New York does not issue a statewide master electrician license, so there is nothing to transfer. Here is Georgia's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Licensure by examination with credit for out-of-state experience (all other states)

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

A licensee from a state without a Georgia reciprocity agreement applies for licensure by examination in GOALS, the same as a first-time applicant. The applicant must document at least 4 years of qualifying experience (2,000 hours = 1 year) gained under a licensed electrical contractor; the Board's form expressly allows the qualifying licensee to be an out-of-state contractor, with a note on whether that license is equivalent to a Georgia Restricted or Non-Restricted license, so time worked under an out-of-state license is credited. For Class II the experience must cover all eight primary experience areas, including installations in excess of single-phase 400-ampere systems under a Class II (non-restricted) contractor; Class I needs six of the eight areas. The application ($110) also requires three notarized reference forms, at least one from a licensed electrical contractor, a certified background check from local law enforcement, and the citizenship affidavit. Once the Board approves the application, PSI/AMP contacts the candidate to register, pay the exam fee and schedule the exam; a license is issued after passing. Licenses obtained elsewhere by grandfathering, endorsement, conversion or reciprocity give no advantage in Georgia beyond the experience credit.

The Georgia exam is a single PSI examination for the class applied for; the Board's pages do not describe a separate law exam, and the PSI exam fee was not published on the pages opened. The $110 fee comes from the online how-to guide (the retired 2022 paper form listed $40). The GOALS fee schedule page could not be opened, so the license issuance fee after passing was not confirmed. The 30-day timeline reflects the Board's stated 20-business-day processing.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Count toward eligibility
Typical processing
About 30 days

What you must already have

  • You must document at least 8,000 hours of qualifying work experience.4 years at 2,000 hours per year under a licensed electrical contractor (in Georgia or another state); Class II requires all eight primary experience areas and work above single-phase 400 amperes under a Class II contractor

What you'll do to get licensed in Georgia

  1. 1Application fee. Pay the application fee ($110). Electrical Contractor (Restricted or Non-Restricted) licensure-by-examination application fee, paid in GOALS.
  2. 2Trade exam. Pass the destination's trade exam. Georgia Electrical Contractor Class II (Non-Restricted) or Class I (Restricted) examination administered by PSI/AMP after Board approval.
  3. 3Exam fee. Pay the exam fee. PSI examination fee paid directly to PSI at registration (amount not published on the Board's pages).
  4. 4Other. Three notarized Reference Forms returned directly to the Board, at least one from a licensed electrical contractor.
  5. 5Background check. Complete a background check. Certified criminal background check obtained from local law enforcement.
  6. 6Other. Primary Experience Record forms completed by the qualifying licensed electrical contractor(s) covering 4 years.

Published fees on this path total $110, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee

How Georgia licenses master electricians

Georgia master electrician · “Electrical Contractor Class II (Non-Restricted)

Statewide license

Verified September 15, 2026· 5 sources

Issued by Georgia Construction Industry Licensing Board, Division of Electrical Contractors (Secretary of State)

Georgia has no 'master electrician' license; its highest person-held electrical credential is the statewide Electrical Contractor license issued by the Construction Industry Licensing Board's Division of Electrical Contractors to an individual who documents experience and passes the PSI-administered exam. It comes in two classes: Class I (Restricted) covers single-phase installations up to 200 amperes, and Class II (Non-Restricted) is unrestricted, so Class II is the master-level equivalent used here. A new applicant needs at least 4 years (8,000 hours) of primary experience under a licensed electrical contractor covering all eight experience areas, including installations above single-phase 400 amperes under a Class II contractor, plus three notarized references and a certified background check; the exam application fee is $110 through the GOALS portal. Georgia has reciprocity agreements, for Class II only, with Alabama, Louisiana, North Carolina, South Carolina and Tennessee: a contractor who obtained an unrestricted electrical license in one of those states by passing that state's exam is licensed without the Georgia exam. Everyone else applies by examination, with out-of-state experience under a licensed contractor counting toward the 4 years. Licenses renew by June 30 of even-numbered years; applications are generally processed within 20 business days.

Moving to GeorgiaLeaving Georgia

Why New York has nothing to transfer

New York master electrician

Licensed by cities and counties

Verified September 15, 2026· 18 sources

New York issues no statewide master electrician license; the Department of State's Division of Licensing Services licenses no electricians, and master electrician licenses are issued by city and county examining boards under local ordinances. The largest is New York City's Department of Buildings Master Electrician license (with a companion Special Electrician license for in-house work), which requires seven years of experience within the last ten working with tools under a licensed master or special electrician in the United States, at least two of them in New York City, a $585 written and $530 practical exam, a background investigation, and a New York City business with general liability, workers' compensation and disability insurance; the license costs $310 and is renewed yearly for $60. Buffalo requires 11 years (22,000 hours) of experience and a 75 percent ICC G-16 score; Rochester requires four years (6,000 hours of three-phase work) and an ICC-based exam; Westchester County licenses master and special electricians by examination ($500 license) and its license is what Yonkers permits require; Suffolk County licenses master and restricted electricians; Syracuse and Albany run their own boards. None of these jurisdictions publishes a reciprocity or endorsement path for a master license from another state, although Westchester's fee schedule lists a 'Reciprocal Electrician' license category. A master electrician arriving from another state must qualify with each local board where they intend to work, and in New York City must first accumulate two years of supervised experience inside the city.

