LicensebyState

Indiana to Virginia: master HVAC technician license reciprocity

No credit· Start overVerified September 15, 2026· 10 sources

Indiana does not issue a statewide master HVAC technician license, so there is nothing to transfer. Here is Virginia's standard path for out-of-state applicants.

Your origin state does not issue a statewide license at this level, so there is no license to transfer. The destination's standard out-of-state path is shown; expect to meet it in full.

Reference only, not legal advice. Rules change; confirm with the licensing board before you apply. Full disclaimer.

Universal License Recognition or exam eligibility for out-of-state masters (all states except Maryland)

Your out-of-state credentials give no advantage. You meet the destination's requirements from scratch.

A master HVAC technician or individually licensed HVAC contractor from any state without a reciprocal agreement applies on the Tradesman Universal License Recognition form (A501-2710ULR) for a 'Licensed Master HVAC (HVA)' license, which DPOR issues without the Virginia trade examination when the current out-of-state license has been held for at least three years, was obtained by examination in a state that also required education, training or experience, and there are no unresolved complaints or pending investigations; every state board that has licensed the applicant must send a Certification of Licensure/Letter of Good Standing dated within 90 days directly to the Tradesmen Program, and DPOR reserves the right to require an exam specific to Virginia law (Va. Code 54.1-205). An applicant whose license is younger than three years, or was not obtained by exam, instead files the Tradesman Exam & License Application ($171.75): a current out-of-state journeyman or master HVAC license is one of the listed qualifications to sit the PSI master exam ($125), so no years of experience need be documented. The fee printed on the ULR form is $130; the 2026 exam/license form charges $171.75 including the technology fee.

A state contractor license issued to a business (for example a Tennessee CMC-C or California C-20) may not satisfy ULR's requirement that the individual hold a license obtained by examination; the qualifying individual should ask DPOR whether the credential is treated as a personal license. DPOR had not republished the ULR form with the technology fee as of the verification date.

At a glance

Trade exam
Waived
Law / code exam
Not required
Out-of-state hours
Count toward eligibility
Typical processing
About 30 days

What you must already have

  • You must have held your Indiana license for at least 3 years.ULR route only: current out-of-state master HVAC license held at least three years
  • Your Indiana license must have been obtained by examination, not by reciprocity or grandfathering.
  • Your Indiana license must be active and in good standing.
  • You must have no disciplinary action or unresolved complaints on your record.

What you'll do to get licensed in Virginia

  1. 1Application fee. Pay the application fee ($130). Tradesman Universal License Recognition application fee as printed on form A501-2710ULR (2023); non-refundable. The 2026 exam/license form charges $171.75 including the technology fee..
  2. 2Other. Certification of Licensure/Letter of Good Standing from each state board where licensed, sent directly to the Board for Contractors - Tradesmen Program and dated within 90 days.
  3. 3Law / code exam. Pass a law, rules, or code exam (if applicable). DPOR may require an examination specific to Virginia law under Va. Code 54.1-205.
  4. 4Trade exam. Pass the destination's trade exam (if applicable). Only for applicants who do not meet the ULR criteria: PSI Virginia master HVAC exam ($125) via the Tradesman Exam & License Application ($171.75), for which an out-of-state journeyman or master license is itself the qualification.
  5. 5Continuing education. Complete continuing education. Three hours of board-approved International Mechanical Code continuing education each two-year renewal cycle.
  6. 6Contractor license. Hold or obtain a contractor license (if applicable). Class A, B or C Virginia contractor license from the Board for Contractors if contracting for work over $1,000.
  7. 7Other. EPA Section 608 technician certification (Type I/II/III/Universal) to handle refrigerants; federal, does not expire. Not a DPOR licensing prerequisite..

Published fees on this path total $130, excluding exam-vendor fees, bonds, and insurance.

What you'll need to buy or arrange

Exam preparation

Most boards contract PSI, Prov, or ICC for exams. Check which code edition the exam is written to before buying a prep course.

