LicensebyState

Tennessee to Montana: master electrician license reciprocity

No credit· Start overVerified September 15, 2026· 8 sources

Tennessee does not issue a statewide master electrician license, so there is nothing to transfer. Here is Montana's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Licensure by examination for states not determined substantially equivalent

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

A master electrician from any state other than the five marked 'Yes' in the board's Substantial Equivalency Determinations must take the Montana master exam. Out-of-state journeyman-level experience counts: the applicant submits third-party experience verification of 8,000 hours of journeyman-level work in planning, laying out or supervising installations (or EE transcripts sent directly by the school plus 2,000 hours), together with verifications for every license ever held and any discipline records. MCA 37-1-304 lets the board weigh actual experience and credentials against any deficiency in the origin state's standards. After approval the applicant pays PSI $85 for the open-book 2020 NEC master exam (75% to pass); a $50 journeyman-level temporary practice permit is available while waiting to test.

Applicants who fail the master exam with 69% or less are not eligible for a temporary practice permit. No processing timeline is published.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Count toward eligibility

What you must already have

  • You must document at least 8,000 hours of qualifying work experience.Legally obtained journeyman-level experience in planning, laying out or supervising installation and repair of wiring, apparatus or equipment; no more than 50% residential (ARM 24.141.515(2)). Alternative: electrical engineering degree plus 2,000 hours of practical experience
  • Official license verification from every state or jurisdiction in which the applicant holds or has ever held a professional license of any type

What you'll do to get licensed in Montana

  1. 1Application fee. Pay the application fee ($190). Application for license by examination, includes the original license fee (ARM 24.141.405); nonrefundable.
  2. 2Trade exam. Pass the destination's trade exam. Montana Master Electrician examination administered by PSI, open book on the 2020 NEC, at least 80 questions, 75% to pass.
  3. 3Exam fee. Pay the exam fee ($85). PSI examination fee, paid to PSI after board approval; nonrefundable, valid one year.
  4. 4Other. Optional journeyman temporary practice permit for master exam candidates (90 days or until exam results) ($50) (if applicable).

Published fees on this path total $275, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee · $85

How Montana licenses master electricians

Montana master electrician · “Master Electrician

Statewide license

Verified September 15, 2026· 5 sources

Issued by Montana State Electrical Board (Department of Labor & Industry, Business Standards Division)

Montana issues a statewide Master Electrician license through the State Electrical Board. Under MCA 37-68-304 an applicant needs either an electrical engineering degree from an accredited college plus 2,000 hours of practical experience, or at least 8,000 hours of legally obtained journeyman-level experience in planning, laying out or supervising electrical installations (no more than 50% residential), and must pass the PSI open-book exam on the 2020 NEC (at least 80 questions) with 75%. The $190 application fee includes the original license; renewal is $140 every two years with 16 CE hours. Out-of-state masters are reviewed for substantial equivalency: the board's published determinations mark only Alabama, Idaho, Nebraska, Utah and Wyoming as 'Yes', and their licensees are licensed by endorsement without the exam; masters from all other states must take the Montana exam. The board does not sign formal master-level reciprocity agreements (ARM 24.141.504(1) limits those to residential and journeyman licenses).

Moving to MontanaLeaving Montana

Why Tennessee has nothing to transfer

Tennessee master electrician

Licensed by cities and counties

Verified September 15, 2026· 13 sources

Issued by Local code enforcement offices (Nashville, Memphis/Shelby County, Knoxville, Chattanooga and other exempt jurisdictions); state issues only the CE contractor license

Tennessee does not issue a master electrician license. The state-level credential for electrical contracting is a contractor license with the CE (electrical) classification from the Board for Licensing Contractors, which is issued to a business (sole proprietorship, partnership, LLC or corporation) that names a qualifying agent, and which is required for any electrical project of $25,000 or more. To obtain it the qualifying agent passes the Tennessee Business & Law exam and the CE trade exam (Prov), and the business files a reviewed or audited CPA financial statement (or, from July 1, 2026, a surety bond) that sets its monetary limit, proves general liability and workers' compensation insurance, and pays a $250 application fee ($200 biennial renewal). The Board has trade-exam-waiver agreements under which a contractor licensed in Alabama, Louisiana, Mississippi, North Carolina, Ohio, South Carolina or West Virginia, or one who passed the NASCLA electrical exam, skips the CE trade exam but still takes the Business & Law exam and meets every other requirement; the Board stresses that these 'do NOT allow using another state's license in Tennessee'. Master electrician licenses proper exist only at the local level in the jurisdictions that run their own inspection programs: Nashville (Metro Master Electrician, six years of experience), Memphis/Shelby County (Master Electrician, four years as a journeyman), Chattanooga (Class I electrical contractor, three years as a journeyman) and other exempt jurisdictions, each with its own exam and fees and none publishing reciprocity for out-of-state masters. An out-of-state master electrician who only wants to work for an employer needs no state license; to pull permits for small jobs they need the local master license or an LLE where accepted, and to contract for work of $25,000 or more they need the state CE contractor license.

