texas has no separate law or business exam for individual electricians.

TDLR's application page links the two-year journeyman requirement to the Texas Journeyman Electrician license and requires training under a Master Electrician licensed in Texas; whether an out-of-state journeyman license or out-of-state supervised hours are credited was not confirmed from an official page. Journeyman Industrial Electrician experience may not be used to qualify.

At a glance

Trade exam
Required
Law / code exam
Not required

What you must already have

  • You must document at least 12,000 hours of qualifying work experience.On-the-job training under the supervision of a master electrician (Tex. Occ. Code §1305.153).
  • Held a journeyman electrician license for at least two years

What you'll do to get licensed in Texas

  1. 1Application fee. Pay the application fee ($45). Master Electrician license application fee (non-refundable), 16 TAC §73.80.
  2. 2Trade exam. Pass the destination's trade exam. Texas Master Electrician exam administered by PSI (NEC knowledge and calculations portions, open book, 2023 NEC).
  3. 3Exam fee. Pay the exam fee ($78). PSI examination fee for both portions; retake $78.

Published fees on this path total $123, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee · $78

How Texas licenses master electricians

Texas master electrician · “Master Electrician

Statewide license

Verified September 14, 2026· 4 sources

Issued by Texas Department of Licensing and Regulation (TDLR)

Texas issues a statewide Master Electrician license through TDLR. A new applicant must have held a journeyman electrician license for at least two years, have 12,000 hours of on-the-job training under a master electrician (TDLR's application page specifies a Texas-licensed master), and pass the PSI-administered master exam. TDLR has master-level reciprocity agreements with seven states, four of them added between December 2025 and June 2026; qualifying licensees are licensed without the Texas exam. Licenses are valid for one year and renewed annually.

Moving to TexasLeaving Texas

Why Mississippi has nothing to transfer

Mississippi master electrician

Licensed by cities and counties

Verified September 15, 2026· 10 sources

Mississippi does not issue a personal master electrician license. The state-level electrical credential is the Mississippi State Board of Contractors (MSBOC) contractor license in the Electrical classification (commercial, required on projects over $50,000; application $400, renewal $400) or the Residential Electrical classification (application $50), issued to the business through a Certificate of Responsibility with a named qualifying party who passes the open-book PSI electrical trade exam (or the NASCLA Master Electrical exam) and the mandatory Mississippi Law and Business Management exam. Because it is a business license, a master electrician who only wants to work for an employer has nothing to transfer to at the state level; the master-level personal credential exists only in cities such as Southaven (Master Electrician, $100, which itself requires an active MSBOC license, $10,000 bond and liability insurance) and Hattiesburg (Master Electrical Contractor License, five years of experience and the SBCCI exam). MSBOC does waive its electrical trade exam, for $50 per exam, for qualifying parties licensed at least one year by the Alabama Electrical Board, the North Carolina Board of Examiners of Electrical Contractors, the Ohio Construction Industry Licensing Board, the South Carolina Contractors Licensing Board or Residential Builders Commission, and the Tennessee Board for Licensing Contractors, and its Universal Recognition form (Miss. Code 73-50-2) waives the trade exam for new Mississippi residents licensed elsewhere for a year; the Law and Business exam is never waived.

How local licensing works in Mississippi

State contractor license (business level). MSBOC's Electrical major classification covers installation, repair, alteration and design of electrical wiring, fixtures, raceways and conduit and includes nine specialties; the qualifying party passes the PSI electrical trade exam or the NASCLA-accredited Master Electrical exam, and every applicant passes the Mississippi Law and Business Management exam. Fees (schedule effective January 1, 2016): commercial application $400, renewal $400, additional classification $100, reciprocity/verification of license $25, request for waiver of exam $50; residential application $50, renewal $100. Reciprocity (revised 07/2025) waives the trade exam only, $50 per exam waived, for a qualifying party who has held the reciprocal license one year with no discipline in the agreement's look-back period: Alabama Electrical Board (Alabama exam taken), North Carolina Electrical Contractors Board (electrical and alarm systems; one year), Ohio CILB (electrical, HVAC, plumbing, refrigeration; no discipline in the last year), South Carolina Contractors Licensing Board (building and electrical; exam by PSI, Experior, Block or NAI), South Carolina Residential Builders Commission (residential electrical; no discipline in 3 years) and Tennessee (all exams; no discipline in the last year). Arkansas and Louisiana agreements exclude electrical work. Form UROL additionally waives the trade exam for an individual who has established Mississippi residency and held a similar license in any other state for at least one year (or worked three years in a state without construction licensing).