  • Law / code exam · if applicable
  • Trade exam · if applicable
  • Other

Continuing education

Renewals usually need approved CE hours, often on the latest NEC. Reciprocal licensees are rarely exempt.

  • Continuing education

Business registration

If you plan to contract in your own name, budget for a business license or entity registration on top of the trade license.

  • Contractor license · if applicable

How Virginia licenses master HVAC technicians

Virginia master HVAC technician · “Master Heating, Ventilation & Air Conditioning (HVA) Tradesman

Statewide license

Verified September 15, 2026· 7 sources

Issued by Virginia Board for Contractors, Tradesmen Program (DPOR)

Virginia issues a statewide Master HVAC tradesman license to individuals through the Board for Contractors' Tradesmen Program at DPOR. Under 18VAC50-30-39 a first-time applicant qualifies for the PSI master exam ($125) with one year of practical experience as a licensed journeyman, three years as a Virginia residential HVAC tradesman, or nine years of verified practical experience in the trade; the application fee on the 2026 form is $171.75 including the technology fee. A current journeyman or master HVAC license from another state is itself an accepted qualification to sit the master exam, and a licensee who has held an out-of-state license for at least three years may apply through Universal License Recognition and receive the master license without the Virginia trade exam. The Board's only HVAC reciprocity agreement is an examination reciprocity agreement with the Maryland HVACR Board covering journeyman and master licenses; the electrical agreements with Alabama, DC, Kentucky, North Carolina, Ohio and West Virginia do not extend to HVAC. The master tradesman license is a personal qualification; contracting for work over $1,000 requires a separate Class A, B or C contractor business license from the same Board. EPA Section 608 certification is required federally to handle refrigerants.

Moving to VirginiaLeaving Virginia

Why Indiana has nothing to transfer

Indiana master HVAC technician

Licensed by cities and counties

Verified September 15, 2026· 14 sources

Indiana has no statewide master HVAC, mechanical contractor or HVAC contractor license and no state HVAC board; the Indiana Professional Licensing Agency's list of regulated professions contains no heating, air conditioning or refrigeration trade, and Indianapolis's exam information states that licensing is at the discretion of each municipality. The master-level credential exists only locally and under varying names: Indianapolis/Marion County licenses Heating and Cooling Contractors (Air Conditioning A, B, D, Refrigeration and High Pressure Steam) whose craft license holder passed the Prov exam, Allen County (Fort Wayne) issues an HVAC Supervisors License (Air Conditioning A or B, Sheet Metal C), Evansville licenses Master Heating, Ventilating and Air Conditioner Installers and Master Refrigeration Installers by local examination, South Bend registers HVAC contractors on proof of a passing ICC National Standard Master Mechanical exam, and Terre Haute issues a Mechanical license to contractors employing a NATE, HVAC Excellence, RSES, Experior or Indianapolis-certified person. An out-of-state master HVAC or mechanical contractor license carries no state-level recognition in Indiana. Indianapolis is the only jurisdiction with a published reciprocity procedure, and it turns on the exam rather than the state: a license earned on a Prometric/Experior or Prov exam with a 70% score, certified by the issuing agency, can be accepted by the Board of Heating and Cooling Examiners. Elsewhere a master must apply in each city or county where they will pull permits, which in practice means holding an ICC or Prov national exam score or passing the local exam, then meeting that jurisdiction's bond and insurance rules. EPA Section 608 certification is required for refrigerant work in every jurisdiction.

How local licensing works in Indiana

How local licensing works. Indiana regulates plumbers at the state level but has never created a state HVAC or mechanical contractor license. Each city or county building department decides whether and how to license HVAC contractors and master-level installers, and there is no statewide portability rule. Prov (Indianapolis) and ICC/Prometric (South Bend, Terre Haute) national exams are the most portable credentials inside the state.

