LicensebyState

Illinois to Washington: master electrician license reciprocity

No credit· Start overVerified September 14, 2026· 6 sources

Illinois does not issue a statewide master electrician license, so there is nothing to transfer. Here is Washington's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

No out-of-state credit toward the master certificate

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

An out-of-state master or journeyman license gives no advantage toward the Washington Master Electrician (01) certificate. RCW 19.28.191(1)(a) requires four years holding a valid journey level certificate, L&I's master electrician page requires four years certified as a general journey level electrician with L&I, and WAC 296-46B-945 states that no credit may be applied from out-of-state toward qualifying for the master examination. The applicant must first obtain the Washington journey level (01) certificate (by exam, or by reciprocity from Oregon), hold it for four years, and then apply for and pass the master exam, which is scheduled with PSI after L&I approval.

Fees listed are what the applicant pays once eligible after four years as a Washington journey level electrician. The $106.70 first-time master exam fee applies when the department administers the exam; PSI-administered exams are paid to PSI at PSI's rate.

At a glance

Trade exam
Required
Law / code exam
Not required
Out-of-state hours
Do not count

What you must already have

  • You must have held your Illinois license for at least 4 years.

What you'll do to get licensed in Washington

  1. 1Application fee. Pay the application fee ($204.60). Master electrician exam application fee (includes original certificate and application processing).
  2. 2Trade exam. Pass the destination's trade exam. Washington Master Electrician (01) exam, open book, minimum score 70 percent; scheduled with PSI after L&I approval.
  3. 3Exam fee. Pay the exam fee ($106.70). Master electrician first-time examination fee when administered by the department (retest $125.00); PSI-administered exams are paid to PSI.

Published fees on this path total $311.30, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Trade exam
  • Exam fee · $106.70

How Washington licenses master electricians

Washington master electrician · “Master Electrician (01)

Statewide license

Verified September 14, 2026· 4 sources

Issued by Washington State Department of Labor & Industries, Electrical Program

Washington issues a statewide Master Electrician (01) certificate through the Department of Labor & Industries. To sit the master exam an applicant must have held a valid journey level electrician certificate for four years, and L&I applies this as four years certified as a general journey level electrician with L&I; WAC 296-46B-945 states that no out-of-state credit may be applied toward qualifying for the master exam. Master certificates cannot be obtained through reciprocity, and Washington has no master-level agreement with any state. An out-of-state master electrician therefore first obtains the Washington journey level (01) certificate, holds it for four years, and then takes the master exam. Certificates renew every three years with 24 hours of continuing education.

Moving to WashingtonLeaving Washington

Why Illinois has nothing to transfer

Illinois master electrician

Licensed by cities and counties

Verified September 14, 2026· 12 sources

Illinois does not issue a statewide master electrician license and has no state electrical board; the Illinois Department of Financial and Professional Regulation does not license electricians. The master-level credential exists only at the municipal level, under names that vary by city: Chicago issues a Supervising Electrician license (2 years of experience plus a written exam) and separately licenses Electrical Contractors, Springfield issues an Electrical License based on 5 years of experience and the ICC Master Electrician exam, and Peoria, Aurora, Naperville and Elgin accept ICC Master/Residential Electrician certificates or licenses from Illinois testing municipalities. An out-of-state master electrician license carries no state-level recognition in Illinois and none of the major jurisdictions publish a reciprocity or endorsement path for it. A master electrician from another state must apply with each municipality where they will work, which typically means passing the ICC or local exam once and then registering as an electrical contractor in each additional city.

How local licensing works in Illinois

How local licensing works. Illinois has no state electrician license and no state electrical board. The Illinois Municipal Code (65 ILCS 5/11-33-1) allows each municipality to require registration of electrical contractors, with an annual fee of $25, and provides that a contractor registered in one municipality cannot be required to register or pay a fee in another. Anything beyond registration (examinations, experience requirements, supervising or master licenses) comes from each city's or county's own ordinance.

Chicago. The Department of Buildings licenses Supervising Electricians (individuals) and Electrical Contractors (businesses); the supervising electrician is Chicago's equivalent of a master electrician. Eligibility for the supervising electrician exam is age 21 and at least 2 years of experience installing, altering, repairing and maintaining electrical wiring under a supervising electrician or equivalent, verified by supervisor letters. General and low-voltage exams are administered by Continental Testing Services (2026 fees: $150 per exam, $150 initial license, $150 annual renewal). An electrical contractor license ($150 initial, $150 renewal) is issued to a business, including a sole proprietorship, that is owned by or employs at least one licensed supervising electrician, who must perform or supervise all of the contractor's electrical work and may be the primary supervising electrician for only one contractor. Chicago's pages do not describe any reciprocity or endorsement for out-of-state licenses.

