Illinois to Washington: journeyman electrician license reciprocity
Illinois does not issue a statewide journeyman electrician license, so there is nothing to transfer. Here is Washington's standard path for out-of-state applicants.
Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.
Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.
Examination with credit for out-of-state certificate or experience (all states except Oregon)
Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.
An electrician from any state other than Oregon applies to take the Washington journey level (01) exam using the Out-of-State Application for Electrical Examination. Eligibility is met with an out-of-state journey level certificate obtained through examination by a jurisdiction requiring at least 8,000 hours of supervised experience (with at least 4,000 hours in new commercial or industrial work), or with at least 16,000 hours of out-of-state electrical construction experience (4,000 in new commercial or industrial installations). Experience is documented with notarized letters from licensed electrical contractors, apprenticeship training directors or employers. After L&I approves the application the applicant schedules the open-book exam with PSI; the minimum passing score is 70 percent on each section.
The Washington journey level exam is a single open-book exam that permits use of RCW 19.28 and WAC 296-46B; no separate law exam is published. The $80.30 exam fee applies when the department administers the exam; exams scheduled through PSI are paid to PSI at PSI's rate, which is not published in the WAC.
At a glance
- Trade exam
- Required
- Law / code exam
- Not required
- Out-of-state hours
- Count toward eligibility
What you must already have
- Out-of-state journey level electrician certificate obtained through examination by a state licensing jurisdiction requiring at least 8,000 hours of supervised experience (at least 4,000 hours in new commercial or industrial installations), OR at least 16,000 hours of out-of-state experience in the electrical construction trade (at least 4,000 hours in new commercial or industrial installations)
What you'll do to get licensed in Washington
- 1Application fee. Pay the application fee ($114.60). Journey level electrician application fee (includes original certificate and application processing).
- 2Trade exam. Pass the destination's trade exam. Washington General Journey Level Electrician (01) exam, open book, minimum score 70 percent; scheduled with PSI after L&I approval.
- 3Exam fee. Pay the exam fee ($80.30). Journey level examination fee when administered by the department (first test or retest); PSI-administered exams are paid to PSI.
Published fees on this path total $194.90, excluding exam-vendor fees, bonds, and insurance.
What you'll need to buy or arrange
Exam preparation
Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.
- Trade exam
- Exam fee · $80.30
How Washington licenses journeyman electricians
Washington journeyman electrician · “General Journey Level Electrician (01)”
Statewide license
Issued by Washington State Department of Labor & Industries, Electrical Program
Washington issues a statewide General Journey Level Electrician (01) certificate of competency through the Department of Labor & Industries. An out-of-state electrician can qualify to sit the Washington journey level exam with an out-of-state journey level certificate obtained by examination in a jurisdiction requiring at least 8,000 supervised hours, or with 16,000 hours of documented out-of-state experience; the exam is open book and requires a 70 percent score. Washington's only electrician reciprocity agreement is with Oregon: holders of an Oregon General Journeyman (J) or General Supervising (S) license obtained by Oregon examination can receive the 01 certificate without taking the Washington exam. Certificates renew every three years on the holder's birthdate and require 24 hours of continuing education.
Why Illinois has nothing to transfer
Illinois journeyman electrician
Licensed by cities and counties
Illinois does not issue a statewide journeyman electrician license; the Illinois Department of Financial and Professional Regulation does not license electricians at any level, and state law only authorizes municipalities to register electrical contractors. Licensing of individual electricians is done, where it exists, by cities and counties under their own ordinances, and requirements vary by jurisdiction. In the largest jurisdictions the individual credential is a supervising or master-level license (Chicago's Supervising Electrician, Springfield's Electrical License based on the ICC Master Electrician exam) rather than a journeyman card, and non-supervising electricians work as employees under that licensed person or contractor. An out-of-state journeyman license has no state-level recognition in Illinois; a journeyman must check the rules of each municipality where they will work and apply locally if that municipality licenses individuals.
How local licensing works in Illinois
How local licensing works. Illinois has no state electrician license and no state electrical board. The Illinois Municipal Code (65 ILCS 5/11-33-1) allows each municipality to require registration of electrical contractors, with an annual fee of $25, and provides that a contractor registered in one municipality cannot be required to register or pay a fee in another. Anything beyond registration (examinations, experience requirements, supervising or master licenses) comes from each city's or county's own ordinance. Employees of an electrical contractor are expressly excluded from the statutory definition of 'electrical contractor', so state law does not require any personal license for a journeyman-level worker.
Chicago. The Department of Buildings licenses Supervising Electricians (individuals) and Electrical Contractors (businesses). There is no Chicago journeyman license. The supervising electrician exam requires age 21 and at least 2 years of experience under a supervising electrician or equivalent, verified by supervisor letters; general and low-voltage exams are offered through Continental Testing Services (2026 fees: $150 exam, $150 initial license, $150 annual renewal). For 'Class 1' work (buildings over 55 feet or large assembly occupancies before a certificate of occupancy), every worker must be a licensed supervising electrician or have completed or be enrolled in a U.S. Department of Labor-recognized apprenticeship of at least 8,000 hours; this apprenticeship standard is the closest thing Chicago has to a journeyman qualification. All other work is done by employees under the contractor's supervising electrician. Chicago's pages do not describe any reciprocity or endorsement for out-of-state licenses.
