LicensebyState

Illinois to Connecticut: master HVAC technician license reciprocity

No credit· Start overVerified September 15, 2026· 8 sources

Illinois does not issue a statewide master HVAC technician license, so there is nothing to transfer. Here is Connecticut's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Contractor (S-1) by equivalent out-of-state license (all states)

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

A master HVAC technician or HVAC/mechanical contractor licensed in any other state applies under DCP's 'Heating Contractor - Equivalent Out of State License' path. DCP reviews a single out-of-state license for equivalency to the S-1: it must have required 576 classroom hours with a curriculum matching Exhibit A and 12,000 on-the-job hours (8,000 as an apprentice plus two years as a licensed journeyperson); the limited D-1 class needs 8,000 OJT and 432 classroom hours and the B-1 needs 6,000 and 288. The applicant submits a copy of the license, an official license verification, the laws and regulations that set the requirements met to obtain it, and the scope of work for that license, with the non-refundable $150 application fee. If approved, the applicant must pass both the S-1 trade exam and the Business and Law exam through PSI ($59 per portion) and then pay the $150 initial license fee; the out-of-state license does not waive either exam because Connecticut has no reciprocal agreements. An applicant whose license is not found equivalent must document the classroom and OJT hours directly under the equivalent experience and training path, where out-of-state journeyman service counts if DCP finds it comparable (CGS 20-334a(a)(1)(A)).

The out-of-state license page does not restate the exam requirement; it follows from the Heating, Cooling and Sheet Metal Work Licenses page, CGS 20-334a(a)(1)(A) and the PSI bulletin, which states that all contractors must pass a Business and Law examination and a trade examination. CGS 20-333a allows licensure without examination only where the other state reciprocates for Connecticut licensees, and DCP states no such agreements exist. Whether DCP treats an out-of-state 'master HVAC' license (rather than a contractor license) as the S-1 equivalent depends on the hour and curriculum comparison; DCP publishes no list of accepted titles. EPA Section 608 is not mentioned on the DCP pages but applies federally to anyone handling refrigerants.

At a glance

Trade exam
Required
Law / code exam
Required
Out-of-state hours
Count toward eligibility

What you must already have

  • Your Illinois license must be active and in good standing.
  • The out-of-state license must be equivalent: it required 576 classroom hours matching Exhibit A and 12,000 OJT hours for the S-1 (D-1: 432 classroom / 8,000 OJT; B-1: 288 / 6,000)Only one out-of-state license is reviewed for equivalency.
  • You must document at least 12,000 hours of qualifying work experience.8,000 hours as an apprentice plus 2 years (4,000 hours) working as a licensed journeyperson; journeyman service outside Connecticut counts if DCP finds it comparable.

What you'll do to get licensed in Connecticut

  1. 1Application fee. Pay the application fee ($150). Contractor application fee, non-refundable (CGS 20-333).
  2. 2Other. Copy of the out-of-state license, official license verification, the laws/regulations listing the requirements met to obtain it, and the scope of work for that license.
  3. 3Trade exam. Pass the destination's trade exam. S-1 Unlimited Heating, Piping and Cooling Contractor trade exam administered by PSI: 80 questions, 3 hours, 70% to pass, open book (D-1: 70 questions, 3 hours; B-1: 50 questions, 2 hours).
  4. 4Law / code exam. Pass a law, rules, or code exam. Connecticut Business and Law exam (PSI): 50 questions, 2 hours, 70% to pass, based on the NASCLA Contractors Guide to Business, Law and Project Management, Connecticut 6th edition.
  5. 5Exam fee. Pay the exam fee ($59). PSI fee for the trade portion (same fee for retakes).
  6. 6Exam fee. Pay the exam fee ($59). PSI fee for the Business and Law portion (same fee for retakes).
  7. 7License fee. Pay the license or certificate fee ($150). Initial license fee for a contractor's license after passing both exams (CGS 20-335); renews annually for $150, expiring August 31.
  8. 8Other. Hold EPA Section 608 technician certification to handle refrigerant; federal law requires it, but it is not a condition of this state license (if applicable).

