Illinois to Connecticut: master electrician license reciprocity
Illinois does not issue a statewide master electrician license, so there is nothing to transfer. Here is Connecticut's standard path for out-of-state applicants.
Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.
Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.
Contractor (E-1) by equivalent out-of-state license (all states)
Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.
A master electrician or electrical contractor licensed in any other state applies under DCP's 'Electrical Contractor - Equivalent Out of State License' path. DCP reviews a single out-of-state license for equivalency to the E-1: it must have required 720 classroom hours with a curriculum matching Exhibit A, 8,000 apprentice OJT hours and two years (4,000 hours) of licensed OJT, 12,000 hours in total. The applicant submits a copy of the license, an official license verification, the laws and regulations that set the requirements met to obtain it, and the scope of work for that license, with the non-refundable $150 application fee. If approved, the applicant must pass both the E-1 trade exam and the Business and Law exam through PSI ($59 per portion) and then pay the $150 initial license fee; the out-of-state license does not waive either exam because Connecticut has no reciprocal agreements. An applicant whose license is not found equivalent must document the classroom and OJT hours directly under the equivalent experience and training path.
The out-of-state license page does not restate the exam requirement; it follows from the Electrical License page, CGS 20-333 and the PSI bulletin, which states that all contractors must pass a Business and Law examination and a trade examination. CGS 20-333a allows licensure without examination only where the other state reciprocates for Connecticut licensees, and DCP states no such agreements exist. Whether DCP treats an out-of-state 'master' license (rather than a contractor license) as the E-1 equivalent depends on the hour and curriculum comparison; DCP publishes no list of accepted titles.
At a glance
- Trade exam
- Required
- Law / code exam
- Required
- Out-of-state hours
- Count toward eligibility
What you must already have
- Your Illinois license must be active and in good standing.
- The out-of-state license must be equivalent: it required 720 classroom hours matching Exhibit A, 8,000 apprentice OJT hours and 4,000 licensed OJT hours (12,000 total)Only one out-of-state license is reviewed for equivalency.
- You must document at least 12,000 hours of qualifying work experience.8,000 hours as an apprentice plus 2 years (4,000 hours) working as a licensed journeyperson.
What you'll do to get licensed in Connecticut
- 1Application fee. Pay the application fee ($150). Contractor application fee, non-refundable (CGS 20-333).
- 2Other. Copy of the out-of-state license, official license verification, the laws/regulations listing the requirements met to obtain it, and the scope of work for that license.
- 3Trade exam. Pass the destination's trade exam. E-1 Unlimited Electrical Contractor trade exam administered by PSI: 100 questions, 4 hours, 70% to pass, open book (2020 or 2023 NEC).
- 4Law / code exam. Pass a law, rules, or code exam. Connecticut Business and Law exam (PSI): 50 questions, 2 hours, 70% to pass, based on the NASCLA Contractors Guide to Business, Law and Project Management, Connecticut 6th edition.
- 5Exam fee. Pay the exam fee ($59). PSI fee for the trade portion (same fee for retakes).
- 6Exam fee. Pay the exam fee ($59). PSI fee for the Business and Law portion (same fee for retakes).
- 7License fee. Pay the license or certificate fee ($150). Initial license fee for a contractor's license after passing both exams (CGS 20-335); renews annually for $150.
Published fees on this path total $418, excluding exam-vendor fees, bonds, and insurance.
What you'll need to buy or arrange
Exam preparation
Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.
- Trade exam
- Law / code exam
- Exam fee · $59
- Exam fee · $59
How Connecticut licenses master electricians
Connecticut master electrician · “E-1 Unlimited Electrical Contractor”
Statewide license
Connecticut has no license titled 'master electrician'; the top-tier personal license is the E-1 Unlimited Electrical Contractor, issued by DCP to an individual (DCP licenses individuals, not companies) and permitting all electrical work under CGS 20-330, pulling permits and contracting with the public. A new E-1 applicant needs 720 classroom hours matching DCP's Exhibit A curriculum and 12,000 OJT hours (8,000 as an apprentice plus 4,000 hours, two years, working as a licensed journeyperson), reachable through two years as a Connecticut journeyperson, equivalent experience and training, or an equivalent out-of-state license, and must pass both the PSI E-1 trade exam (100 questions, 4 hours, 70%) and the Business and Law exam (50 questions, 2 hours, 70%). DCP states that Connecticut does not have reciprocal agreements with any other jurisdiction. Fees are a $150 application fee, $59 per exam portion and a $150 initial license fee; licenses expire every September 30 and renew for $150.
