LicensebyState

Illinois to Texas: master HVAC technician license reciprocity

No credit· Start overVerified September 15, 2026· 12 sources

Illinois does not issue a statewide master HVAC technician license, so there is nothing to transfer. Here is Texas's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Out-of-state or municipal contractor license without a reciprocity agreement

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

A contractor licensed in a state other than Georgia or South Carolina (or by a municipality) files the standard Air Conditioning and Refrigeration Contractor License Application with the $115 fee, a copy of the current license, a list of the requirements met to obtain it and proof of its issue date and duration. TDLR reviews whether those requirements were substantially equivalent to Texas's and counts qualifying experience toward the 48-month requirement, but its out-of-state page warns that 'depending on the requirements of your current license, you may be required to complete some or all of the Texas requirements for licensure, including taking a licensing examination.' Applicants should therefore expect to take the PSI exam for the class and endorsement they want, and must file proof of Texas-compliant liability insurance after passing before the license issues.

TDLR does not publish which states it has found substantially equivalent or the criteria for waiving the exam; the FAQ says only that experience from states or municipalities with substantially equivalent requirements is accepted. Texas has no separate business or law exam for ACR contractors.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Count toward eligibility
Typical processing
About 45 days

What you must already have

  • Your Illinois license must be active and in good standing.
  • You must document at least 48 months of qualifying work experience.48 months of practical ACR experience within the past 72 months under a licensed contractor (Occupations Code §1302.255 as applied by 16 TAC §75.20); out-of-state experience under a substantially equivalent license counts

What you'll do to get licensed in Texas

  1. 1Application fee. Pay the application fee ($115). Air Conditioning and Refrigeration Contractor license application fee (non-refundable, 16 TAC §75.80); renewal $65 per year.
  2. 2Trade exam. Pass the destination's trade exam. PSI contractor exam for the class and endorsement applied for (Environmental Air or Commercial Refrigeration, Class A or B; 70% to pass; 2024 IFGC/IMC/UMC from September 1, 2026) unless TDLR finds the origin license substantially equivalent.
  3. 3Exam fee. Pay the exam fee ($74). PSI exam fee per Class A exam ($60 per Class B exam), paid to PSI.
  4. 4Insurance. Carry the required insurance. Commercial general liability insurance from a Texas-authorized insurer: Class A $300,000 per occurrence, $600,000 aggregate, $300,000 products/completed operations; Class B $100,000 / $200,000 / $100,000 (16 TAC §75.40).
  5. 5Continuing education. Complete continuing education. 8 hours of TDLR-approved continuing education each year for renewal.
  6. 6Other. EPA Section 608 technician certification (Type I/II/III/Universal) to handle refrigerants; federal, does not expire. Not listed on TDLR's contractor pages but required of anyone servicing refrigerant-containing equipment.

Published fees on this path total $189, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee · $74
  • Other

Liability insurance

Some states require proof of general liability or workers' compensation coverage at licensing time.

  • Insurance

Continuing education

Renewals usually need approved CE hours, often on the latest NEC. Reciprocal licensees are rarely exempt.

  • Continuing education

How Texas licenses master HVAC technicians

Texas master HVAC technician · “Air Conditioning and Refrigeration Contractor (Class A or Class B)

Statewide license

Verified September 15, 2026· 8 sources

Issued by Texas Department of Licensing and Regulation (TDLR)

