LicensebyState

Nebraska to Alaska: master HVAC technician license reciprocity

No credit· Start overVerified September 15, 2026· 8 sources

Nebraska does not issue a statewide master HVAC technician license, so there is nothing to transfer. Here is Alaska's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Mechanical Administrator license by credentials (all states)

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

Alaska publishes no state-by-state reciprocity list for mechanical administrators; every out-of-state applicant uses licensure by credentials under AS 08.40.270(b) and 12 AAC 39.022 (form 08-4904, also filed online through MY LICENSE). The department must waive the examination when the applicant holds a current, active mechanical administrator or equivalent license in another state (verification sent directly by every jurisdiction where the applicant is or was licensed), has that state verify on form 08-4904a, with the exam content outline, that the applicant passed an examination equivalent to Alaska's, and meets the experience qualifications for the category applied for (for example 12 AAC 39.242 for Unlimited HVAC/Sheet Metal or 12 AAC 39.262 for Unlimited Refrigeration). CBPL warns that passing an exam in another state does not guarantee qualification, and transcripts must come directly from the school if education is used to qualify. The fee is $150 (nonrefundable application) plus $200 (license), $350 in total, and paper applications take several weeks. An applicant who cannot document an equivalent exam applies by examination instead (form 08-4903) and must score at least 70% on the PSI mechanical administrator exam within the 12 months before licensure; a licensee may later add categories under 12 AAC 39.025 by passing that category's exam.

The division does not publish which states' HVAC contractor, master mechanical or refrigeration exams it accepts as equivalent; each is reviewed against the exam content outline. Whether a state HVAC contractor license that is issued to a business rather than a person counts as 'licensed as a mechanical administrator or the equivalent' is not addressed on any official page. The PSI examination fee for the by-examination route is not published on the application form. A journeyman-level HVAC license alone is not an administrator equivalent, but 12 AAC 39.992(4) counts an equivalent journeyman certificate from another jurisdiction toward the category experience requirement.

At a glance

Trade exam
Waived
Law / code exam
Not required
Out-of-state hours
Count toward eligibility

What you must already have

  • Your Nebraska license must be active and in good standing.
  • You must have passed a licensing exam in Nebraska that the destination considers comparable.
  • Meets the category qualifications in 12 AAC 39.222-39.332 (e.g. Unlimited HVAC/Sheet Metal: journeyman or field-superintendent experience in HVAC and sheet metal work for four of the last six years; Unlimited Refrigeration or Residential HVAC: journeyman experience for two of the last four years); a year of experience is at least 1,500 hours in 12 consecutive months
  • You must have no disciplinary action or unresolved complaints on your record.

What you'll do to get licensed in Alaska

  1. 1Application fee. Pay the application fee ($150). Nonrefundable application fee (12 AAC 02.245).
  2. 2License fee. Pay the license or certificate fee ($200). Biennial license fee; licenses expire December 31 of odd-numbered years (12 AAC 02.245).
  3. 3Other. Verification of licensure from every jurisdiction where the applicant holds or has held a mechanical administrator license, sent directly to the division; verification of the equivalent examination on form 08-4904a; official transcripts sent by the school if education is used to qualify.
  4. 4Other. EPA Section 608 technician certification (Type I/II/III/Universal) to handle refrigerants; federal, does not expire. Not an Alaska licensing prerequisite for the administrator license itself, but required of anyone who personally services refrigerant-containing equipment.
  5. 5Continuing education. Complete continuing education. For renewal: one eight-hour Uniform Mechanical Code workshop (or approved equivalent) per HVAC-related category each biennium (12 AAC 39.410); renewal fee $200.

Published fees on this path total $350, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Other

Continuing education

Renewals usually need approved CE hours, often on the latest NEC. Reciprocal licensees are rarely exempt.

