Illinois does not issue a statewide general contractor license, so there is nothing to transfer. Here is South Carolina's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Qualifying party certification by NASCLA examination or by South Carolina examination (states without a waiver agreement)

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

South Carolina accepts the NASCLA Accredited Examination for Commercial General Building Contractors in place of its own building technical examination. The Board is a participating agency in the NASCLA program, its Technical Exam Waiver Agreements chart maps the NASCLA Commercial General Building Contractors exam to the South Carolina Unlimited Building classification, and it says it accepts all states administering that exam; the candidate has NASCLA send the transcript directly to the Board. NASCLA does not waive the South Carolina Business Management & Law for Commercial Contractors examination, which every qualifying party must pass. An applicant without the NASCLA credential sits the South Carolina Limited Building or Unlimited Building technical examination through PSI instead. On either route the qualifying party files Doc. 168 with at least two years of full-time work experience performed within the past five years in the classification applied for, primarily commercial, documented on the Work Experience Affidavit (Doc. 167); experience earned in other states counts. The business then files Doc. 165 with the $350 licensure fee, its Secretary of State verification and a financial statement or surety bond for the group limit it wants.

S.C. Code Section 40-11-290 also allows the Board to exempt the technical examination for an applicant who can verify passing an examination in another state that is essentially the same as South Carolina’s, even without a reciprocal agreement, but the Board publishes no separate procedure for that outside the Technical Exam Waiver Agreements list and the NASCLA route. The examination score needed is 70 percent, an individual may sit a given examination twice in a twelve-month period and once every six months after that, and a certification left inactive four or more years has to be re-examined. Successful completion of a PHCC Academy of North Carolina apprenticeship is listed on Doc. 168 as an alternative to the two-year work experience affidavit. The Board publishes no processing time and no PSI fee amounts; contact it at [email protected] or (803) 896-4686.

At a glance

Trade exam
Waived
Law / code exam
Required
Out-of-state hours
Count toward eligibility

What you must already have

  • You must have passed a licensing exam in Illinois that the destination considers comparable.The Board’s licensure page lists "NASCLA: Contact NASCLA to have your transcripts sent directly to the Board" as a method of qualifying by examination, its NASCLA program handout states that the Board "is a participating state agency in administering the National Commercial Building Contractor exam, and the NASCLA Accredited Trade Examination for Electrical Contractors through the testing provider, PSI Exams", and the Technical Exam Waiver Agreements chart maps the NASCLA Commercial General Building Contractors exam to the Unlimited Building classification while accepting all states that administer it. The NASCLA exam is an examination credential rather than a license or a state-to-state agreement, so any candidate may sit it in any participating jurisdiction. It does not waive the South Carolina Business Management & Law for Commercial Contractors examination, the work experience requirement, the licensure fee or the financial responsibility requirement.
  • At least two years of full-time work experience performed within the past five years in the license classification or subclassification applied for, primarily commercial. Experience earned in other states counts and is documented on the Work Experience Affidavit (Doc. 167) by former or current employers.S.C. Code Section 40-11-230(B)(2) states the requirement for designation as a primary qualifying party and allows the Board to accept other proof of employment experience. Doc. 168 also accepts a Certificate of Achievement from a PHCC Academy of North Carolina apprenticeship in Heating, Air Conditioning and Plumbing in place of the affidavit, which matters for mechanical rather than building classifications.
  • The primary qualifying party must serve in a management capacity for the licensee, be actively involved in its management, supervision and operations, and may not take other employment that conflicts with those duties (S.C. Code Section 40-11-230(B)(3)).

