Nevada does not issue a statewide master electrician license, so there is nothing to transfer. Here is District of Columbia's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Out-of-state master from a state other than Maryland or Virginia

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

The Board of Industrial Trades publishes reciprocity only for Maryland and Virginia. A master electrician from any other state applies through the DLCP online portal as a new applicant with employment verification letters, a letter of good standing and a copy of the state-issued license, pays the $65 application fee, must document the journeyman-level prerequisites plus at least 4 years of work as a journeyman electrician, and schedules the master exam with PSI. D.C. Code § 47-2853.12(b) directs boards to waive the exam for anyone licensed in good standing in a state with equivalent standards that reciprocates with the District, and § 47-2853.08 lets the Board find another state's standards substantially equivalent and license by reciprocity or endorsement, so an applicant may ask the Board to apply those provisions case by case; the Board's pages describe no such process beyond Maryland and Virginia. The national-certification substitute in § 47-2853.92(b-1) is written for the journeyman license only. No District-law exam is published for master electricians.

The Board's fee page refers exam fees to '§ 3500.3' without stating an amount; the PSI exam fee for the DC master exam could not be confirmed from an official page. Whether journeyman years worked under an out-of-state license count toward the 4-year journeyman requirement was not confirmed from an official page.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Count toward eligibility

What you must already have

  • You must document at least 8,000 hours of qualifying work experience.Journeyman-level prerequisite: at least 8,000 apprentice hours over at least 4 years, or an electrical engineering degree plus 2 certified years, or equivalent (D.C. Code § 47-2853.92(b)).
  • Worked as a journeyman electrician for at least 4 years (D.C. Code § 47-2853.92(c))
  • Completed a class on Title 12C DCMR (DC Electrical Code) or an equivalent code within the 2 years before applying

What you'll do to get licensed in District of Columbia

  1. 1Application fee. Pay the application fee ($65). Application fee (non-refundable).
  2. 2Trade exam. Pass the destination's trade exam. DC Master Electrician examination administered by PSI (schedule at psiexams.com after Board pre-approval).
  3. 3Exam fee. Pay the exam fee. PSI examination fee, amount set by 17 DCMR § 3500.3 (not stated on the Board page).
  4. 4License fee. Pay the license or certificate fee ($120). Master electrician license fee, 2-year term (renewal $155).

Published fees on this path total $185, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee

How District of Columbia licenses master electricians

District of Columbia master electrician · “Master Electrician

Statewide license

Verified September 15, 2026· 4 sources

Issued by DC Board of Industrial Trades (Department of Licensing and Consumer Protection)

The District of Columbia issues a person-held Master Electrician license through the Board of Industrial Trades in the Department of Licensing and Consumer Protection (DLCP). It is the District's highest individual electrician credential; the Board also issues a Master Electrician Limited (low voltage) specialty license with journeyman-level qualifications, and a separate Electrical Contractor business license that requires an electrical bond. Under D.C. Code § 47-2853.92(c) a master applicant must meet the journeyman requirements (a DC Electrical Code class within 2 years and 8,000 apprentice hours over 4 years or equivalent) and in addition have worked as a journeyman electrician for at least 4 years, then pass the PSI-administered master exam. Fees are a $65 application fee and a $120 license fee for a 2-year term ($155 on renewal). Maryland and Virginia master electricians licensed by examination are licensed by reciprocity without the DC exam under a program the Board opened on February 8, 2021.

Moving to District of ColumbiaLeaving District of Columbia

Why Nevada has nothing to transfer

Nevada master electrician

Licensed by cities and counties

Verified September 15, 2026· 13 sources

Issued by Nevada State Contractors Board (contractor licensing only); master electrician cards issued at county/city level