  • Continuing education

How Alaska licenses master HVAC technicians

Alaska master HVAC technician · “Mechanical Administrator

Statewide license

Verified September 15, 2026· 8 sources

Issued by Alaska Department of Commerce, Community, and Economic Development - Division of Corporations, Business and Professional Licensing (Mechanical Administrators)

Alaska has no master HVAC license; its highest person-held HVAC credential is the Mechanical Administrator license issued under AS 08.40.210-08.40.490 by the Division of Corporations, Business and Professional Licensing (CBPL), which is treated here as the master level. It is a supervisory license: a person may not act as a mechanical administrator without it, every registered mechanical contractor must hold or employ one, and the administrator is responsible for all mechanical work done under the contractor's license (AS 08.40.260, 08.40.280; 12 AAC 39.902). The license is issued in categories; the HVAC-related ones are Unlimited HVAC/Sheet Metal (UHVCS), Residential HVAC (RHVC), Unlimited Refrigeration (UR), Heating, Cooling and Process Piping (HCPP) and Mechanical Systems Temperature Control (CNTL), with plumbing categories (UCIP, RPHH) alongside. Qualification is by experience (for example four of the last six years as a journeyman or field superintendent in HVAC and sheet metal work for UHVCS, or two of the last four years as a journeyman for UR and RHVC, where a year means at least 1,500 hours) plus a PSI-administered examination passed at 70% within the prior 12 months, or by credentials for administrators licensed in another state. Fees are $150 to apply plus $200 for the license ($350); the license is biennial, expiring December 31 of odd-numbered years, and renews for $200 with an eight-hour Uniform Mechanical Code workshop per category. The administrator license does not by itself let the holder install fuel gas piping (that needs a DOLWD Plumber Gas certificate) or original control wiring (that needs an Electrical Administrator), and anyone handling refrigerants needs federal EPA Section 608 certification.

Moving to AlaskaLeaving Alaska

Why Nebraska has nothing to transfer

Nebraska master HVAC technician

Licensed by cities and counties

Verified September 15, 2026· 16 sources

Nebraska does not issue a statewide master HVAC or mechanical contractor license; the state only requires contracting businesses to register with the Department of Labor under the Contractor Registration Act ($40 per year, no exam), and it licenses no construction trade at the state level except electricians. The master-level HVAC credential exists only at the city level: Omaha's Master Air Conditioning/Air Distribution (ACAD) contractor license, Lincoln's Mechanical Master Contractor license, Bellevue's master mechanical license and Grand Island's master mechanical license, each requiring the city's exam (Lincoln and Bellevue reference the ICC National Standard Master Mechanical exam) plus liability insurance and, in Omaha, a bond. An out-of-state master HVAC license carries no state-level recognition; Omaha waives its exam only for Bellevue and State of Iowa master ACAD licensees, and Lincoln allows any out-of-state master licensed by exam to sit its contractor exam without further qualifications. A contractor working in several cities must be licensed in each and registered with the Department of Labor.

How local licensing works in Nebraska

How local licensing works. Nebraska has no state HVAC license and no state mechanical board. The Contractor Registration Act (Neb. Rev. Stat. § 48-2104) requires every contractor to register with the Department of Labor before performing construction work ($40 per year from August 1, 2026, plus a workers' compensation certificate if there are employees); registration is not a license and involves no exam. Master and contractor licensing comes from each city's ordinance.

Omaha. The Master ACAD license (Omaha Municipal Code ch. 40, art. II) is the credential that lets a person contract for and pull permits for air conditioning and air distribution work. Applicants need eight or more years of verifiable experience installing ACAD systems, or four or more years employed by a licensed master after obtaining an Omaha (or equivalent) journeyman ACAD license (one year = 1,750 hours), must appear before the ACAD Board, and pass a Pearson Vue exam with 75% or greater. After passing they file a $10,000 surety bond and $300,000 liability insurance with the Planning Department. Fees: $81.00 application, $50 license plus $4.00 technology fee; renewal $160 plus $12.80 every two years (December 31 of odd years) with 8 hours of continuing education. Reciprocation: the board may waive the exam for a holder of a valid Bellevue, Nebraska or State of Iowa master ACAD contractor license with an exam score of 75% or greater (ACAD Reciprocation Application, $81.00). Sec. 40-40 of the code also allows licensees of comparable cities to apply without re-examination, but the city's page names only Bellevue and Iowa.

Lincoln. The Mechanical Master Contractor license requires holding a valid mechanical journeyman license for at least one year and passing the city master exam ($400 filing fee, given quarterly), which has four parts (ACCA Manual J, duct sizing, Lincoln Gas Code and Lincoln Adopted Amendments) plus the ICC National Standard Master Mechanical exam G29 taken at the applicant's cost. Annual registration is $350 (inactive master $50; a separate Refrigeration Master Contractor registration is $250) with 8 hours of continuing education, and the contractor must carry $500,000 per-occurrence general liability insurance naming the City of Lincoln as additional insured and register with the Department of Labor. Transfers: a holder of a valid contractor/master mechanical license obtained by examination in another state or municipality may take the Lincoln contractor exam without submitting additional qualifications; the exam is not waived.