How local licensing works in Tennessee

State CE contractor license (business level). Required statewide for electrical projects of $25,000 and up and accepted by every local jurisdiction for permits, but it is a business license, not a personal master credential. Requirements: qualifying agent (owner, officer or full-time employee) passes the Tennessee Business & Law exam and the Electrical (CE) trade exam administered by Prov; reviewed or audited financial statement less than 12 months old (or a contractors' surety bond at 50% of the requested limit from July 1, 2026) setting a monetary limit of 10 times the lesser of working capital or net worth ($300,000 of each for an unlimited limit); general liability insurance scaled to the limit; workers' compensation or exemption; $250 initial fee, $200 renewal every two years; exam scores valid about two years. Trade exam waiver (the only state reciprocity): a contractor licensed in Alabama, Louisiana, Mississippi, North Carolina, Ohio, South Carolina or West Virginia whose board verifies a comparable electrical exam on the Request for Contractor License Verification form, or who passed the NASCLA Electrical exam, files that verification in place of the CE trade exam score. The Business & Law exam is never waived, applicants with discipline, open complaints or felonies are ineligible, and the waiver cannot be used for the LLE. Arkansas's agreement covers only building classifications, not electrical.

Nashville (Metro Codes and Building Safety). The Mechanical, Plumbing, and Electrical Examiners and Appeals Board issues the Metropolitan Master Electrician certificate. Applicants need six years of experience (an electrical engineering degree may substitute), employer verification letters, a character letter and approval by the Chief Electrical Inspector, then pass the Prov-administered Metro master exam with 70%. The application asks whether the applicant holds a master license in another city or state and how long, but no exam waiver is described. Nashville registers state CE contractors separately.

Memphis / Shelby County (Office of Construction Code Enforcement). The Master Electrician license (Sec. 1305 of the joint electrical code) requires age 24 and either an electrical engineering degree plus two years of installation experience or four certified years as a journeyman; application in person with three industry recommendations, 30-day investigation, exam before the Electrical Code Advisory Board on theory, installation, the NEC and local codes. Fees: exam $150, initial license $100, active renewal $150. A separate Electrical Contractor license ($150 exam, $150 license, $150 registration) must be held by or employ a master; state-certified CE contractors register for $150 instead of testing. No reciprocity provision appears in the code.

Chattanooga (Land Development Office). The Class I electrical license is the contractor/master credential: three or more years as a journeyman or plant electrician (or three years as a Class II residential contractor, a prior Class I license, a Tennessee PE license, or equivalent), city examination, $415 per two-year term. A Board of Electrical Examiners oversees testing; no reciprocity is mentioned.

Knoxville (Plans Review & Inspections). Knoxville is on the state's exempt list and requires a city registration to pull permits; a state CE contractor registers directly. Details of Knoxville's own electrical contractor/master exam and fees are not published on the pages found (865-215-4311).

Out-of-state holders. No Tennessee city or the state endorses another state's master license as such. The realistic paths are: (1) obtain the state CE contractor license, using the trade-exam waiver if licensed in AL, LA, MS, NC, OH, SC or WV or NASCLA-tested, which every jurisdiction accepts; or (2) apply for the local master license in each exempt jurisdiction where you will work, documenting the experience required there and passing the local exam.

Moving to TennesseeLeaving Tennessee

Common questions

Do I have to take the Montana master electrician exam if I'm licensed in Tennessee?
Yes. Montana requires the trade exam on this path.
What does it cost to get a Montana master electrician license from Tennessee?
Published fees on this path total $275, not counting exam vendor fees or bonds.
Do my Tennessee work hours count in Montana?
Yes. Documented out-of-state experience counts toward Montana's eligibility requirements.
Does it work the other way, from Montana to Tennessee?
Not necessarily. Reciprocity is directed. Going from Montana to Tennessee, the mechanism is not applicable.