Nevada does not issue a master electrician license. The state-level electrical credential is a classification C-2 Electrical Contracting license from the Nevada State Contractors Board (NSCB), which is a business license issued to a sole proprietor, partnership, corporation or LLC and qualified by a named individual, not a license held by the electrician personally. A master-level personal card exists only at the local level: Clark County, the City of Las Vegas and the City of Reno recognize a 'Master Electrician' category, obtained by passing the ICC G16 Master Electrician exam at 75% and holding an ESP-issued Nevada Electrical Qualifications Card, and Clark County code allows a master electrician or electrical qualified individual to satisfy the contractor's on-site supervision duty. None of these jurisdictions publish reciprocity for an out-of-state master license. To contract independently, an arriving master electrician must obtain a C-2 license: the qualifying individual needs four years of experience as a journeyman, foreman, supervising employee or contractor within the past 15 years, must pass the PSI-administered Nevada Business and Law exam and the C-2 trade exam, and the business must pay the $300 application fee and $600 biennial license fee, submit a financial statement and background check, and post a bond of $1,000 to $500,000 set by the Board. Under licensure by endorsement (NAC 624.600 and 624.615) the C-2 trade exam and experience certification are waived for a qualified individual who has held an active electrical contractor license with no discipline for the past four years in Arizona (CR-11), California (C-10), Connecticut (E1), Louisiana (9 Electrical Work), North Carolina (Unlimited Electrical) or Tennessee (CE Electrical), while Florida (EC) and West Virginia (A Electrical) licensees get experience credit but must take the Nevada trade exam; the Business and Law exam is never waived.

How local licensing works in Nevada

State level. NRS 624 and NAC 624 create only contractor licenses. NAC 624.200 defines classification C-2 Electrical Contracting (C-2a Electrical Wiring, C-2b Integrated Ceilings, C-2c Fire Detection, C-2d Low Voltage Systems, C-2e Lines to Transmit Electricity, C-2f Residential Wiring, C-2g Photovoltaics). The license belongs to the business; the individual who qualifies it must have four years of journeyman-or-higher experience within 15 years (NRS 624.260(6)) and pass the Business and Law and trade exams unless the trade exam is waived under NAC 624.600 for an endorsing-state exam approved under NAC 624.615. Fees: $300 application, $600 to issue or renew (NAC 624.130), PSI exam fees, bond $1,000-$500,000 (NRS 624.270).

Clark County. Clark County Code §22.02.260 recognizes a Master Electrician (all aspects of electrical work) alongside the journeyman categories; a master or the contractor's qualified individual is responsible for supervision, inspection and code conformance of the contractor's permitted work, and a master found not to meet the NSCB qualified-individual standard is not recognized until re-examined. The exam is the ICC G16 Master Electrician (75% under the ESP program) and the card is issued by ESP with 30 CEU hours per three-year renewal, including an 8-hour NEC update. The code's only equivalency is for certificates from the accepted testing agency or other Nevada political subdivisions within Clark County.

City of Las Vegas and City of Henderson. Las Vegas Administrative Code §306 uses the same master electrician / qualified individual / journeyman supervision rule and the ESP card; Henderson is listed by ESP as requiring the card but its ordinance was not verified.

City of Reno. Reno's published journeyman program covers the ICC G17/G18 exams; the ESP presentation lists Reno as a participating jurisdiction for master cards as well, but Reno's own page does not describe a separate master card.

Out-of-state holders. No local jurisdiction publishes a waiver of the ICC master exam for an out-of-state master license. The practical route is to pass the ICC G16 exam and obtain the ESP card, or, if contracting, to apply for a C-2 license through NSCB, where the endorsement charts above may waive the trade exam.

Moving to NevadaLeaving Nevada

Common questions

Do I have to take the District of Columbia master electrician exam if I'm licensed in Nevada?
Yes. District of Columbia requires the trade exam on this path.
What does it cost to get a District of Columbia master electrician license from Nevada?
Published fees on this path total $185, not counting exam vendor fees or bonds.
Do my Nevada work hours count in District of Columbia?
Yes. Documented out-of-state experience counts toward District of Columbia's eligibility requirements.
Does it work the other way, from District of Columbia to Nevada?
Not necessarily. Reciprocity is directed. Going from District of Columbia to Nevada, the mechanism is not applicable.