Indianapolis / Marion County. The Department of Business and Neighborhood Services licenses Heating and Cooling Contractors in five types: Air Conditioning A (unrestricted), Air Conditioning B (25 tons cooling / 500,000 BTU heating, boilers to 15 psig steam), Air Conditioning D (5 tons / 300,000 BTU), Refrigeration, and High Pressure Steam. A craft license holder submits an exam packet ten business days before the monthly Board of Heating and Cooling Examiners meeting: application, resume, employer letters verifying five years of HVACR experience (education may substitute in part), three industry reference letters, EPA certification card, driver's license; after a board interview the applicant sits the Prov exam and needs 70%. The business then files a $5,000 surety bond (obligee the Consolidated City of Indianapolis, expiring 12/31/2027), a $500,000/$100,000 (or $500,000 combined) liability certificate naming the City-County as additional insured, and workers' compensation proof. 2026 fees: new license holder $377 (Jan-Jun) or $283 (Jul-Dec), new business license $247 or $185 (none for sole proprietors), renewals $247 each; licenses expire December 31 of odd-numbered years. Reciprocity: the board may accept a comparable license from any municipality or government agency if the issuing agency certifies directly to the Department that the license is current and unsuspended, the license was issued on a standardized Prometric (formerly Thomson Prometric / Experior / Block) or Prov exam passed with at least 70%, and the vendor verifies the exam is equivalent to the Indianapolis exam; the applicant still documents five years of experience, three references and EPA certification, appears before the board, and then licenses with bond, insurance and fees.

Fort Wayne / Allen County. The Building Department's HVAC Supervisors License (Air Conditioning A without BTU limit, Air Conditioning B up to 500,000 BTU heating and 25 tons cooling, or Sheet Metal C) requires four years and 7,000 hours as a journeyman in the same line of work (or eight years and 14,000 hours of documented OJT plus 30 days as a licensed journeyman) and a passing examination administered by the Building Commissioner or an approved testing facility; hydronic and low-temperature refrigeration work is reserved to Non-Sanitary Piping licensees. The supervisor qualifies an HVAC Contractors Business Registration ($90; supervisor license $25). Section H grants reciprocity subject to the trade's guidelines and minimum qualifications, and allows the Building Commissioner to grant reciprocity at his discretion to applicants who present the necessary credentials.

Evansville. The Building Commission licenses Master Heating, Ventilating and Air Conditioner Installers (forced-air heating, air conditioning up to five tons with field piping or fifteen tons packaged, ventilation, ductwork and sheet metal; boilers and steam or hot-water systems require the Master Steam Fitter license) and Master Refrigeration Installers. Applicants prove four years of experience with three notarized letters on letterhead (EMC 5.70.060), are approved to test by the Board of Examiners of HVAC, Steam Fitters, and Refrigeration Installers, sit the exam through Ivy Tech and must score 75% on each part of the master mechanical, sheet metal, ventilation or refrigeration exam, then receive a provisional license on paying the $300 fee and providing insurance and the $25,000 surety bond required by EMC 5.70.070; renewal is $125 ($225 for two years) with board-set continuing education. The ordinance notes the master HVAC license does not permit air conditioning work without EPA certification.

South Bend. The Building Department registers HVAC contractors (including refrigeration and hood installers) after review of an application showing at least 21 years of age, journeyman and contractor experience (education may substitute for part of four years), and a passing score of at least 70% on the ICC National Standard Master Mechanical exam (F29-N) via Pearson Vue or Prometric or a comparable nationally recognized exam approved by the Board; a $5,000 surety bond naming the City of South Bend/St. Joseph County, workers' compensation proof, a $50 application review fee and $125 annual registration are required.

Terre Haute. The Engineering Department's Mechanical license is issued to a contractor that employs at least one full-time employee certified by NATE, HVAC Excellence, RSES, Experior Assessment, the City of Indianapolis HVAC Air Conditioning Class A, or an equivalent, with a $10,000 bond ($25,000 for right-of-way work), $500,000 general liability ($1,000,000 for right-of-way work) and workers' compensation or a WCE-1 exemption; $350 original registration, $175 annual renewal.