Bellevue. Only a licensed mechanical master may contract for mechanical work in the city (Bellevue Municipal Code ch. 27, Division 2). Master applicants must submit a current journeyman license with its original issue date and state whether they have already passed the Thompson Prometric, ICC or Experior exam for the license applied for. Fee amounts could not be read from the city's scanned fee schedule.

Grand Island. Mechanical contracting companies must be licensed with the Building Services Division and their tradespersons individually licensed as master or journeyman; the CitizenServe portal offers applications to take the licensing exam or to apply for license reciprocity, but the accepted jurisdictions and fees are not published on the page.

Out-of-state holders. Apart from Omaha's recognition of Iowa master ACAD licenses, no Nebraska city publishes reciprocity with another state's HVAC license. A master arriving from another state should expect to sit the city exam (Lincoln) or present ICC National Standard Master Mechanical results where accepted, obtain the city's insurance and bond, license the business in each city where it will pull permits, and register with the Department of Labor. EPA Section 608 certification is federal and applies to anyone personally handling refrigerants.

Moving to NebraskaLeaving Nebraska

Common questions

Do I have to take the Alaska master HVAC technician exam if I'm licensed in Nebraska?
No. The trade exam is waived on this path.
What does it cost to get a Alaska master HVAC technician license from Nebraska?
Published fees on this path total $350, not counting exam vendor fees or bonds.
Do my Nebraska work hours count in Alaska?
Yes. Documented out-of-state experience counts toward Alaska's eligibility requirements.
Does it work the other way, from Alaska to Nebraska?
Not necessarily. Reciprocity is directed. Going from Alaska to Nebraska, the mechanism is not applicable.