Texas's highest HVAC credential is the Air Conditioning and Refrigeration Contractor license issued to an individual by TDLR, so it is mapped here to the master level. The license comes in Class A (units of any size) and Class B (cooling up to 25 tons and heating up to 1.5 million Btu/h) with Environmental Air Conditioning, Commercial Refrigeration and Process Cooling or Heating endorsements. A new applicant must be 18, document 48 months of practical ACR experience under a licensed contractor in the past 72 months (or 12 months as a certified technician plus 36 months of experience, with substitutions for HVAC/R degrees, engineering licenses and military training), pay a $115 application fee, pass the PSI exam for each class and endorsement ($74 Class A, $60 Class B, 70% to pass) within one year of filing, and file proof of commercial general liability insurance ($300,000 per occurrence/$600,000 aggregate for Class A; $100,000/$200,000 for Class B). The license is valid one year, renews for $65 and requires 8 hours of continuing education a year; a company must employ a licensed contractor at each permanent location. TDLR has reciprocity agreements with Georgia and South Carolina only; licensees from every other state or municipality apply under TDLR's substantial-equivalence review and may be required to take the Texas exam.

Moving to TexasLeaving Texas

Why Illinois has nothing to transfer

Illinois master HVAC technician

Licensed by cities and counties

Verified September 15, 2026· 9 sources

Illinois does not issue a statewide master HVAC or mechanical contractor license and has no state mechanical board; the master-level credential exists only at the municipal level under names that vary by city. Springfield issues a Mechanical License to individuals who document 5 years (residential) or 7 years (commercial) of practical mechanical experience and pass the ICC National Standard Master Mechanical exam (G29); Peoria licenses HVAC contractors on an ICC contractor certificate from the 2018 code cycle or newer ($150 a year); Aurora and Elgin accept the ICC Master Mechanical certification or, in Elgin, a license from any Illinois city that gives a written exam; unincorporated Cook County registers HVAC contractors for a fee with $1,000,000 in liability insurance; and Chicago has no mechanical license at all, requiring a general contractor license to pull permits. None of these jurisdictions publishes a reciprocity or endorsement path for another state's master HVAC license; Springfield's only grandfather clause is limited to licenses issued before October 2007. A master HVAC contractor arriving from another state should expect to pass the ICC Master Mechanical exam once and then license or register separately in each municipality where they will work. EPA Section 608 certification applies to anyone handling refrigerants.

How local licensing works in Illinois

How local licensing works. Illinois has no state HVAC license. Each municipality licenses or registers mechanical contractors under its own ordinance; the ICC National Standard Master Mechanical exam (G29, formerly W29; residential W32) is the common denominator among testing cities.

Chicago. No HVAC or mechanical contractor license. Contractors obtain a General Contractor license from the Department of Buildings in Class A (unlimited project value, $3,500), B ($1,800), C ($1,300), D ($900) or E (projects up to $500,000, $300), each valid one year, with commercial general liability insurance from $1 million per occurrence (Class E) to $5 million (Class A) and a financial solvency statement, administered through Continental Testing Services; no trade exam.

Springfield. The Building and Zoning Department issues a person-held Mechanical License: Residential requires 5 years of practical experience in all types of mechanical work approved by the Mechanical Commission and proof of passing the ICC Master Mechanical Exam G29; Commercial requires 7 years and the same exam. Mechanical contractors also register with the city. A contractor licensed in another Illinois or out-of-state municipality with reciprocal testing may substitute that test only if the license was issued before 10/7/2007 (10/10/2007 in the earlier memo) and never lapsed; all others pass the ICC exam. Passing the exam does not itself guarantee a license.

Peoria. HVAC contractors must be licensed or registered ($150 non-refundable, calendar year) with an ICC contractor test certificate from the 2018 or newer code cycle; holders of current Normal or Pekin licenses register without retesting. Only the licensed contractor may pull permits and must attend inspections.

Aurora. Accepts a current ICC Master Mechanical certification (N29) in lieu of municipal testing; requires a certificate of insurance naming the City of Aurora as primary and non-contributory additional insured; registration through Development Services.

Elgin. Requires a mechanical contractor's license from any Illinois city that gives a written examination, or proof of passing the ICC Master Mechanical G29 exam, plus a $20,000 license and permit bond; the license is not required when an Illinois-licensed architect or engineer seals the plans and accepts responsibility.

Unincorporated Cook County. HVAC contractors register as 'all other trades' with the Department of Building and Zoning: $150 initial and $75 annual per trade, $1,000,000 general liability insurance naming the department; no exam.