Why Illinois has nothing to transfer
Illinois master electrician
Licensed by cities and counties
Illinois does not issue a statewide master electrician license and has no state electrical board; the Illinois Department of Financial and Professional Regulation does not license electricians. The master-level credential exists only at the municipal level, under names that vary by city: Chicago issues a Supervising Electrician license (2 years of experience plus a written exam) and separately licenses Electrical Contractors, Springfield issues an Electrical License based on 5 years of experience and the ICC Master Electrician exam, and Peoria, Aurora, Naperville and Elgin accept ICC Master/Residential Electrician certificates or licenses from Illinois testing municipalities. An out-of-state master electrician license carries no state-level recognition in Illinois and none of the major jurisdictions publish a reciprocity or endorsement path for it. A master electrician from another state must apply with each municipality where they will work, which typically means passing the ICC or local exam once and then registering as an electrical contractor in each additional city.
How local licensing works in Illinois
How local licensing works. Illinois has no state electrician license and no state electrical board. The Illinois Municipal Code (65 ILCS 5/11-33-1) allows each municipality to require registration of electrical contractors, with an annual fee of $25, and provides that a contractor registered in one municipality cannot be required to register or pay a fee in another. Anything beyond registration (examinations, experience requirements, supervising or master licenses) comes from each city's or county's own ordinance.
Chicago. The Department of Buildings licenses Supervising Electricians (individuals) and Electrical Contractors (businesses); the supervising electrician is Chicago's equivalent of a master electrician. Eligibility for the supervising electrician exam is age 21 and at least 2 years of experience installing, altering, repairing and maintaining electrical wiring under a supervising electrician or equivalent, verified by supervisor letters. General and low-voltage exams are administered by Continental Testing Services (2026 fees: $150 per exam, $150 initial license, $150 annual renewal). An electrical contractor license ($150 initial, $150 renewal) is issued to a business, including a sole proprietorship, that is owned by or employs at least one licensed supervising electrician, who must perform or supervise all of the contractor's electrical work and may be the primary supervising electrician for only one contractor. Chicago's pages do not describe any reciprocity or endorsement for out-of-state licenses.
Springfield. The Building and Zoning Department issues an Electrical License to individuals who document 5 years of practical electrical experience with at least 2 years overseeing and directing electrical work and pass the ICC National Standard Master Electrician exam (W16). Applications go before the Springfield Electrical Commission; the fee is $25 and licenses expire December 31. A grandfather clause allows applicants licensed in another Illinois or out-of-state municipality with reciprocal testing to substitute proof of that exam only if the license was originally issued before 10/10/2007 and has not lapsed more than two years; otherwise the ICC exam is required.
Peoria. Electrical licenses are issued to individuals ($150 annual). Holders of Normal or Pekin licenses may register without testing; all others submit an ICC contractor exam certificate from the 2017 code cycle or newer.
Rockford. Registration only ($25 per calendar year, or free with proof of registration or license in another Illinois municipality); no exam.
Naperville and Aurora. Both accept current ICC certifications (Standard Master Electrician for commercial, Standard Residential Electrician for residential) or a license from a listed testing municipality (Naperville lists Chicago, Elgin, Libertyville, Orland Park, Ottawa, Peoria and Woodstock) in lieu of local testing. Naperville no longer renews or issues its own electrical licenses as of December 31, 2022 and registers electrical contractors through its Civic Access portal; Aurora requires a certificate of insurance naming the city.
Elgin. Requires a contractor's license from any Illinois city that gives a written NEC-based examination, or Elgin's own exam administered monthly through CLEC Enterprises.
Unincorporated Cook County. Electrical contractors must register with the Department of Building and Zoning ($150 initial, $75 annual renewal per trade), provide $1,000,000 general liability insurance naming the department, and submit a current supervising electrician's license from an Illinois city, town or village that has an electrical commission administering an examination.
Out-of-state holders. No reciprocity or endorsement path for other states' master licenses was found in any of these jurisdictions. The practical route is to pass the ICC National Standard Master Electrician exam (accepted by Springfield, Peoria, Aurora and Naperville) or a testing city's exam such as Chicago's, then register as an electrical contractor in each municipality where work will be performed.
Common questions
- Do I have to take the Connecticut master electrician exam if I'm licensed in Illinois?
- Yes. Connecticut requires the trade exam on this path, plus a law or code exam.
- What does it cost to get a Connecticut master electrician license from Illinois?
- Published fees on this path total $418, not counting exam vendor fees or bonds.
- Do my Illinois work hours count in Connecticut?
- Yes. Documented out-of-state experience counts toward Connecticut's eligibility requirements.
- Does it work the other way, from Connecticut to Illinois?