Sources

  1. Alaska CBPL - Construction Contractors (Mechanical Contractors) · AS 08.18 · Alaska DCCED - Division of Corporations, Business and Professional Licensing · Agency Page · verified September 15, 2026Read from the Internet Archive capture of 2025-12-11 (live page returns a CAPTCHA). Verbatim: 'Mechanical contractors may perform any of the mechanical disciplines for which their Mechanical Administrator license allows (plumbing, heating, sheet metal, or refrigeration). A mechanical administrator license is required in addition to the Mechanical Contractors license in order to perform work. A Mechanical Contractor may hold the mechanical administrator license themselves as an additional license, or have an individual(s) assigned to their license who holds the Mechanical Administrator license.' Installation of mechanical controls requires both an Electrical Administrator and a Mechanical Administrator license.
  2. Alaska CBPL - Mechanical Administrators: License Applications and Forms · Alaska DCCED - Division of Corporations, Business and Professional Licensing · Agency Page · verified September 15, 2026Read from the Internet Archive capture of 2026-01-21 because the live page returns a CAPTCHA. Lists online applications for Mechanical Administrator by Examination and by Credentials (filed through MyAlaska/MY LICENSE) and the paper forms: #08-4903 by Examination (new 08/30/2024), #08-4904 by Credentials (new 08/30/2024), #08-4905 Additional Category, #08-4296 Renewal (revised 10/23/2025), #08-4902 Change of Employer/Affiliation.
  3. Form 08-4904 - Mechanical Administrator by Credentials License Application (new 08/30/2024) · 12 AAC 39.022; 12 AAC 02.245 · Alaska DCCED - Division of Corporations, Business and Professional Licensing · Form · verified September 15, 2026Downloaded directly (PDF). Fees: $150 nonrefundable application fee plus $200 license fee, $350 total. Requires verification of licensure sent directly to the division from EVERY jurisdiction where the applicant holds or has held a mechanical administrator license (primary-source web verification accepted), verification of an equivalent examination passed in another state on form 08-4904a sent directly by that state with the exam content outline, and official transcripts if education is used to qualify. Warns: 'passing an exam in another state does not guarantee qualification of an applicant for an Alaska license.' Licenses are biennial and expire December 31 of odd-numbered years; an administrator must be assigned to one licensed contractor (or held unassigned); paper processing 'can take several weeks'; documents older than 12 months are stale.
  4. Form 08-4903 - Mechanical Administrator by Examination License Application (new 08/30/2024) · 12 AAC 39.012; 12 AAC 02.245 · Alaska DCCED - Division of Corporations, Business and Professional Licensing · Form · verified September 15, 2026Downloaded directly (PDF). Same $150 + $200 = $350 fees. Requires verification of a score of at least 70 percent, within the 12 months before application, on the administrator examination administered by PSI Services (the instruction sheet says 'electrical administrator examination', an apparent copy error on the mechanical form); results are valid one year; scheduling and the Candidate Information Bulletin are through PSI. The PSI exam fee is not stated on the form.
  5. Alaska CBPL - Mechanical Administrators program page · Alaska DCCED - Division of Corporations, Business and Professional Licensing · Agency Page · verified September 15, 2026commerce.alaska.gov HTML pages block automated fetches (CAPTCHA, also through the r.jina.ai proxy); this page was read from the Internet Archive capture of 2026-01-21. States that the division staffs the mechanical administrator program, the department adopts regulations and makes licensing decisions, and that plumbers are regulated by the Department of Labor's Mechanical Inspection Section. Lists the seven regulated categories: Heating, Cooling, and Process Piping (HCPP); Mechanical Systems Temperature Control (CNTL); Residential HVAC (RHVC); Residential Plumbing and Hydronic Heating (RPHH); Unlimited Commercial and Industrial Plumbing (UCIP); Unlimited HVAC/Sheet Metal (UHVCS); Unlimited Refrigeration (UR).
  6. Form 08-4296 - Mechanical Administrator License Renewal, January 1, 2026 - December 31, 2027 (rev. 10/23/2025) · 12 AAC 39.027; 12 AAC 39.410 · Alaska DCCED - Division of Corporations, Business and Professional Licensing · Form · verified September 15, 2026Downloaded directly (PDF). Biennial renewal fee $200 ($100 prorated for licenses first issued on or after January 1, 2025); no grace period; licensee certifies completion of the Article 3 continuing education or passing a code-based licensing exam during the period.
  7. Statutes and Regulations - Mechanical Administrators (AS 08.40.210-08.40.490 and 12 AAC 39), April 2023 · AS 08.40.260, AS 08.40.270(b), AS 08.40.280, AS 08.40.290; 12 AAC 39.012, 12 AAC 39.022, 12 AAC 39.025, 12 AAC 39.222-39.332, 12 AAC 39.410, 12 AAC 39.950, 12 AAC 39.992 · Alaska DCCED - Division of Corporations, Business and Professional Licensing · Statute · verified September 15, 2026The PDF downloads directly from commerce.alaska.gov (only the HTML pages are behind a CAPTCHA); text was extracted locally. AS 08.40.260: a person may not act as a mechanical administrator without a license and may work only in a licensed category. AS 08.40.270(b): if an applicant proves licensure as a mechanical administrator or the equivalent by another state or territory, meets the department's category qualifications and passed an equivalent examination, the department SHALL waive the whole examination. AS 08.40.280: an administrator may qualify only one registered contractor (except in communities with fewer than three administrators). 12 AAC 39.012: licensure by examination requires a score of at least 70 percent within the 12 months before applying. 12 AAC 39.022: licensure by credentials requires verification of a current, active license sent directly by the other state and verification of an equivalent examination passed in another state. Category qualifications: Unlimited HVAC/Sheet Metal (12 AAC 39.242) and Heating, Cooling and Process Piping (39.222) need journeyman or field-superintendent experience for four of the six years before application (or an ME degree plus one of three years, or PE registration plus one year); Unlimited Refrigeration (39.262), Mechanical Systems Temperature Control (39.282) and Residential HVAC (39.322) need two of the four preceding years as a journeyman (or an accredited refrigeration/controls program). 12 AAC 39.950: a year of experience is at least 1,500 hours in 12 consecutive months. 12 AAC 39.992(4): 'journeyman' means a holder of an AS 18.62 certificate of fitness or an equivalent certificate from another licensing jurisdiction. 12 AAC 39.410: renewal requires one eight-hour Uniform Mechanical Code workshop (per category), or having passed a code-based exam during the period.
  8. EPA Section 608 Technician Certification Requirements · 40 CFR Part 82, Subpart F (Clean Air Act §608) · U.S. Environmental Protection Agency · Other · verified September 15, 2026Federal requirement in every state: technicians who maintain, service, repair or dispose of equipment that could release refrigerants into the atmosphere must be certified (Type I small appliances, Type II high-pressure, Type III low-pressure, Universal). Apprentices under direct supervision are exempt. Certification does not expire; the core exam must be proctored for Universal certification. State HVAC boards commonly require it before licensure, but it is not itself a state license.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related