Not verified. Naperville's contractor registration page was blocked when opened for this entry; Rockford publishes only electrical registration rules.

Out-of-state holders. None of these jurisdictions publishes reciprocity or endorsement for another state's master HVAC or mechanical license. The practical route is to pass the ICC National Standard Master Mechanical exam (accepted by Springfield, Peoria, Aurora and Elgin), then license or register in each municipality where work will be performed, and obtain a Chicago general contractor license for work in Chicago.

Moving to IllinoisLeaving Illinois

Common questions

Do I have to take the Texas master HVAC technician exam if I'm licensed in Illinois?
Yes. Texas requires the trade exam on this path.
What does it cost to get a Texas master HVAC technician license from Illinois?
Published fees on this path total $189, not counting exam vendor fees or bonds.
Do my Illinois work hours count in Texas?
Yes. Documented out-of-state experience counts toward Texas's eligibility requirements.
How long does the application take?
The board's published or typical processing time is about 45 days.
Does it work the other way, from Texas to Illinois?
Not necessarily. Reciprocity is directed. Going from Texas to Illinois, the mechanism is not applicable.

Sources

  1. EPA Section 608 Technician Certification Requirements · 40 CFR Part 82, Subpart F (Clean Air Act §608) · U.S. Environmental Protection Agency · Other · verified September 15, 2026Federal requirement in every state: technicians who maintain, service, repair or dispose of equipment that could release refrigerants into the atmosphere must be certified (Type I small appliances, Type II high-pressure, Type III low-pressure, Universal). Apprentices under direct supervision are exempt. Certification does not expire; the core exam must be proctored for Universal certification. State HVAC boards commonly require it before licensure, but it is not itself a state license.
  2. TDLR Air Conditioning and Refrigeration Candidate Information Bulletin (PSI) · Texas Department of Licensing and Regulation / PSI Services · Other · verified September 15, 2026Linked from the TDLR exam page. Exam fees: Environmental Air Class A $74 (120 items, 230 minutes), Class B $60 (100 items, 170 minutes); Commercial Refrigeration Class A $74, Class B $60; Certified Technician $60 (60 items, 112 minutes); passing score 70%. Effective September 1, 2026 the exams reference the 2024 IFGC, 2024 IMC and 2024 UMC.
  3. 16 TAC §75.20 - Contractor Licensing Requirements: Application and Experience Requirements · 16 TAC §75.20 · Texas Department of Licensing and Regulation (mirrored by Cornell LII) · Admin Rule · verified September 15, 2026To obtain a contractor license an applicant must file the application, satisfy Occupations Code §1302.255 as of the filing date, pass the examination, pay the fees, submit proof of insurance after passing the exam, and complete everything within one year of filing; experience must be documented as prescribed by the department.
  4. 16 TAC §75.22 - Contractor Licensing Requirements: General · 16 TAC §75.22 · Texas Department of Licensing and Regulation (mirrored by Cornell LII) · Admin Rule · verified September 15, 2026License term is one year and non-transferable; endorsement codes E (Environmental Air Conditioning), R (Commercial Refrigeration and Process Cooling or Heating) and C (combined); a Class B holder may upgrade an endorsement by passing the Class A exam.
  5. 16 TAC §75.80 - Air Conditioning and Refrigeration: Fees · 16 TAC §75.80 · Texas Department of Licensing and Regulation (mirrored by Cornell LII) · Admin Rule · verified September 15, 2026Read on the Cornell Legal Information Institute mirror because the Texas Secretary of State's texreg site has moved to a new portal that could not be opened. Contractor application $115, renewal $65, endorsement addition $25; registered technician application and renewal $20; certified technician application $50, renewal $35; all application fees non-refundable.