Published fees on this path total $418, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Law / code exam
  • Exam fee · $59
  • Exam fee · $59
  • Other · if applicable

How Connecticut licenses master HVAC technicians

Connecticut master HVAC technician · “S-1 Unlimited Heating, Piping and Cooling Contractor”

Statewide license

Verified September 15, 2026· 6 sources

Issued by Connecticut Department of Consumer Protection, Occupational and Professional Licensing (Heating, Piping, Cooling and Sheet Metal Work Examining Board)

Connecticut has no license titled 'master HVAC'; the top-tier personal credential is the S-1 Unlimited Heating, Piping and Cooling Contractor, issued by DCP to an individual (DCP licenses individuals, not companies) and permitting all heating, piping and cooling work under CGS 20-330, pulling permits and contracting with the public. Limited contractor classes cover narrower scopes, chiefly the D-1 Limited Warm Air, Air Conditioning and Refrigeration Contractor and the B-1 Limited Gas and Oil Burner Contractor. A new S-1 applicant needs 576 classroom hours matching DCP's Exhibit A curriculum and 12,000 OJT hours (8,000 as an apprentice plus two years, 4,000 hours, working as a licensed journeyperson), reachable through two years as a Connecticut journeyperson, equivalent experience and training, or an equivalent out-of-state license, and must pass both the PSI S-1 trade exam (80 questions, 3 hours, 70%) and the Business and Law exam (50 questions, 2 hours, 70%). CGS 20-334a(a)(1) expressly allows journeyman service performed outside Connecticut to count if DCP finds it comparable. DCP states that Connecticut does not have reciprocal agreements with any other jurisdiction. Fees are a $150 application fee, $59 per exam portion and a $150 initial license fee; licenses expire every August 31 and renew for $150.

Moving to ConnecticutLeaving Connecticut

Compare: getting a Connecticut license from scratch

Why Illinois has nothing to transfer

Illinois master HVAC technician

Licensed by cities and counties

Verified September 15, 2026· 9 sources

Illinois does not issue a statewide master HVAC or mechanical contractor license and has no state mechanical board; the master-level credential exists only at the municipal level under names that vary by city. Springfield issues a Mechanical License to individuals who document 5 years (residential) or 7 years (commercial) of practical mechanical experience and pass the ICC National Standard Master Mechanical exam (G29); Peoria licenses HVAC contractors on an ICC contractor certificate from the 2018 code cycle or newer ($150 a year); Aurora and Elgin accept the ICC Master Mechanical certification or, in Elgin, a license from any Illinois city that gives a written exam; unincorporated Cook County registers HVAC contractors for a fee with $1,000,000 in liability insurance; and Chicago has no mechanical license at all, requiring a general contractor license to pull permits. None of these jurisdictions publishes a reciprocity or endorsement path for another state's master HVAC license; Springfield's only grandfather clause is limited to licenses issued before October 2007. A master HVAC contractor arriving from another state should expect to pass the ICC Master Mechanical exam once and then license or register separately in each municipality where they will work. EPA Section 608 certification applies to anyone handling refrigerants.

How local licensing works in Illinois

How local licensing works. Illinois has no state HVAC license. Each municipality licenses or registers mechanical contractors under its own ordinance; the ICC National Standard Master Mechanical exam (G29, formerly W29; residential W32) is the common denominator among testing cities.

Chicago. No HVAC or mechanical contractor license. Contractors obtain a General Contractor license from the Department of Buildings in Class A (unlimited project value, $3,500), B ($1,800), C ($1,300), D ($900) or E (projects up to $500,000, $300), each valid one year, with commercial general liability insurance from $1 million per occurrence (Class E) to $5 million (Class A) and a financial solvency statement, administered through Continental Testing Services; no trade exam.