What you'll do to get licensed in South Carolina

  1. 1Trade exam. Pass the destination's trade exam (if applicable). South Carolina Limited Building or Unlimited Building technical examination through PSI, registered at https://test-takers.psiexams.com/sccon. It is required unless the qualifying party brings the NASCLA Accredited Examination for Commercial General Building Contractors or an accepted examination from a jurisdiction on the Technical Exam Waiver Agreements list. The limited building contractor examination or the unlimited general contractor examination qualifies a Group 1, 2 or 3 license and the unlimited examination is required for Groups 4 and 5; structures built under a limited building examination are restricted to three stories in height..
  2. 2Law / code exam. Pass a law, rules, or code exam. South Carolina Business Management & Law for Commercial Contractors examination, administered by PSI. Every individual must pass it before the Board will certify them as a qualifying party, no matter which route they use to satisfy the technical examination. Register at https://test-takers.psiexams.com/sccon. S.C. Code Section 40-11-230 requires a grade of 70 percent or better, and an individual may sit a given examination only twice in a twelve-month period and once every six months after that..
  3. 3Exam fee. Pay the exam fee. PSI examination fees are paid directly to PSI when the examination is scheduled. The Board does not publish the amounts; the current fees are in PSI’s South Carolina candidate information bulletin at https://test-takers.psiexams.com/sccon, or call PSI at (855) 746-8173..
  4. 4License fee. Pay the license or certificate fee ($350). Non-refundable $350 licensure fee, paid by check or money order to SCCLB with the General and Mechanical Contractor Application for Licensure (Doc. 165). No cash is accepted and a returned-check fee of up to $30 may be charged. General Contractor licenses expire on October 31 in even-numbered years..
  5. 5Financial responsibility. Show financial responsibility of at least $10,000. Financial statement for the entity that will hold the license, sized by the license group it wants, with a balance sheet dated no more than twelve months before the application. For General Contractors the groups are: Group 1, bids and jobs up to $100,000, working capital $10,000 or net worth $20,000; Group 2, up to $400,000, $40,000 or $60,000; Group 3, up to $1,000,000, $100,000 or $150,000; Group 4, up to $3,000,000, $175,000 or $250,000; Group 5, unlimited, $250,000 or $350,000. Only one of working capital or net worth has to be met. Groups 1 and 2 may file the owner-prepared statement with an affidavit of accuracy (Doc. 172); Groups 3 and 4 need a statement compiled by a licensed CPA in accordance with GAAP; Group 5 needs an audited balance sheet from a licensed CPA. The figure shown is the Group 1 working capital minimum (S.C. Code Section 40-11-260)..
  6. 6Surety bond. Post a surety bond ($20,000) (if applicable). Optional alternative to the financial statement under S.C. Code Section 40-11-262: a surety bond in the same amount as the net worth required for the license group, so $20,000 for Group 1, $60,000 for Group 2, $150,000 for Group 3, $250,000 for Group 4 and $350,000 for Group 5. The surety must be authorized to transact surety business in South Carolina, the bond is continuous, lists the State of South Carolina as obligee, and stays in force until the licensee files a financial statement meeting its group. The original must carry the surety’s signature, the principal’s signature, a visible surety company seal and the attached power of attorney; DocuSign is not accepted, and a bond payable to the Residential Builders Commission is not accepted by this Board. The figure shown is the Group 1 bond..
  7. 7Business license. Obtain a business license. The license is issued to the business, so the entity must be able to conduct business in South Carolina. Attach a Certificate of Existence (or Good Standing) from the SC Secretary of State if the company was incorporated in South Carolina, or a Certificate of Authority if it was incorporated in another state, together with the articles of incorporation or organization and documentation of each owner’s percentage. This is not required for a sole proprietorship..
  8. 8Other. Primary Qualifying Party / Qualifying Party Initial Application (Doc. 168) for each qualifying party who is not already certified or has been inactive more than four years, with a copy of a driver’s license, state-issued ID, passport or military ID, a copy of the Social Security card, a notarized Verification of Lawful Presence form, the PQP/QP Company Acknowledgement Affidavit (Doc. 190), examination score sheets, and official license verifications from every other state where you are or have been licensed..