How local licensing works in New York

How local licensing works. New York has no state electrical board. Licensing authority rests with individual cities and counties, each with its own examining board, ordinance, exam and fee schedule; a license is valid only in the issuing jurisdiction.

New York City. The Department of Buildings issues the Master Electrician license (independent contracting anywhere in the city) and the Special Electrician license (work as an employee in or on specific buildings). Qualifications (NYC Admin. Code 28-430.3; 1 RCNY 104-01): age 18, read and write English, fitness and good moral character, and one of: seven years within the last ten working with tools on wiring and appliances for light, heat and power under the direct and continuing supervision of a licensed master or special electrician in the United States, at least two years of it in NYC; a bachelor's degree in electrical engineering or engineering technology plus three years within five (two in NYC); a New York State DOL-registered apprenticeship plus five years within ten (two in NYC); or electrical-inspection employment credited at 50 percent up to 2.5 years. Candidates pay $585 for the closed-book written exam on the 2025 NYC Electrical Code (70 percent to pass) and $530 for the practical, which must be passed within 24 months of the written result; the background application (experience verification signed by supervisors, Social Security earnings history, physical exam) is filed through DOB NOW within one year. License fee $310, seal $50, annual renewal $60 with continuing education, late renewal $310. The licensee must be an officer, partner or sole proprietor of a business with a NYC location carrying general liability, workers' compensation and disability insurance. The exam can be waived only for city-agency applicants (28-430.6); no out-of-state waiver exists, and the two-years-in-NYC rule means an out-of-state master cannot qualify immediately.

Buffalo. The Electrical Examining Board's Master Electrician License requires 11 years (22,000 hours) of experience in electrical construction within the last 11 years, structured as four years (8,000 hours) as an apprentice plus seven years (14,000 hours) as a journeyman working for a licensed master, documented by notarized employer and master electrician affidavits; a passing (75 percent or higher) ICC G-16 Master Electrician exam taken within one year; a $100 application fee; and general liability and workers' compensation certificates before issuance. The master electrician affidavit asks in which city the supervising master is licensed, so experience under masters licensed elsewhere is accepted as documentation.

Rochester. The Electrical Examining Board issues a Master (three-phase) license requiring four years of applicable experience, interpreted as at least 6,000 hours of three-phase experience within the past ten years (at least half in the field with tools; up to 3,000 hours may be course work, estimating, design, supervision or single-phase work), and an ICC-based exam with a 70 percent passing grade. Applications are filed online; the Board's rules contain no reciprocity clause.

Westchester County and Yonkers. The Department of Consumer Protection's Electrical Board licenses Master and Special Electricians by examination: exam application $50, master license $500 with $500 annual renewal, special electrician $350. The fee schedule also lists a 'Master and Reciprocal Electrician' license at the same $500, but the conditions for a reciprocal license are not published on the pages that could be opened. Yonkers does not license electricians; its electrical permits are issued to master electricians licensed by Westchester County.

Suffolk County. The Department of Consumer Affairs issues Master Electrician and Restricted Electrical licenses (codes ME and RE). Experience, exam and fee details are in the county code and were not available on the pages that could be opened.

Syracuse and Albany. Syracuse licenses electricians through its Division of Code Enforcement (2026 applications were due June 26 with in-person consideration July 28). Albany's Electrical Examining Board, under General Code Chapter 171, Article III, examines every applicant and includes master electricians licensed by the city for at least five years. Neither city publishes reciprocity rules on the pages reviewed.

Nassau County. The county FAQ treats electricians as a trade licensed under a 'standard of competency', but no Nassau page describing the master electrician license, its requirements or fees could be opened, so Nassau's rules are unverified here.

Out-of-state holders. No New York jurisdiction reviewed publishes an agreement with another state. The practical route is to meet each local board's experience threshold (documented under licensed masters, wherever they were licensed, where the board allows), pass that board's exam, which in Buffalo, Rochester and several other boards is an ICC exam that may already have been taken elsewhere, and pay the local fees; in New York City the two years of supervised experience inside the city must be earned first.

Moving to New YorkLeaving New York

Common questions

Do I have to take the Georgia master electrician exam if I'm licensed in New York?
Yes. Georgia requires the trade exam on this path.
What does it cost to get a Georgia master electrician license from New York?
Published fees on this path total $110, not counting exam vendor fees or bonds.
Do my New York work hours count in Georgia?
Yes. Documented out-of-state experience counts toward Georgia's eligibility requirements.
How long does the application take?
The board's published or typical processing time is about 30 days.
Does it work the other way, from Georgia to New York?
Not necessarily. Reciprocity is directed. Going from Georgia to New York, the mechanism is not applicable.

