Tennessee to Ohio: master electrician license reciprocity
Ohio has a reciprocity agreement with Tennessee: a Tennessee master electrician can get a Ohio license without retaking the trade exam.
Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.
Reciprocity with Tennessee (electrical; Ohio Business and Law exam still required)
A signed state-to-state agreement. The trade exam is waived; you apply, prove your history, and pay the fee.
OCILB waives the Ohio trade examination for an applicant who currently holds a Tennessee electrical license issued after passing Tennessee's exam or through Tennessee's grandfathering process, but the Tennessee reciprocity form states that applicants will be required to take the Ohio Business and Law exam. Tennessee licensees who obtained their license by reciprocity from another state are not permitted to reciprocate into Ohio. The applicant files the Tennessee reciprocity application with a $25 non-refundable fee per trade, a Reciprocity Verification of Licensure completed under seal by the Tennessee Board for Licensing Contractors, a $500,000 certificate of liability insurance naming OCILB, and assigns the license to a contracting company.
At a glance
- Trade exam
- Waived
- Law / code exam
- Required
- Agreement
- Active
What you must already have
- Your Tennessee license must have been obtained by examination, not by reciprocity or grandfathering.
- Your Tennessee license must be active and in good standing.
- You must have no disciplinary action or unresolved complaints on your record.
What you'll do to get licensed in Ohio
- 1Application fee. Pay the application fee ($25). Reciprocity application fee, non-refundable, per trade.
- 2Law / code exam. Pass a law, rules, or code exam. Ohio Business and Law examination (PSI).
- 3Insurance. Carry the required insurance ($500,000). Certificate of liability insurance of at least $500,000, certificate holder OCILB.
- 4Other. Reciprocity Verification of Licensure completed under seal by the Tennessee board, including exam score.
- 5Other. Assignment of the license to a contracting company (R.C. 4740.01).
Published fees on this path total $25, excluding exam-vendor fees, bonds, and insurance.
What you'll need to buy or arrange
Exam preparation
Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.
- Law / code exam
Liability insurance
Some states require proof of general liability or workers' compensation coverage at licensing time.
- Insurance · $500,000
How Ohio licenses master electricians
Ohio master electrician · “Electrical Contractor (OCILB state license)”
Statewide license
Issued by Ohio Construction Industry Licensing Board (OCILB), Ohio Department of Commerce
Ohio has no license called 'master electrician'; its top person-held electrical credential is the statewide Electrical Contractor license issued by the Ohio Construction Industry Licensing Board (OCILB) to an individual (R.C. 4740.01(A)), who must then assign it to a contracting company. It is the credential Texas treats as equivalent to a master electrician license, and other states' reciprocity forms pair it with their master electrician licenses. A new applicant must be 18, a citizen or legal alien, have five years as a tradesperson in the electrical trade immediately before applying (or be an Ohio registered engineer with three years of construction business experience), pass BCI and FBI background checks, pass both sections of the PSI-administered examination (trade and Business & Law), carry $500,000 of contractor liability insurance in one company name, and pay a $25 application fee and $25 license fee. OCILB publishes reciprocity application pages for Kentucky, North Carolina, West Virginia, South Carolina, Tennessee and Louisiana, and Texas announced a master-level agreement with OCILB in June 2026. Licenses expire annually and renew with continuing education.
Why Tennessee has nothing to transfer
Tennessee master electrician
Licensed by cities and counties
Tennessee does not issue a master electrician license. The state-level credential for electrical contracting is a contractor license with the CE (electrical) classification from the Board for Licensing Contractors, which is issued to a business (sole proprietorship, partnership, LLC or corporation) that names a qualifying agent, and which is required for any electrical project of $25,000 or more. To obtain it the qualifying agent passes the Tennessee Business & Law exam and the CE trade exam (Prov), and the business files a reviewed or audited CPA financial statement (or, from July 1, 2026, a surety bond) that sets its monetary limit, proves general liability and workers' compensation insurance, and pays a $250 application fee ($200 biennial renewal). The Board has trade-exam-waiver agreements under which a contractor licensed in Alabama, Louisiana, Mississippi, North Carolina, Ohio, South Carolina or West Virginia, or one who passed the NASCLA electrical exam, skips the CE trade exam but still takes the Business & Law exam and meets every other requirement; the Board stresses that these 'do NOT allow using another state's license in Tennessee'. Master electrician licenses proper exist only at the local level in the jurisdictions that run their own inspection programs: Nashville (Metro Master Electrician, six years of experience), Memphis/Shelby County (Master Electrician, four years as a journeyman), Chattanooga (Class I electrical contractor, three years as a journeyman) and other exempt jurisdictions, each with its own exam and fees and none publishing reciprocity for out-of-state masters. An out-of-state master electrician who only wants to work for an employer needs no state license; to pull permits for small jobs they need the local master license or an LLE where accepted, and to contract for work of $25,000 or more they need the state CE contractor license.