Southaven. Master Electrician license $100: application, photo ID of the license qualifier, certificate of liability insurance, a $10,000 general surety bond in favor of the city, an active MSBOC contractor's license certificate and the company EIN. An out-of-state applicant without an MSBOC license must provide a letter of good standing from a municipality where their license is active and may not take residential projects or commercial projects over $50,000; the city applies MSBOC's reciprocity standards.

Hattiesburg. The Electrical Examining Review Board issues the Master Electrical Contractor License: age 21, five years of proven experience attested by affidavits from licensed master electrical contractors (an electrical engineering degree substitutes for three years, a trade-school certificate for two), three character letters, and the SBCCI examination with a 70% minimum, given four times a year. Insurance and bond requirements of the city code and MSBOC regulations also apply. The ordinance allows a license for a person who holds a valid license from another city meeting the requirements of House Bill 359; no interstate reciprocity is described.

Jackson. Trade-license requirements could not be verified on the city's website.

Out-of-state masters. The realistic route is the MSBOC license: use the reciprocity verification form (AL, NC, OH, SC, TN electrical boards) or Form UROL to waive the trade exam, pass the Law and Business exam, then obtain any city master license that the local ordinance requires, which in Southaven is granted on the strength of the MSBOC license plus bond and insurance.

Moving to MississippiLeaving Mississippi

Common questions

Do I have to take the Texas master electrician exam if I'm licensed in Mississippi?
Yes. Texas requires the trade exam on this path.
What does it cost to get a Texas master electrician license from Mississippi?
Published fees on this path total $123, not counting exam vendor fees or bonds.
Does it work the other way, from Texas to Mississippi?
Not necessarily. Reciprocity is directed. Going from Texas to Mississippi, the mechanism is not applicable.

Sources

  1. Texas Occupations Code Chapter 1305 - Electricians · Tex. Occ. Code §§1305.153, 1305.155, 1305.164 · Texas Legislature · Statute · verified September 14, 2026§1305.155 journeyman: 8,000 hours OJT under a master electrician and pass the exam. §1305.153 master: 12,000 hours OJT, journeyman license held at least two years, pass the exam. §1305.164: the executive director may license an applicant licensed in a state with which Texas has an agreement to recognize licenses.
  2. Texas Occupations Code §51.4041 - Alternative Qualifications for License · Tex. Occ. Code §51.4041 · Texas Legislature · Statute · verified September 14, 2026Allows TDLR to waive license prerequisites for an applicant holding a similar license from a jurisdiction with substantially equivalent requirements or a reciprocity agreement, and to enter reciprocity agreements with the Governor's approval.
  3. Electricians Administrative Rules, 16 TAC Chapter 73 · 16 TAC §§73.20, 73.21, 73.24, 73.80 · Texas Commission of Licensing and Regulation · Admin Rule · verified September 14, 2026§73.24(a): an applicant licensed in a state with a reciprocity agreement may obtain the equivalent Texas license without examination if all other requirements of Occupations Code ch. 1305 are met. §73.80: journeyman application $30, master application $45.
  4. TDLR - Apply for a New Master Electrician License · Texas Department of Licensing and Regulation · Agency Page · verified September 14, 2026
  5. TDLR Electrician Candidate Information Bulletin (PSI) · Texas Department of Licensing and Regulation / PSI Services · Other · verified September 14, 2026Exam fee table: Journeyman Electrician $78; Master Electrician (both portions) $78; retakes $78.
  6. TDLR - Electrician Exam Information · Texas Department of Licensing and Regulation · Agency Page · verified September 14, 2026
  7. TDLR - Transfer Your Out-of-State Electrician License to Texas · Texas Department of Licensing and Regulation · Agency Page · verified September 14, 2026Lists the current journeyman and master reciprocity partner states, the eligibility bullets, fees, and the reciprocity application forms.
  8. TDLR - Removing Barriers for Out-of-State Licensees at a Glance (AAG FORM-019, Jan. 2025) · Texas Department of Licensing and Regulation · Other · verified September 14, 2026Agency-wide summary: substantial-equivalence review under Occupations Code 51.4041(b)(1) is described as the primary case-by-case method for out-of-state licensees; reciprocity agreements require the Governor's approval. Its electrician partner lists are as of January 2025.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related