  6. TDLR - Apply for a New Air Conditioning and Refrigeration Contractor License · Texas Department of Licensing and Regulation · Agency Page · verified September 15, 2026Eligibility: age 18; 48 months of practical experience under a licensed ACR contractor in the past 72 months, or 12 months as a certified technician plus 36 months in the past 48 months, with substitutions for HVAC/R degrees, engineering licenses, military training and industrial process work; experience documented on the Experience Verification Form by the supervisor; $115 application fee; exam must be passed within one year of filing; commercial general liability insurance (Class A $300,000 per occurrence/$600,000 aggregate/$300,000 products; Class B $100,000/$200,000/$100,000); Class A any size, Class B up to 25 tons cooling and 1.5 million Btu/h heating; endorsements Environmental Air, Commercial Refrigeration, Process Cooling or Heating.
  7. TDLR - Renew an Air Conditioning and Refrigeration Contractor License · Texas Department of Licensing and Regulation · Agency Page · verified September 15, 2026Renewal fee $65 (1.5x if expired 90 days or less, 2x if more than 90 days); 8 hours of approved continuing education each year; adding an endorsement or upgrading a class costs a $74 exam fee plus a $25 change fee.
  8. TDLR - Air Conditioning and Refrigeration Contractors Exam Information · Texas Department of Licensing and Regulation · Agency Page · verified September 15, 2026Exams are administered by PSI after TDLR approves eligibility; separate Environmental Air A/B and Commercial Refrigeration A/B contractor exams and a Certified Technician exam; failed exams may be retaken until the application expires one year after filing. Links to the PSI Candidate Information Bulletin.
  9. TDLR - Air Conditioning and Refrigeration Contractors FAQs · Texas Department of Licensing and Regulation · Faq · verified September 15, 2026States that Texas reciprocates only with South Carolina and Georgia, that experience from states or municipalities with substantially equivalent licensing requirements is accepted, that anyone performing non-exempt air conditioning work must hold at least a technician registration, that 'there is no exam required' for technician registration ($20, one-page application, criminal background check), and that all work must be provided through a Texas-licensed ACR contractor holding the required liability insurance.
  10. TDLR - Air Conditioning and Refrigeration: Out of State Applicants · Texas Department of Licensing and Regulation · Agency Page · verified September 15, 2026Says Georgia and South Carolina have reciprocity agreements with Texas and that all other out-of-state or municipal licensees may apply with the standard contractor application, a $115 fee, a copy of the current license, a list of the requirements met to obtain it and its issue date; TDLR reviews whether the requirements were substantially equivalent and 'you may be required to complete some or all of the Texas requirements for licensure, including taking a licensing examination'. Also states the Class A/B definitions, endorsements and insurance minimums.
  11. TDLR - Air Conditioning and Refrigeration Contractors program · Texas Department of Licensing and Regulation · Agency Page · verified September 15, 2026Program home page. Lists the three credentials (Contractor License, Technician Registration, Certified Technician) and states that a company must employ an ACR contractor at each permanent location. Links to the out-of-state and reciprocity pages.
  12. TDLR - Air Conditioning and Refrigeration: Licensing Reciprocity · Texas Department of Licensing and Regulation · Agency Page · verified September 15, 2026Texas has ACR reciprocal licensing agreements with South Carolina and Georgia only. The out-of-state license must have been held for at least one year. Georgia Class II Conditioned Air (unrestricted) maps to Texas Class A Environmental Air; South Carolina Air Conditioning & Heating maps to Class A Environmental Air and Commercial Refrigeration, Air Conditioning only to Class A Commercial Refrigeration and Class B Environmental Air, Mechanical Contractor Refrigeration to Class A Commercial Refrigeration, and AC & Heating (packaged equipment) to Class B Environmental Air; South Carolina heating-only licenses do not qualify. Applicants submit a letter of good standing showing they passed the origin state's exam, the contractor application, a copy of the license, proof of insurance and the $115 fee; the license is valid one year. Notes that an exam may still be needed for a class or endorsement outside the mapped equivalency.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related