Sources

  1. D.C. Code § 47-2853.08 - Powers of the boards (reciprocity and endorsement) · D.C. Code § 47-2853.08(2) · Council of the District of Columbia · Statute · verified September 15, 2026Each board may determine whether another jurisdiction's licensure standards, or a national certifying organization's certification, are substantially equivalent and authorize licensure by reciprocity or endorsement for an applicant licensed and in good standing in a state whose requirements were substantially equivalent at the time of licensure and which admits District licensees in a like manner.
  2. D.C. Code § 47-2853.12 - License, certification, and registration criteria; waiver · D.C. Code § 47-2853.12(b)-(d) · Council of the District of Columbia · Statute · verified September 15, 2026(b) a board 'shall waive the requirements for passage of an examination or other proof of fitness' for a person licensed in good standing in a state whose standards were at least as high as the District's and which admits District licensees in a like manner, or who holds an acceptable national certification. (c)(4) an applicant for licensure as a journeyman refrigeration and air conditioning mechanic under § 47-2853.202 is exempt from any District-law examination. (d)-(d-1) each board must keep a list of states and national certifying organizations whose standards qualify, and the Board of Industrial Trades must update its list of national certifying organizations annually.
  3. D.C. Code § 47-2853.91 - Scope of practice for electricians · D.C. Code § 47-2853.91 · Council of the District of Columbia · Statute · verified September 15, 2026Defines an electrician as any person who designs, installs, maintains, alters, repairs, removes or inspects electrical wiring, equipment, conductors or systems; excludes elevator and conveyance work covered by the elevator licensing part.
  4. D.C. Code § 47-2853.92 - Electricians: eligibility requirements · D.C. Code § 47-2853.92 · Council of the District of Columbia · Statute · verified September 15, 2026(a) apprentices are registered without examination and work under a licensed master. (b) journeyman electrician and master electrician limited (low voltage) applicants must have completed a class on Title 12C DCMR (the DC Electrical Code) or equivalent within 2 years and have worked as an apprentice at least 8,000 hours over at least 4 years, or hold an electrical engineering degree plus 2 years certified practical experience, or comparable experience/education the Board deems equivalent. (b-1) the Board shall accept, in lieu of examination and the (b) requirements, a certificate from a national certifying organization (including a nationally recognized trade organization or labor union) that the applicant passed its exam, is designated a journeyman electrician, and has not been disciplined. (c) master electrician applicants must meet (b) and have worked as a journeyman electrician for at least 4 years.
  5. DC DLCP - Board of Industrial Trades (fees, renewal dates, board members) · District of Columbia Department of Licensing and Consumer Protection (DLCP) · Agency Page · verified September 15, 2026Fetched through the r.jina.ai text proxy. Fee table for Refrigeration and Air Conditioning Mechanics: application $65; license Mechanic $110 (up to 2 years), Contractor $120; renewal Mechanic $155, Contractor $180; late renewal $50; examination/re-examination 'See §3500.3'; reinstated or inactive Mechanic $155, Contractor $180; duplicate license $30; verification of records $30. Refrigeration and Air Conditioning licenses expire September 30 in even-numbered years. Board members include two Master Refrigeration and Air Conditioning Mechanics.
  6. DC DLCP - Board of Industrial Trades landing page (apply, items needed, examination, reciprocity) · District of Columbia Department of Licensing and Consumer Protection (DLCP) · Agency Page · verified September 15, 2026Fetched through the r.jina.ai text proxy because dlcp.dc.gov returns 403 to direct fetches. Lists the items needed for a Refrigeration/Air-Conditioning application (certificate of completion, 'CFC Certification (Master ONLY)', employment verification letter, passport photo, government ID, card for fees), the online application portal (govservices.dcra.dc.gov/oplanewlicense), PSI exam scheduling (psiexams.com, 855-557-0616), the Refrigeration and Air Conditioning bond form for trade contractors, and a Reciprocity section that names only Maryland and Virginia electricians (and, via a linked bulletin, Maryland plumbers); no refrigeration or air conditioning reciprocity is published.