Out-of-state holders. Only Indianapolis publishes a reciprocity procedure, and it accepts a license from any jurisdiction (municipal or state) that was earned on an equivalent Prometric/Experior or Prov exam, subject to board approval. Allen County has a discretionary reciprocity clause; South Bend and Terre Haute accept national exam scores and industry certifications regardless of where they were earned; Evansville requires its own examination. Expect to license separately in each jurisdiction and to meet each one's bond and insurance rules.

Moving to IndianaLeaving Indiana

Common questions

Do I have to take the Virginia master HVAC technician exam if I'm licensed in Indiana?
No. The trade exam is waived on this path.
How long do I need to have held my Indiana license?
At least 3 years before applying.
What does it cost to get a Virginia master HVAC technician license from Indiana?
Published fees on this path total $130, not counting exam vendor fees or bonds.
Do my Indiana work hours count in Virginia?
Yes. Documented out-of-state experience counts toward Virginia's eligibility requirements.
How long does the application take?
The board's published or typical processing time is about 30 days.
Does it work the other way, from Virginia to Indiana?
Not necessarily. Reciprocity is directed. Going from Virginia to Indiana, the mechanism is not applicable.

Sources

  1. EPA Section 608 Technician Certification Requirements · 40 CFR Part 82, Subpart F (Clean Air Act §608) · U.S. Environmental Protection Agency · Other · verified September 15, 2026Federal requirement in every state: technicians who maintain, service, repair or dispose of equipment that could release refrigerants into the atmosphere must be certified (Type I small appliances, Type II high-pressure, Type III low-pressure, Universal). Apprentices under direct supervision are exempt. Certification does not expire; the core exam must be proctored for Universal certification. State HVAC boards commonly require it before licensure, but it is not itself a state license.
  2. 18VAC50-30-100 - Examination fees · 18VAC50-30-100 · Virginia Board for Contractors / Virginia Register · Admin Rule · verified September 15, 2026Amended effective March 11, 2026. Exam fees are set by the Board's vendor contract and may not exceed $200 for a journeyman exam or $225 for a master exam; the current PSI fees on the Tradesmen page are $100 and $125.
  3. 18VAC50-30-39 - Evidence of ability and proficiency (tradesman qualifications) · 18VAC50-30-39 · Virginia Board for Contractors / Virginia Register · Admin Rule · verified September 15, 2026Effective April 1, 2025 (replacing repealed 18VAC50-30-40). Journeyman pathways: engineering bachelor's plus one year, associate degree plus two years, 240 hours vocational training plus four years, 160 plus five, 80 plus six, 40 plus seven, or eight years of experience. Master pathways: three years holding a valid residential HVAC tradesman license, one year as a licensed journeyman in the trade, or nine years of practical experience. The regulation does not itself address out-of-state licenses; those are handled through the application form's out-of-state qualification option, reciprocity and ULR.
  4. 18VAC50-30-90 - Fees (individual licenses and certifications) · 18VAC50-30-90 · Virginia Board for Contractors / Virginia Register · Admin Rule · verified September 15, 2026Effective August 1, 2025: original tradesman license with or without examination $150; card exchange $110; additional tradesman designation $105. All fees are non-refundable. The 2026 application form adds the statutory technology fee, giving $171.75.
  5. Virginia Board for Contractors - Reciprocal Licensing/Examination Agreements with Other Jurisdictions · Virginia Board for Contractors (DPOR) · Agreement Document · verified September 15, 2026Board-approved list. The only HVAC entry is: 'Maryland HVAC Board Journeyman and Master HVA Tradesman License and Virginia Journeyman and Master HVA License Examination Reciprocity.' All other entries concern electrical tradesmen (AL, DC, KY, MD, WV, NC, OH) or WSSC plumbers and gas fitters. Anyone applying under an agreement must meet all of its terms and submit a complete application with verification of licensure from the out-of-state board.