Sources

  1. Ga. Comp. R. & Regs. Chapter 121-3 - Licensing (Construction Industry Licensing Board) · Ga. Comp. R. & Regs. 121-3-.04 · Georgia Secretary of State, Rules and Regulations of the State of Georgia · Admin Rule · verified September 15, 2026Rule 121-3-.04 (Statewide Conditioned Air Contractor License): 'Class I Conditioned Air Contractor licenses are restricted to conditioned air contracting involving conditioned air systems or equipment not exceeding 175,000 BTU of heating and 60,000 BTU of cooling'; 'Class II licenses are unrestricted' and applicants must document installations exceeding those sizes. Class I needs four years: 'two (2) years of residential installation experience as a lead mechanic, one year as a service technician, evidence of having an E.P.A. (Environmental Protection Agency) certification, one year of residential supervisory experience, and a completion of a Board-approved heat loss and gain and duct design course.' Class II needs five years: 'two (2) years of installation as a lead mechanic with at least one of the years being commercial only, one year as a service technician or service supervisor evidence of having an E.P.A. (Environmental Protection Agency) certification, two years of commercial supervisory experience and a Board-approved heat loss and gain and duct design course.' Both require 'a minimum score of seventy (70) on the appropriate examination' and three references. The chapter creates journeyman licenses only for plumbers (Rule 121-3-.02); there is no journeyman conditioned air classification.
  2. Georgia State Board of Electrical Contractors (Construction Industry Licensing Board, Division of Electrical Contractors) · Georgia Secretary of State, Professional Licensing Boards Division · Agency Page · verified September 15, 2026Board home page. States that paper applications are no longer accepted and all applications go through the GOALS portal; licenses expire June 30, 2026 with a late period through August 15, 2026. The board's menu lists only electrical contractor licensing; there is no journeyman electrician license.
  3. Electrical Contractor License - Application for Licensure by Examination (Class 1 Restricted / Class 2 Non-Restricted), Revised 08/22 · Georgia Construction Industry Licensing Board, Division of Electrical Contractors · Form · verified September 15, 2026'You must document a minimum of 4 years (2,000 hours = 1 year) of qualifying experience ... gained working under a Licensed Electrical Contractor'; 'If the license holder is from out of state, notate on the application if their license is equivalent to a Restricted or Non-Restricted Georgia license.' Class I requires experience in at least six of the eight Primary Experience areas; Class II requires all eight plus installations in excess of single-phase 400-ampere systems under a Class II contractor. Three notarized references (one licensed electrical contractor), certified background check, PSI/AMP is the testing vendor and collects the exam fee. The 2022 paper form lists a $40 application fee; paper forms are no longer accepted and the online guide lists $110.
  4. How-To Guide: Electrical Contractors · Georgia Secretary of State, Professional Licensing Boards Division · Agency Page · verified September 15, 2026Lists the application types (Restricted, Non-Restricted, Non-Restricted Reciprocity, reinstatements, renewal). Restricted and Non-Restricted exam applications: 'Completed, signed, and notarized application with $110 fee', background check, work experience, three references, citizenship affidavit. Reciprocity: 'Apply for reciprocity if you have a current license with no violations and obtained by exam from Alabama, Louisiana, North Carolina, South Carolina, or Tennessee', with three references, background check and 'Verification of out of state License'. Applications are generally processed within 20 business days; licenses renew by June 30 of even-numbered years. The fee-schedule link goes to the GOALS portal, which could not be opened.
  5. Electrical Contractors - Reciprocity Application (Class 2 Non-Restricted), Revised 08/22 · Ga. Comp. R. & Regs. 121-2-.03 (cited on the form under its former number 121-2-.05) · Georgia Construction Industry Licensing Board, Division of Electrical Contractors · Form · verified September 15, 2026'The Board has approved the unrestricted electrical contractor examinations given by' the Alabama Electrical Contractors Board, Louisiana State Licensing Board for Contractors, North Carolina State Board of Examiners of Electrical Contractors, South Carolina Contractor's Licensing Board, and State of Tennessee Board for Licensing Contractors. The Board waives the exam when the applicant obtained the license by passing that state's equivalent exam, holds a current active license, has no penalties or violations, submits a sealed Verification of Licensure showing the exam was passed, and meets all other Georgia requirements; Louisiana licensees must have been licensed at least 3 years. Licenses obtained by grandfathering, endorsement, conversion or reciprocity are not eligible. Requires three notarized reference forms (one from a licensed electrical contractor) and a certified local law-enforcement background check. This 2022 paper form shows a $40 fee ($30 + $10 processing); paper forms are no longer accepted.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related