Published fees on this path total $350, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam · if applicable
  • Law / code exam
  • Exam fee

Surety bond

A license or contractor bond is bought from a surety, not the state. Price is a small percentage of the bond amount and depends on your credit.

  • Surety bond · $20,000 · if applicable

Business registration

If you plan to contract in your own name, budget for a business license or entity registration on top of the trade license.

  • Business license

How South Carolina licenses general contractors

South Carolina general contractor · “General Contractor license, Building classification (Limited Building or Unlimited Building), Group 1-5

Statewide license

Verified September 17, 2026· 5 sources

Issued by South Carolina Contractor’s Licensing Board (SC LLR)

Commercial and unlimited building work in South Carolina runs through the Contractor’s Licensing Board, which licenses General Contractors for any general contracting where the total cost of construction is more than $10,000. The license belongs to the business, not to the person: an individual, corporation, LLC or partnership holds it and must designate a Primary Qualifying Party for each classification, an individual in a management role who personally passes the examinations, so an inbound contractor applies as or for the entity that will sign contracts and pull permits. The Building classification covers commercial, industrial, institutional, modular and all other building construction including residential structures, and carries the Wood Frame Structures, Nonstructural Renovation, Masonry, Pre-engineered Metal Buildings, Roofing, Structural Framing and Miscellaneous Metals subclassifications. Every license also carries a group limit driven by money rather than skill: Group 1 bids and jobs up to $100,000 through to Group 5 with no cap, each set by working capital, net worth or a surety bond. The qualifying party for a Group 1, 2 or 3 license passes either the limited building contractor examination or the unlimited general contractor examination, while Groups 4 and 5 require the unlimited examination, and structures built under a limited building examination are restricted to three stories.

Moving to South CarolinaLeaving South Carolina

Why Illinois has nothing to transfer

Illinois general contractor · “No statewide license; local titles include Chicago General Contractor Class A, B or C

Licensed by cities and counties

Verified September 17, 2026· 18 sources

Illinois has no statewide general, commercial or building contractor license and no state board that examines or qualifies builders, so an out-of-state general contractor license has nothing at the state level to transfer into. The State does license pieces of the work: the Department of Financial and Professional Regulation licenses roofing contractors under the Illinois Roofing Industry Licensing Act, in a limited tier for residential buildings of eight units or less and an unlimited tier for residential, commercial and industrial roofs, and also licenses architects, professional and structural engineers, land surveyors and alarm contractors, while the Department of Public Health licenses plumbers, plumbing contractors and irrigation contractors and separate state programs cover elevator and fire sprinkler contractors. Commercial building itself is controlled by home rule municipalities through the building permit, and the City of Chicago's General Contractor license, graded Class A through E by project value, is by far the most consequential credential in the state. A general contractor arriving in Illinois gets licensed or registered in each jurisdiction where they will pull permits, carries the insurance and bonds those jurisdictions require, and makes sure the roofing, plumbing, electrical and mechanical scopes are performed under the correct state or municipal trade licenses.

How local licensing works in Illinois

How it works in Illinois. No Illinois agency issues a general, commercial, building or unlimited contractor license, and there is no Illinois qualifying party or state business-and-law exam for general building work. Home rule municipalities control commercial construction through the permit, and each one writes its own contractor ordinance, so a contractor is licensed or registered separately in every jurisdiction where they build. Where a city does license, the credential is generally based on insurance, financial solvency, entity documents and a fee rather than on a competence exam, and none of the programs reviewed recognizes a general contractor license issued by another state. What genuinely travels into Illinois is a state trade license: roofing under 225 ILCS 335, plumbing under the Department of Public Health, and the state elevator, fire sprinkler and alarm credentials, all of which cities check before they issue a permit.