Springfield. The Building and Zoning Department issues an Electrical License to individuals who document 5 years of electrical experience (2 supervisory) and pass the ICC National Standard Master Electrician exam (W16); the Springfield Electrical Commission approves applications and the fee is $25. A limited grandfather clause applies to licenses from other Illinois or out-of-state municipalities with reciprocal testing that were issued before 10/10/2007; otherwise the ICC exam is required. Contractors performing work in the city must also register.
Peoria. Electrical licenses are issued to individuals, not businesses ($150 annual). Holders of Normal or Pekin licenses may register without testing; everyone else must submit an ICC contractor exam certificate (2017 code cycle or newer).
Rockford. Electrical contractors are not licensed, only registered ($25 per calendar year, or free with proof of current registration or license in another Illinois municipality).
Naperville and Aurora. Both accept current ICC certifications (Standard Master Electrician for commercial, Standard Residential Electrician for residential) or a license from a listed testing municipality in lieu of local testing; Naperville stopped issuing its own electrical licenses after 2022 and now registers electrical contractors. Insurance naming the city is required.
Elgin. Requires a contractor's license from any Illinois city that gives a written NEC-based examination, or Elgin's own exam administered through CLEC Enterprises.
Unincorporated Cook County. Electrical contractors must register ($150 initial, $75 annual renewal per trade), provide $1,000,000 general liability insurance, and submit a supervising electrician's license from an Illinois city, town or village that has an electrical commission administering an examination.
Out-of-state holders. None of these jurisdictions publish a reciprocity or endorsement path for licenses from other states. In practice the portable credentials inside Illinois are the ICC National Standard Master/Residential Electrician exams and licenses from testing municipalities such as Chicago; an electrician arriving from another state should expect to take the ICC exam or the local exam and apply separately in each municipality that licenses individuals.
Common questions
- Do I have to take the Washington journeyman electrician exam if I'm licensed in Illinois?
- Yes. Washington requires the trade exam on this path.
- What does it cost to get a Washington journeyman electrician license from Illinois?
- Published fees on this path total $194.90, not counting exam vendor fees or bonds.
- Do my Illinois work hours count in Washington?
- Yes. Documented out-of-state experience counts toward Washington's eligibility requirements.
- Does it work the other way, from Washington to Illinois?
- Not necessarily. Reciprocity is directed. Going from Washington to Illinois, the mechanism is not applicable.
Sources
- L&I - Electrician certification (journey level and specialty) · Washington State Department of Labor & Industries · Agency Page · verified September 14, 20268,000 hours (no more than 4,000 in 4,000-hour specialties) and 96 hours basic classroom instruction; out-of-state and military experience accepted via the Out-of-State Application for Electrical Examination (F626-009-000); exams scheduled with PSI after L&I approval; renewal every three years with 24 CE hours. Contains the 'Reciprocal agreement with Oregon' section.
- Application for a Reciprocal (01) General Journey Level Electrician Certificate (F500-148-000) · Washington State Department of Labor & Industries · Form · verified September 14, 2026States that Washington is party to a reciprocal agreement with Oregon and no other states, that a license not obtained through Oregon examination cannot be reciprocated, and that Washington master certificates cannot be obtained through reciprocity. PDF text was read through the search index; the file itself did not extract in this session.
- RCW 19.28.191 - Application for certificate of competency - Qualifications - Examination · RCW 19.28.191 · Washington State Legislature · Statute · verified September 14, 2026(1)(a): to take the master journey level exam the applicant must have possessed a valid journey level electrician certificate of competency for four years. (1)(c): journey level exam eligibility via 8,000-hour apprenticeship, an out-of-state journey level certificate obtained through examination in a jurisdiction requiring at least 8,000 supervised hours, 16,000 hours of out-of-state experience, or 8,000 hours in armed forces construction battalions.
- WAC 296-46B-909 - Electrical/telecommunications fees · WAC 296-46B-909 · Washington State Legislature · Admin Rule · verified September 14, 2026Fee table filed 5/5/26, effective 7/1/26. Journey level, specialty, or reciprocal electrician application (includes original certificate and processing) $114.60; journey level exam fee when administered by the department $80.30; master electrician exam application $204.60; master first-time exam fee $106.70, retest $125.00.
- WAC 296-46B-945 - Qualifying for master, journey level, specialty electrician examinations · WAC 296-46B-945 · Washington State Legislature · Admin Rule · verified September 14, 2026Journey level exam pathways include an out-of-state journey level certificate obtained by examination in a jurisdiction requiring 8,000 supervised hours (4,000 in new commercial/industrial), or 16,000 hours of out-of-state experience; documentation by notarized letters from licensed contractors, apprenticeship directors or employers. States: 'No credit may be applied from out-of-state toward qualifying for a master electrician certificate of competency examination.'
- WAC 296-46B-960 - Administrator and electrician certificate of competency examinations · WAC 296-46B-960 · Washington State Legislature · Admin Rule · verified September 14, 2026Open-book exam; minimum passing score 70 percent on any exam or section; two-week wait after a failure, three-month wait after three failures in a year; exam must be completed within one year of approval.
Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.