Springfield. The Building and Zoning Department issues an Electrical License to individuals who document 5 years of practical electrical experience with at least 2 years overseeing and directing electrical work and pass the ICC National Standard Master Electrician exam (W16). Applications go before the Springfield Electrical Commission; the fee is $25 and licenses expire December 31. A grandfather clause allows applicants licensed in another Illinois or out-of-state municipality with reciprocal testing to substitute proof of that exam only if the license was originally issued before 10/10/2007 and has not lapsed more than two years; otherwise the ICC exam is required.

Peoria. Electrical licenses are issued to individuals ($150 annual). Holders of Normal or Pekin licenses may register without testing; all others submit an ICC contractor exam certificate from the 2017 code cycle or newer.

Rockford. Registration only ($25 per calendar year, or free with proof of registration or license in another Illinois municipality); no exam.

Naperville and Aurora. Both accept current ICC certifications (Standard Master Electrician for commercial, Standard Residential Electrician for residential) or a license from a listed testing municipality (Naperville lists Chicago, Elgin, Libertyville, Orland Park, Ottawa, Peoria and Woodstock) in lieu of local testing. Naperville no longer renews or issues its own electrical licenses as of December 31, 2022 and registers electrical contractors through its Civic Access portal; Aurora requires a certificate of insurance naming the city.

Elgin. Requires a contractor's license from any Illinois city that gives a written NEC-based examination, or Elgin's own exam administered monthly through CLEC Enterprises.

Unincorporated Cook County. Electrical contractors must register with the Department of Building and Zoning ($150 initial, $75 annual renewal per trade), provide $1,000,000 general liability insurance naming the department, and submit a current supervising electrician's license from an Illinois city, town or village that has an electrical commission administering an examination.

Out-of-state holders. No reciprocity or endorsement path for other states' master licenses was found in any of these jurisdictions. The practical route is to pass the ICC National Standard Master Electrician exam (accepted by Springfield, Peoria, Aurora and Naperville) or a testing city's exam such as Chicago's, then register as an electrical contractor in each municipality where work will be performed.

Moving to IllinoisLeaving Illinois

Common questions

Do I have to take the Washington master electrician exam if I'm licensed in Illinois?
Yes. Washington requires the trade exam on this path.
How long do I need to have held my Illinois license?
At least 4 years before applying.
What does it cost to get a Washington master electrician license from Illinois?
Published fees on this path total $311.30, not counting exam vendor fees or bonds.
Do my Illinois work hours count in Washington?
No. Washington does not credit out-of-state hours on this path.
Does it work the other way, from Washington to Illinois?
Not necessarily. Reciprocity is directed. Going from Washington to Illinois, the mechanism is not applicable.

Sources

  1. L&I - Master Electrician Certificate · Washington State Department of Labor & Industries · Agency Page · verified September 14, 2026Requires at least 4 years certified as a general journey level electrician with L&I (2 years for specialties); master exam taken through PSI; renewal every three years with 24 CE hours.
  2. Application for a Reciprocal (01) General Journey Level Electrician Certificate (F500-148-000) · Washington State Department of Labor & Industries · Form · verified September 14, 2026States that Washington is party to a reciprocal agreement with Oregon and no other states, that a license not obtained through Oregon examination cannot be reciprocated, and that Washington master certificates cannot be obtained through reciprocity. PDF text was read through the search index; the file itself did not extract in this session.
  3. RCW 19.28.191 - Application for certificate of competency - Qualifications - Examination · RCW 19.28.191 · Washington State Legislature · Statute · verified September 14, 2026(1)(a): to take the master journey level exam the applicant must have possessed a valid journey level electrician certificate of competency for four years. (1)(c): journey level exam eligibility via 8,000-hour apprenticeship, an out-of-state journey level certificate obtained through examination in a jurisdiction requiring at least 8,000 supervised hours, 16,000 hours of out-of-state experience, or 8,000 hours in armed forces construction battalions.
  4. WAC 296-46B-909 - Electrical/telecommunications fees · WAC 296-46B-909 · Washington State Legislature · Admin Rule · verified September 14, 2026Fee table filed 5/5/26, effective 7/1/26. Journey level, specialty, or reciprocal electrician application (includes original certificate and processing) $114.60; journey level exam fee when administered by the department $80.30; master electrician exam application $204.60; master first-time exam fee $106.70, retest $125.00.
  5. WAC 296-46B-945 - Qualifying for master, journey level, specialty electrician examinations · WAC 296-46B-945 · Washington State Legislature · Admin Rule · verified September 14, 2026Journey level exam pathways include an out-of-state journey level certificate obtained by examination in a jurisdiction requiring 8,000 supervised hours (4,000 in new commercial/industrial), or 16,000 hours of out-of-state experience; documentation by notarized letters from licensed contractors, apprenticeship directors or employers. States: 'No credit may be applied from out-of-state toward qualifying for a master electrician certificate of competency examination.'
  6. WAC 296-46B-960 - Administrator and electrician certificate of competency examinations · WAC 296-46B-960 · Washington State Legislature · Admin Rule · verified September 14, 2026Open-book exam; minimum passing score 70 percent on any exam or section; two-week wait after a failure, three-month wait after three failures in a year; exam must be completed within one year of approval.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page