Chicago. Chicago's General Contractor license is the one credential that shapes commercial work in Illinois. It is required to bid on, undertake, hire or supervise, or control the means and methods of any 'regulated activity' - work requiring a building, sign or demolition (wrecking) permit, a sewer permit, a Department of Public Health permit for sandblasting, grinding or chemical washing, work exempt from permit under Section 402 of the Chicago Construction Codes Administrative Provisions, or work under a stormwater management plan. Licenses go to businesses, including sole proprietorships, in five classes graded by project value, defined as 'the fair market value of materials and labor provided by all contractors and subcontractors as part of all concurrent and consecutive regulated activities at the same site': Class A unlimited value, ordinary or complex demolition, $5 million per occurrence of insurance, $3,500.00; Class B up to $20 million, ordinary or complex demolition, $3 million, $1,800.00; Class C up to $10 million, ordinary demolition, $2 million, $1,300.00; Class D up to $4 million, ordinary demolition, $2 million, $900.00; Class E up to $500,000, no demolition, $1 million, $300.00. The Class B, C and D project limits and the Class C and D insurance figures took effect January 1, 2026, and for Class C and D licenses issued before that date the higher insurance requirement is enforced when the policy on file expires. Commercial general liability must come from an insurer authorized in Illinois and rated B+ or higher by A.M. Best, covering bodily injury, personal injury, property damage and completed operations, with primary plus excess or umbrella policies allowed above $1 million; the full requirements are in Section 4-36-090 of the Municipal Code. The application also needs a statement of financial solvency on the supplied form, proof of authority to do business in Illinois, an Assumed Name Certificate where a trade name is used, and government photo identification for the controlling persons. There is no exam, no experience review and no qualifying party. Continental Testing Services handles applications and renewals by mail for the Department of Buildings; the license is valid one year and is automatically inactivated if the insurance policy lapses. A licensed general contractor's own employees and subcontractors under its supervision and control do not need their own general contractor license, but electrical, plumbing, mason, drain layer, elevator mechanic and board-up work must be done by the holders of those separate City licenses, and anyone contracting directly with the owner needs their own license and must be listed on the permit.

Cook County (unincorporated areas). Every contractor working in unincorporated Cook County registers with the Department of Building and Zoning: $150 per trade to start and $75 per trade annually by December 31, with $1,000,000 general liability naming Cook County Building and Zoning at 69 W. Washington, Suite 2830, Chicago as certificate holder. The owner or a corporate officer files, with the Articles of Incorporation or current Annual Domestic Report. Roofing registrants file the State of Illinois roofing license and demolition registrants a fully approved bond. No exam. Check the site against the county's CookViewer tool first, because much of suburban Cook County is incorporated and licensed by its own village.

Aurora. A General contractor registration costs $200 and consists of the Contractor Licensing Application, a certificate of insurance naming the City of Aurora as primary and non-contributory additional insured with $1,000,000 general aggregate and $500,000 per occurrence, statutory workers' compensation, and Secretary of State registration or a county DBA certificate. Aurora tests only electrical and mechanical contractors, accepting ICC certifications or licenses from named municipalities in place of its own exam; the General category has no test. Elevator, fire suppression, roofing and sign registrations are also $200, and a dumpster or right-of-way obstruction registration needs a $5,000 surety bond. Delinquent permits will block a renewal.

Evanston. General Contractor registration is $150 a year, renewable through the Citizen Portal, with general liability of at least $300,000 per occurrence, bodily injury and property damage of at least $100,000 per occurrence each, and workers' compensation at statutory minimums naming Evanston as certificate holder. Right-of-way work requires $1,000,000 per occurrence with the city as an additional insured. State-regulated contractors submit a copy of the state license. Trade registration is $125.