  6. Form A501-2710EXLIC - Tradesman Exam & License Application (v8, 07/01/2026) · Virginia Board for Contractors (DPOR) · Form · verified September 15, 2026Designations include Journeyman and Master Heating, Ventilation & Air Conditioning (HVA). Methods of licensure: Examination (1005), Reciprocity (1021) and Apprenticeship Program (1022) at $171.75 each, Card Exchange (1023) at $131.75; the fees include the $7.25-per-year Technology Fee added by 2026 House Bill 30. Question 10 lets an applicant list a current tradesman license from another jurisdiction 'to qualify you for the tradesman examination' or for reciprocity, with a Certification/Letter of Good Standing. Journeyman qualification options include 'Individuals currently certified or licensed as a journeyman or master by governing body located outside the Commonwealth of Virginia'; master options are one year as a licensed journeyman, three years as a Virginia residential HVAC or plumber tradesman, nine years of practical experience, or a current out-of-state journeyman or master license. Anyone performing work over $1,000 must also hold a Virginia contractor license.
  7. Board for Contractors - Tradesman Licensing Information and Application Instructions · Va. Code 54.1-1128 to 54.1-1131 · Virginia Board for Contractors (DPOR) · Other · verified September 15, 2026States that tradesman licenses are issued to individuals, not companies. Explains that an out-of-state license can be reviewed 'for experience or eligibility to sit for the exam or reciprocity' when a Certification/Letter of Good Standing showing the license number, initial date, expiration, means of licensure and closed disciplinary actions is provided.
  8. Form A501-2710ULR - Tradesman Universal License Recognition Application (v2, 08/14/2023) · Virginia Board for Contractors (DPOR) · Form · verified September 15, 2026Offers 'Licensed Journeyman Heating, Ventilation & Air Cond. (HVA)' and 'Licensed Master HVAC (HVA)' (transaction code 1021, licensure without examination) and 'Unlicensed Journeyman/Master HVAC (HVA) - ULR by exam' (code 1005), $130 each, non-refundable. Licensed applicants must have held the current out-of-state license for at least 3 years, the issuing state must have required an examination and education/training/experience, there must be no unresolved complaints or pending investigations, and every state board that has licensed the applicant must send a Certification of Licensure/Letter of Good Standing dated within 90 days directly to the Tradesmen Program. The form states DPOR may require an examination specific to Virginia law under Va. Code 54.1-205. Applicants from states that do not regulate the trade need 3 years of employment, an Experience Verification Form, and must take the Virginia exam unless they have passed one elsewhere.
  9. DPOR Board for Contractors - Tradesmen Program · Virginia Department of Professional and Occupational Regulation · Agency Page · verified September 15, 2026Program page for journeyman and master tradesman licenses in electrical, plumbing, HVAC and gas fitting. Exams are administered by PSI: $100 for a journeyman tradesman exam, $125 for a master tradesman exam. HVAC journeyman and master licensees complete three hours of board-approved continuing education on the International Mechanical Code each two-year renewal cycle. Links the Tradesman Exam & License Application (A501-2710EXLIC), the Residential Tradesman application (A501-2709EXLIC, launched April 1, 2025), the Universal License Recognition application (A501-2710ULR) and the reciprocal agreements list.
  10. DPOR - Universal License Recognition · Va. Code 54.1-204, 54.1-205 · Virginia Department of Professional and Occupational Regulation · Agency Page · verified September 15, 2026ULR applies to an applicant who holds a valid out-of-state license or certification in an occupation with a similar scope of practice, has been licensed there for at least one year, passed an examination and met training standards, has no disciplinary actions or pending investigations, has no disqualifying criminal history, and pays the Virginia fees. Tradesmen certifications are among the listed occupations.

Verified dates are when a person last opened each source and confirmed the facts above. Cite the board, not us.

Report an error on this page

Related