How local licensing works in Tennessee
State CE contractor license (business level). Required statewide for electrical projects of $25,000 and up and accepted by every local jurisdiction for permits, but it is a business license, not a personal master credential. Requirements: qualifying agent (owner, officer or full-time employee) passes the Tennessee Business & Law exam and the Electrical (CE) trade exam administered by Prov; reviewed or audited financial statement less than 12 months old (or a contractors' surety bond at 50% of the requested limit from July 1, 2026) setting a monetary limit of 10 times the lesser of working capital or net worth ($300,000 of each for an unlimited limit); general liability insurance scaled to the limit; workers' compensation or exemption; $250 initial fee, $200 renewal every two years; exam scores valid about two years. Trade exam waiver (the only state reciprocity): a contractor licensed in Alabama, Louisiana, Mississippi, North Carolina, Ohio, South Carolina or West Virginia whose board verifies a comparable electrical exam on the Request for Contractor License Verification form, or who passed the NASCLA Electrical exam, files that verification in place of the CE trade exam score. The Business & Law exam is never waived, applicants with discipline, open complaints or felonies are ineligible, and the waiver cannot be used for the LLE. Arkansas's agreement covers only building classifications, not electrical.
Nashville (Metro Codes and Building Safety). The Mechanical, Plumbing, and Electrical Examiners and Appeals Board issues the Metropolitan Master Electrician certificate. Applicants need six years of experience (an electrical engineering degree may substitute), employer verification letters, a character letter and approval by the Chief Electrical Inspector, then pass the Prov-administered Metro master exam with 70%. The application asks whether the applicant holds a master license in another city or state and how long, but no exam waiver is described. Nashville registers state CE contractors separately.
Memphis / Shelby County (Office of Construction Code Enforcement). The Master Electrician license (Sec. 1305 of the joint electrical code) requires age 24 and either an electrical engineering degree plus two years of installation experience or four certified years as a journeyman; application in person with three industry recommendations, 30-day investigation, exam before the Electrical Code Advisory Board on theory, installation, the NEC and local codes. Fees: exam $150, initial license $100, active renewal $150. A separate Electrical Contractor license ($150 exam, $150 license, $150 registration) must be held by or employ a master; state-certified CE contractors register for $150 instead of testing. No reciprocity provision appears in the code.
Chattanooga (Land Development Office). The Class I electrical license is the contractor/master credential: three or more years as a journeyman or plant electrician (or three years as a Class II residential contractor, a prior Class I license, a Tennessee PE license, or equivalent), city examination, $415 per two-year term. A Board of Electrical Examiners oversees testing; no reciprocity is mentioned.
Knoxville (Plans Review & Inspections). Knoxville is on the state's exempt list and requires a city registration to pull permits; a state CE contractor registers directly. Details of Knoxville's own electrical contractor/master exam and fees are not published on the pages found (865-215-4311).
Out-of-state holders. No Tennessee city or the state endorses another state's master license as such. The realistic paths are: (1) obtain the state CE contractor license, using the trade-exam waiver if licensed in AL, LA, MS, NC, OH, SC or WV or NASCLA-tested, which every jurisdiction accepts; or (2) apply for the local master license in each exempt jurisdiction where you will work, documenting the experience required there and passing the local exam.
- Nashville / Davidson County (Metro Codes and Building Safety)
- Memphis / Shelby County (Office of Construction Code Enforcement)
- Knoxville (Plans Review & Inspections)
- Chattanooga (Land Development Office)
- Hamilton County
- Clarksville
- Murfreesboro
- Franklin
- Jackson
- Kingsport
Common questions
- Do I have to take the Ohio master electrician exam if I'm licensed in Tennessee?
- The trade exam is waived, but Ohio requires a law or code exam.
- What does it cost to get a Ohio master electrician license from Tennessee?
- Published fees on this path total $25, not counting exam vendor fees or bonds.
- Does it work the other way, from Ohio to Tennessee?
- Not necessarily. Reciprocity is directed. Going from Ohio to Tennessee, the mechanism is not applicable.
Sources
- Ohio Department of Commerce - Ohio Construction Industry Licensing Board (OCILB) · Ohio Department of Commerce, Division of Industrial Compliance · Agency Page · verified September 15, 2026States that OCILB issues licenses to qualified electrical, HVAC, plumbing, hydronics and refrigeration contractors who pass the licensing examination. No journeyman or individual electrician license is mentioned.