Joliet. Registration is required before any permit is issued but costs nothing: 'there are no forms or fees for registration, unless you are a Sign Erector or for HVAC Testing.' The requirement is a certificate of insurance naming the City of Joliet, with minimum limits of $250,000 bodily injury per person, $500,000 bodily injury per occurrence and $250,000 property damage per occurrence. Trade credentials are checked separately: the Illinois State Roofer's License for roofing, the Illinois Plumbing Contractor Registration for plumbing, the State of Illinois elevator license, the Illinois sprinkler (FSC) and private alarm licenses, and a municipal electrical or HVAC license from Joliet's accepted list. Concrete work in the right-of-way needs a $10,000 street obstruction bond and demolition a $50,000 wrecking bond. Electrical, plumbing and HVAC contractors file a project-specific Letter of Intent, and all subcontractors must be listed on the permit application.

Rockford. 'General contractors are not required to be licensed.' Rockford controls commercial work through the permit only, and enforces the State roofing license: 'roofing contractors are required to obtain a license from the State of Illinois Department of Professional Regulation.'

Springfield. The Building and Zoning Department publishes electrical and mechanical contractor license and registration applications and no general contractor registration at all; its building permit application asks for the general contractor's name and address but for a license number only on the roofing line. Building and Zoning, 300 South 7th Street, Room 304, (217) 789-2171.

Peoria. Peoria licenses electrical and HVAC contractors individually at $150.00 each, on an open-book ICC exam or a Normal or Pekin license, plus boiler tenders and stationary engineers. Its four Contractor Business Licenses cover parking lot paving, sidewalks and driveways, right-of-way dumpsters and sewer connections, at $25.00 or $60.00 a year with $5,000 or $10,000 license and permit bonds. There is no general building contractor license.

Everywhere else. Every other Illinois city, village and county sets its own rules; many suburban villages register contractors and charge an annual fee, while others require only a permit and proof of insurance. Confirm the requirement, the current fee and the insurance limits with each building department before you bid work there.

Moving to IllinoisLeaving Illinois

Common questions

Do I have to take the South Carolina general contractor exam if I'm licensed in Illinois?
The trade exam is waived, but South Carolina requires a law or code exam.
What does it cost to get a South Carolina general contractor license from Illinois?
Published fees on this path total $350, not counting exam vendor fees or bonds.
Do my Illinois work hours count in South Carolina?
Yes. Documented out-of-state experience counts toward South Carolina's eligibility requirements.
Does it work the other way, from South Carolina to Illinois?
Not necessarily. Reciprocity is directed. Going from South Carolina to Illinois, the mechanism is not applicable.

Sources

  1. NASCLA Accredited Examination for Commercial General Building Contractors · National Association of State Contractors Licensing Agencies · Other · verified September 17, 2026
  2. S.C. Code of Laws Title 40, Chapter 11 - Contractors · S.C. Code Ann. Sections 40-11-30, 40-11-230, 40-11-260, 40-11-262, 40-11-290, 40-11-410 · South Carolina Legislature · Statute · verified September 17, 2026
  3. General and Mechanical Contractor Application for Licensure and Instructions (Doc. 165, 12/22/2025 v2.2) · South Carolina Department of Labor, Licensing and Regulation (LLR) · Form · verified September 17, 2026
  4. General and Mechanical Contractors - Primary Qualifying Party (PQP) and Qualifying Party (QP) Initial Application (Doc. 168, 12/19/2025 v2.1) · South Carolina Department of Labor, Licensing and Regulation (LLR) · Form · verified September 17, 2026
  5. SC Contractor’s Licensing Board - Licensure with the Board (application, qualifying parties, exams, group limits, financial statements, bonds) · South Carolina Department of Labor, Licensing and Regulation (LLR) · Agency Page · verified September 17, 2026
  6. SC Contractor’s Licensing Board - NASCLA Accredited Examination Program (board handout) · South Carolina Department of Labor, Licensing and Regulation (LLR) · Agency Page · verified September 17, 2026
  7. SC Contractor’s Licensing Board - Technical Exam Waiver Agreements (as of May 2026, Revised 5/2026) · South Carolina Department of Labor, Licensing and Regulation (LLR) · Agreement Document · verified September 17, 2026

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related