Sources

  1. Montana State Electrical Board - Exam Information · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 15, 2026PSI is the exam vendor; exams are based on the 2020 NEC as of June 10, 2022; only board-approved applicants may register and may sit within about a week of the admission letter; PSI test centers nationwide.
  2. Montana State Electrical Board / PSI Examination Information Sheet (3/27/2025) · Montana Department of Labor & Industry / PSI Services · Other · verified September 15, 2026PSI examination fees: Master Electrician $85, Journeyman Electrician $75, Residential Electrician $75; fees nonrefundable and valid one year; Montana test sites in Billings, Helena, Missoula, Great Falls and other locations.
  3. Montana State Electrical Board Laws and Rules Booklet (MCA Title 37 Chapter 68 and ARM Title 24 Chapter 141) · ARM 24.141.405, 24.141.502, 24.141.503, 24.141.504, 24.141.515 · Montana Department of Labor & Industry, Business Standards Division · Admin Rule · verified September 15, 202624.141.405 fee schedule: application for license by examination $190 (includes original license), application by endorsement or reciprocity $190 (includes original license), temporary permit $50, renewal (two years) master $140 / journeyman $140, exam fees set by the testing agency; fees nonrefundable. 24.141.503: passing grade 70% for residential and journeyman exams, 75% for master; exams open book. 24.141.504: the board may enter reciprocity agreements case by case for residential or journeyman licenses with states whose requirements are substantially equivalent or greater; may issue a license by endorsement to an applicant who files a completed application with fees and holds a current, valid license in good standing in the category applied for; licenses issued by a city, county or municipality are not considered. 24.141.502: temporary practice permit valid 90 days or until exam results. 24.141.515: no more than 50% of experience may be residential.
  4. Montana State Electrical Board - Master Electrician Licensing Requirements, Application Checklist and Application (Rev. 07/22/2024) · MCA 37-68-304; ARM 24.141.502, 24.141.515(2) · Montana Department of Labor & Industry, Business Standards Division · Form · verified September 15, 2026Same SE structure as the journeyman checklist: an active, unrestricted, good-standing master license from a state that requires an electrical exam and either an EE degree plus 2,000 hours or 8,000 hours of journeyman-level experience is licensed without the Montana exam; otherwise the exam is required. By examination: EE degree plus 2,000 hours, or 8,000 hours of journeyman-level experience with not more than 50% residential. Fees $190 application (includes license) and optional $50 journeyman temporary practice permit; applicants failing the master exam with 69% or less are ineligible for a permit.
  5. Montana State Electrical Board - Master Electrician license information · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 15, 2026Links the Master Electrician application, checklist, online application and the Montana Substantial Equivalency Determinations document; exams on the 2020 NEC; 16 CE hours per renewal cycle; fees nonrefundable.
  6. MCA 37-1-304 - Licensure by endorsement -- reciprocity · MCA 37-1-304 · Montana Legislature · Statute · verified September 15, 2026An applicant for licensure by endorsement must have an active license in good standing from a jurisdiction whose qualifications, measured at the time of application, are substantially equivalent to Montana's; where they are not, the board may evaluate whether the applicant's actual work experience and credentials cure the deficiency; reciprocity agreements may not license applicants who have not met substantially equivalent standards.
  7. MCA 37-68-304 - Master electricians -- application -- qualifications -- contents of examination -- fees · MCA 37-68-304 · Montana Legislature · Statute · verified September 15, 2026Master applicants furnish written evidence of an electrical engineering degree plus 2,000 hours of practical experience, or at least 8,000 hours of legally obtained journeyman-level experience in planning, laying out or supervising installation and repair of wiring; must pass a board-prescribed exam of at least 80 questions on the NEC and Montana rules.
  8. Montana Substantial Equivalency Determinations - State Electrical Board tables (Residential, Journeyman and Master Electrician) · MCA 37-1-304 · Montana Department of Labor & Industry, Business Standards Division · Agency Page · verified September 15, 2026State-by-state Yes/No tables linked from the board's license pages. Journeyman Electrician 'Yes': Alabama, Alaska, Arkansas, Colorado, Connecticut, Hawaii, Idaho, Iowa, New Hampshire, North Dakota, Oklahoma, Oregon, Rhode Island, South Dakota, Utah, Vermont, Virginia, Washington, Wisconsin, Wyoming (all other states No, including Texas, Minnesota, Nebraska, New Mexico and Maine). Master Electrician 'Yes': Alabama, Idaho, Nebraska, Utah, Wyoming. The document carries no publication date.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related