- OCILB - Contractors & Contracting Companies (state license requirements, reciprocity list, document checklists) · Ohio Department of Commerce, Division of Industrial Compliance · Agency Page · verified September 15, 2026Opened through the r.jina.ai text proxy because com.ohio.gov returned 404 to the fetcher. States that OCILB issues state licenses to commercial contractors in five trades: Electrical, HVAC, Hydronics, Plumbing and Refrigeration. Requirements: age 18, citizen or legal alien, five years as a tradesperson in the trade (or Ohio registered engineer with three years of construction business experience), no disqualifying offense, pass the trade examination, $500,000 contractor liability coverage, fees; BCI and FBI background checks after board approval and before the exam. Fees: $25 application per trade, $25 licensing fee per trade, $60 annual escrow renewal. 'Reciprocity with other states' section: Ohio offers reciprocity only to applicants who passed the state-recognized test; Tennessee accepts Ohio grandfathered licensees; where noted the Business and Law (B&L) exam is required. List: Alabama - HVAC and Refrigeration; Arkansas - Plumbing; Kentucky - Electrical, HVAC, Refrigeration; Louisiana - Electrical, HVAC, Refrigeration - B&L; Mississippi - Electrical, HVAC, Refrigeration, Plumbing - B&L; North Carolina - Electrical; South Carolina - Electrical, HVAC, Plumbing - B&L; Tennessee - Electrical, HVAC, Refrigeration, Plumbing, Hydronics - B&L; West Virginia - Electrical, HVAC, Plumbing; Virginia - Electrical; Texas - Electrical. Reciprocity applicant checklist: notarized reciprocity application, OCILB verification form signed by the other state's board, $25 application fee per trade. The page says nothing about a journeyman, technician or individual HVAC license and nothing about EPA Section 608.
- OCILB - Reciprocity Application - Tennessee (EL, HV, RE, PL, HY) · Ohio Department of Commerce, Division of Industrial Compliance · Agency Page · verified September 15, 2026Opened through the r.jina.ai text proxy. Covers Electrical, HVAC, Refrigeration, Plumbing and Hydronics: a current Tennessee license for the trade, issued after passing the required exam or via Tennessee's grandfathering rules.
- OCILB Tennessee Reciprocity Application (PDF) · Ohio Construction Industry Licensing Board · Form · verified September 15, 2026Types: EL, HVAC, RE, HY, PL. Applicant must currently hold a Tennessee license obtained by testing or grandfathering with Tennessee; Tennessee licenses obtained by reciprocity from another state are not permitted to reciprocate into Ohio. 'Applicants will be required to take the Ohio Business and Law exam.' Reciprocity Verification of Licensure under state seal.
- Ohio Revised Code 4740.01 - Construction industry licensing board definitions · R.C. 4740.01(A), (C), (E) · Ohio Legislative Service Commission · Statute · verified September 15, 2026'License' means a license the board issues to an individual as a heating, ventilating, and air conditioning contractor, refrigeration contractor, electrical contractor, plumbing contractor, or hydronics contractor. 'Tradesperson' means an individual employed by a contractor who performs the work without assuming responsibility for the means, method or manner of the work; tradespersons are not licensed under the chapter. 'Contracting company' is a company in the construction industry working on construction projects. Effective September 17, 2014.
- Ohio Revised Code 4740.06 - License application; qualifications for examination · R.C. 4740.06(B), (C), (F), (H) · Ohio Legislative Service Commission · Statute · verified September 15, 2026(B) age 18, citizen or legal alien, five years as a tradesperson in the trade (or registered engineer with three years' business experience), contractor's liability insurance. (C) alternative qualification for holders of a substantially similar out-of-state license: at least five building authorizations and a tax return showing income under that license. (F) the specialty section authorizes the license within 90 days of the application once the applicant qualifies and passes the exam. (H) renewal without re-examination with continuing education. Effective September 30, 2025 (H.B. 96, 136th General Assembly).
- Ohio Revised Code 4740.08 - Reciprocity · R.C. 4740.08 · Ohio Legislative Service Commission · Statute · verified September 15, 2026When a written reciprocity agreement between the states exists, an individual licensed in the other state who submits a copy of the agreement and pays the licensure fee is licensed without examination if the specialty section finds the other state's requirements substantially equal and that it extends similar reciprocity to Ohio licensees; the section may withdraw authorization for good cause before issuance. Effective December 29, 2023.
- Ohio Revised Code 4740.09 - Fees · R.C. 4740.09 · Ohio Legislative Service Commission · Statute · verified September 15, 2026License, renewal and late fees are set by each specialty section subject to Controlling Board approval; the statute itself contains no dollar amounts.
Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.