Springfield. The Building and Zoning Department issues a person-held Mechanical License: Residential requires 5 years of practical experience in all types of mechanical work approved by the Mechanical Commission and proof of passing the ICC Master Mechanical Exam G29; Commercial requires 7 years and the same exam. Mechanical contractors also register with the city. A contractor licensed in another Illinois or out-of-state municipality with reciprocal testing may substitute that test only if the license was issued before 10/7/2007 (10/10/2007 in the earlier memo) and never lapsed; all others pass the ICC exam. Passing the exam does not itself guarantee a license.

Peoria. HVAC contractors must be licensed or registered ($150 non-refundable, calendar year) with an ICC contractor test certificate from the 2018 or newer code cycle; holders of current Normal or Pekin licenses register without retesting. Only the licensed contractor may pull permits and must attend inspections.

Aurora. Accepts a current ICC Master Mechanical certification (N29) in lieu of municipal testing; requires a certificate of insurance naming the City of Aurora as primary and non-contributory additional insured; registration through Development Services.

Elgin. Requires a mechanical contractor's license from any Illinois city that gives a written examination, or proof of passing the ICC Master Mechanical G29 exam, plus a $20,000 license and permit bond; the license is not required when an Illinois-licensed architect or engineer seals the plans and accepts responsibility.

Unincorporated Cook County. HVAC contractors register as 'all other trades' with the Department of Building and Zoning: $150 initial and $75 annual per trade, $1,000,000 general liability insurance naming the department; no exam.

Not verified. Naperville's contractor registration page was blocked when opened for this entry; Rockford publishes only electrical registration rules.

Out-of-state holders. None of these jurisdictions publishes reciprocity or endorsement for another state's master HVAC or mechanical license. The practical route is to pass the ICC National Standard Master Mechanical exam (accepted by Springfield, Peoria, Aurora and Elgin), then license or register in each municipality where work will be performed, and obtain a Chicago general contractor license for work in Chicago.

Moving to IllinoisLeaving Illinois

Common questions

Do I have to take the Connecticut master HVAC technician exam if I'm licensed in Illinois?
Yes. Connecticut requires the trade exam on this path, plus a law or code exam.
What does it cost to get a Connecticut master HVAC technician license from Illinois?
Published fees on this path total $418, not counting exam vendor fees or bonds.
Do my Illinois work hours count in Connecticut?
Yes. Documented out-of-state experience counts toward Connecticut's eligibility requirements.
Does it work the other way, from Connecticut to Illinois?
Not necessarily. Reciprocity is directed. Going from Connecticut to Illinois, the mechanism is not applicable.

Sources

  1. Connecticut General Statutes Chapter 393 - Occupational Licensing (Electrical, Plumbing and Piping, Heating, Cooling...) · CGS §§ 20-333, 20-333a, 20-334a, 20-335 · Connecticut General Assembly · Statute · verified September 23, 2026
  2. Connecticut DCP - Heating Contractor: Equivalent Experience and Training · Connecticut Department of Consumer Protection · Agency Page · verified September 23, 2026
  3. Connecticut DCP - Heating Contractor: Equivalent Out of State License · Connecticut Department of Consumer Protection · Agency Page · verified September 15, 2026
  4. Connecticut DCP - Heating, Cooling and Sheet Metal Work Licenses (application paths, fees, renewal) · Connecticut Department of Consumer Protection · Agency Page · verified September 23, 2026
  5. Connecticut DCP - Heating, Piping, Cooling and Sheet Metal Work Examining Board · Connecticut Department of Consumer Protection · Agency Page · verified September 15, 2026
  6. Connecticut DCP - Heating, Piping and Cooling License Types and Scope of Work · Connecticut Department of Consumer Protection · Agency Page · verified September 15, 2026
  7. Connecticut DCP Occupational Licensing - Heating, Piping and Cooling Trades Candidate Information Bulletin (PSI, updated 2/4/2026) · Connecticut Department of Consumer Protection / PSI Services LLC · Form · verified September 23, 2026
  8. EPA Section 608 Technician Certification Requirements · 40 CFR Part 82, Subpart F (Clean Air Act §608) · U.S. Environmental Protection Agency · Other · verified September 15, 2026

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related