- Not necessarily. Reciprocity is directed. Going from Connecticut to Illinois, the mechanism is not applicable.
Sources
- Connecticut General Statutes Chapter 393 - Occupational Licensing (Electrical, Plumbing and Piping, Heating, Cooling...) · CGS §§ 20-333, 20-333a, 20-334a, 20-335 · Connecticut General Assembly · Statute · verified September 15, 2026§20-333: non-refundable application fee of $90 for limited licenses and journeyman-type licenses under 20-334a(a)(2)-(3) and $150 for unlimited contractor licenses under 20-334a(a)(1); competency is shown by examination. §20-333a Reciprocity: the Commissioner may grant a license without examination to a currently practicing, competent person holding a similar license from another state with substantially similar or higher requirements, but only if that state grants the same privilege to Connecticut licensees; DCP reports no such agreements exist. §20-334a(a)(1)(A): an unlimited contractor's license may be issued to a person who served as a journeyman in the trade for at least two years 'and, if such service as a journeyman was outside this state, has furnished evidence satisfactory to the appropriate state board or the department that such service is comparable to similar service in this state', and has passed the examination; (a)(2)(A): an unlimited journeyman's license requires a bona fide apprenticeship including not less than four years' experience and passing the state licensure examination. §20-335: initial license fee $150 for a contractor's license and $120 for any other license; licenses expire annually; renewal $150 contractor / $120 other. The page returned a TLS certificate error to the fetch tool on 2026-09-15 and was downloaded directly with curl to read the section text.
- Connecticut DCP - Electrical Contractor: Equivalent Experience and Training · Connecticut Department of Consumer Protection · Agency Page · verified September 15, 2026Fallback path when an out-of-state license is not found equivalent: E-1 needs 720 classroom hours equivalent to the Exhibit A courses, 8,000 apprentice OJT hours and 4,000 licensed OJT hours (12,000 total), documented by transcripts/diplomas, notarized employer letters with dates and work descriptions, and out-of-state completion certificates. Continuing-education and manufacturer certificates are not accepted, and OJT cannot substitute for classroom hours.
- Connecticut DCP - Electrical Contractor: Equivalent Out of State License · Connecticut Department of Consumer Protection · Agency Page · verified September 15, 2026Same equivalency definition as the journeyperson page. E-1 requires 8,000 apprentice OJT hours plus 2 years (4,000 hours) of licensed OJT for 12,000 total OJT hours, and 720 classroom hours matching Exhibit A (required courses). Same document list; only one out-of-state license is reviewed. Does not state exam requirements or fee amounts itself.
- Connecticut DCP - Electrical License (application paths, fees, renewal) · Connecticut Department of Consumer Protection · Agency Page · verified September 15, 2026Lists the six application paths (contractor: 2+ years as journeyperson, equivalent experience and training, equivalent out-of-state license; journeyperson: Connecticut apprenticeship, equivalent experience and training, equivalent out-of-state license). Application fee: contractor $150, journeyperson $90, non-refundable. Renewal: contractor $150, journeyperson $120; all licenses expire September 30 annually. States 'Separate fees will be due to the exam vendor at time of exam registration' and, verbatim, 'Connecticut does not have reciprocal agreements with any other jurisdiction.'
- Connecticut DCP - Electrical License Types and Scope of Work · Connecticut Department of Consumer Protection · Agency Page · verified September 15, 2026E-1 Unlimited Electrical Contractor: all electrical work as defined in CGS 20-330. E-2 Unlimited Electrical Journeyperson: all electrical work, only while employed by a properly licensed contractor. Also lists the limited classes (C-5/C-6, C-7/C-8, L-1/L-2, L-5/L-6, T-1/T-2, PV-1/PV-2).
- Connecticut DCP Occupational Licensing - Electrical Trades Candidate Information Bulletin (PSI, updated 2/4/2026) · Connecticut Department of Consumer Protection / PSI Services LLC · Other · verified September 15, 2026Eligibility for examination is determined by the State (DCP approves the application, then PSI schedules). Fee: $59 per examination portion, first attempt or retake, non-refundable. Journeypersons pass only a trade portion; contractors must pass both a trade portion and the Business and Law portion (50 questions, 2 hours, 70%, based on the NASCLA Contractors Guide, Connecticut 6th edition). E-1 Unlimited Electrical Contractor trade exam: 100 questions, 4 hours, 70%, open book. E-2 Unlimited Electrical Journeyperson: 80 questions, 3.5 hours, 70%, open book. Code questions are based on the 2020 or 2023 National Electrical Code. Eligibilities are valid for one year; a passed portion is valid for two years.
Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.